RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD.
Activity
| Type | SSIC code | Description |
|---|---|---|
| Primary | 41009 | INSTRUMENTATION AND GEOTECHNICAL ENGINEERING. |
| Secondary | 43129 | INSTRUMENTATION AND GEOTECHNICAL ENGINEERING. |
Part of SSIC section F — Construction.
Registered address
8, ENTERPRISE ROAD 629820 — Boon Lay, Jurong, Tuas
Filing due dates
| Filing | Due date |
|---|---|
| Annual return | 2025-12-26 |
| Financial statement / accounts | 2027-01-30 |
Most private companies must file an annual return with ACRA within 7 months of their financial year end (5 months for listed companies) — seeannual return and financial statement deadlines for the exceptions.
Government tenders awarded (GeBIZ)
| Agency | Description | Awarded | Amount |
|---|---|---|---|
| Building and Construction Authority | MAINTENANCE OF BCA TREMOR MONITORING SYSTEM (TMS) FOR 37 BUILDINGS | 2021-09-27 | S$1,298,928 |
| Building and Construction Authority | MAINTENANCE OF BCA TREMOR MONITORING SYSTEM (TMS) FOR 37 BUILDINGS FOR TWO (2) YEARS, WITH OPTION TO EXTEND FOR ANOTHER TWO (2) YEARS | 2025-09-26 | S$636,024 |
| Housing and Development Board | INSTRUMENTATION MONITORING SERVICES FOR INFRASTRUCTURE WORKS FOR HDB DEVELOPMENT | 2022-04-29 | S$117,278 |
| Housing and Development Board | INSTRUMENTATION AND MONITORING WORKS (AUTOMATED TUNNEL MONITORING SYSTEM) FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT WOODLANDS NEIGHBOURHOOD 5 CONTRACT 25 | 2022-12-09 | S$967,691 |
| Housing and Development Board | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT - PROJECT AE | 2023-12-29 | S$119,979 |
| Housing and Development Board | INSTRUMENTATION AND MONITORING WORKS FOR INFRASTRUCTURE WORKS AT TOA PAYOH WEST (CONTRACT 1) | 2024-03-11 | S$509,474 |
| Housing and Development Board | Soil Investigation Works on HDB Land at Bedok South Avenue 3 | 2024-07-30 | S$190,200 |
| Housing and Development Board | INSTRUMENTATION AND MONITORING WORKS INCLUDING AUTOMATED TUNNEL MONITORING SYSTEM FOR THE PROPOSED PUBLIC HOUSING AT TAMPINES SIMEI CONTRACT 24 & PARK | 2025-02-07 | S$390,190 |
| Housing and Development Board | SITE INVESTIGATION PHASE 1 FOR PROPOSED DEVELOPMENT | 2025-06-13 | S$2,600,989 |
| Housing and Development Board | INSTRUMENTATION AND MONITORING WORKS FOR THE PROPOSED PUBLIC HOUSING AT PROJECT BL (TOTAL: 683 DWELLING UNITS) | 2025-05-16 | S$62,855 |
| Housing and Development Board | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT DM AND PROJECT DN | 2025-09-11 | S$146,010.5 |
| Housing and Development Board | Instrumentation Monitoring Services for (A) Realignment of Drain in Tengah Town, (B) Construction of Road and Drain at Plantation Walk, (C) Construction of Trunk Sewer at Plantation Walk, (D) Site Preparation Works at Tengah Town (Phase 6), (E) Construction of Outlet Drains at Tengah Town (Phase 3) | 2025-11-17 | S$24,057 |
| Ministry of Health-Ministry Headquarter | Invitation to Tender for Soil Investigation Works for the proposed co-located development of a nursing home, polyclinic, kidney dialysis centre and park at Jalan Damai, Singapore | 2021-06-04 | S$120,614 |
| Ministry of Health-Ministry Headquarter | Invitation To Tender For Instrumentation And Monitoring Works For The Proposed Development Of An Integrated Acute And Community Hospital At Bedok North, Singapore | 2022-10-11 | S$1,750,000 |
| Ministry of Health-Ministry Headquarter | INVITATION TO TENDER FOR SOIL INVESTIGATION WORKS FOR THE PROPOSED REDEVELOPMENT OF ALEXANDRA HOSPITAL AT ALEXANDRA ROAD, SINGAPORE | 2022-12-18 | S$540,195 |
| Jurong Town Corporation | PROPOSED INSTRUMENTATION AND MONITORING WORKS FOR (A) DLN RAMP AND ASSOCIATED FACILITY BUILDINGS AND (B) ROAD TUNNEL LINKING BAHAR TO BULIM (PART 1) | 2021-04-27 | S$557,000 |
| Jurong Town Corporation | 2-Year Term Contract for Geophysical and Survey Works for JTC Estates | 2022-05-13 | S$1 |
| Jurong Town Corporation | 2-Year Term Contract for Soil Investigation Works Within JTC Estate | 2024-05-15 | S$1 |
| Jurong Town Corporation | 2-Year Term Contract for Geophysical and Survey Works for JTC Estates | 2024-05-15 | S$1 |
| Jurong Town Corporation | INSTRUMENT MONITORING WORKS FOR PROPOSED COASTAL DEVELOPMENT | 2024-10-24 | S$2,170,000 |
| Land Transport Authority | Instrumentation and Monitoring for Jurong Region Line (Phase 2) | 2021-04-26 | S$6,472,060 |
| Land Transport Authority | Supply, Installation and Monitoring of Instruments for Contracts P1090A & P1090B | 2021-05-25 | S$1,764,548 |
| Land Transport Authority | Instrumentation and Monitoring for Cross Island Line Phase 1 Civil Contracts Package 1 | 2021-10-12 | S$18,696,747.1 |
| Land Transport Authority | Instrumentation and Monitoring for Jurong Region Line (Phase 3) | 2021-10-29 | S$4,446,364 |
| Land Transport Authority | Tremor Monitoring System 2.0 for Transport Infrastructures | 2021-10-20 | S$1,999,900 |
| Land Transport Authority | Provision of Site Investigation Works for LTA Projects | 2022-07-19 | S$4,435,180 |
| Land Transport Authority | Supply, Installation and Monitoring of Instruments for Contract CR202 | 2023-03-23 | S$6,562,855 |
| Land Transport Authority | SUPPLY, INSTALLATION AND MONITORING OF INSTRUMENTS FOR CRL-PUNGGOL EXTENSION CONTRACT P105 | 2023-03-23 | S$2,833,880.4 |
| Land Transport Authority | Supply, Installation and Monitoring of Instruments for CRL-Punggol Extension Contract P102 | 2023-05-24 | S$5,449,044.8 |
| Land Transport Authority | Tunnelling and Excavation Monitoring System | 2024-02-07 | S$18,347,000 |
| Land Transport Authority | Supply, Installation and Monitoring of Instruments for Contracts CR208 and CR209 | 2024-03-25 | S$4,251,077.1 |
| Land Transport Authority | Supply, Installation and Monitoring of Instruments for Contract CR205 and CR206 | 2024-03-25 | S$4,552,101.5 |
| Land Transport Authority | Provision of Site Investigation Works | 2024-06-06 | S$4,490,223 |
| Land Transport Authority | Supply, Installation and Monitoring of Instruments for Contract DE151 | 2025-11-20 | S$1,529,005.8 |
| Land Transport Authority | Provision of Geophysical Look-Ahead System for Tunnelling in Contracts CR202 and CR203 | 2026-02-23 | S$3,390,350 |
| Ministry of Home Affairs - Ministry Headquarter 1 | SUPPLY, INSTALLATION AND MONITORING OF INSTRUMENTS FOR REDEVELOPMENT OF POLICE OFFICE BUILDING AT UBI AVENUE 2 / PAYA LEBAR ROAD | 2024-09-25 | S$850,870 |
| Ministry of Home Affairs - Ministry Headquarter 1 | PROPOSED SOIL INVESTIGATION WORKS FOR THE CONSTRUCTION OF FACILITIES AT HOME TEAM TACTICAL CENTRE, SINGAPORE | 2025-04-22 | S$480,807 |
| Ministry of Home Affairs - Ministry Headquarter 1 | SOIL INVESTIGATION WORKS FOR PROPOSED POWER RESILENCY & LIFE CYCLE REPLACEMENT OF ELECTRICAL INFRASTRUCTURE UPGRADING FOR LAND CHECKPOINTS PHASE 1B, 2A AND 2B | 2025-08-20 | S$160,257 |
| National Environment Agency | Provision of Instrumentation and Monitoring Services | 2021-09-16 | S$113,700 |
| National Environment Agency | Tender for Soil Investigation for Proposed Redevelopment of Choa Chu Kang Cemetery (Phases 4A and 4B) | 2024-07-08 | S$344,100 |
| Public Utilities Board | Instrumentation and Monitoring Works for Proposed Water Pipelines from Tuas Water Reclamation Plant to Jurong Island Highway | 2021-09-09 | S$4,550,000 |
| Public Utilities Board | Leasing of Automated Geotechnical Instrumentation and Data System at Estuarine Reservoirs in Singapore | 2021-10-22 | S$4,130,000 |
| Public Utilities Board | Provision of Electrical Resistivity Survey Services | 2024-03-20 | S$809,000 |
| Public Utilities Board | Instrumentation and Monitoring Works for Proposed Expansion of Sewerage Networks in Senoko Way, Woodlands Avenue 6 and Upper Bukit Timah Areas | 2024-06-06 | S$885,445 |
| Public Utilities Board | Instrumentation and Monitoring Works for Proposed 500mm Diameter NEWater Pipeline from Tampines Expressway to Seletar North Link | 2024-08-27 | S$299,030 |
| Public Utilities Board | Instrumentation and Monitoring Works for Tuas View Area, Punggol and Sengkang Areas and Bishan, Tampines, Joo Chiat and River Valley Areas | 2025-11-19 | S$1,702,449.5 |
| Sentosa Development Corporation | INSTRUMENTATION AND MONITORING WORKS FOR THE PROPOSED DEEP GRAVITY SEWERS PROJECT AT SENTOSA | 2021-07-30 | S$3,565,980 |
BCA contractor registration
| Workhead | Grade | Registration expires |
|---|---|---|
| CW02 — Civil Engineering | C2 | 2026-10-01 |
| CR08 — Piling Works | L1 | 2026-10-01 |
| CR12 — Ground Support and Stabilisation Works | L5 | 2026-10-01 |
| CR15 — Site Investigation, Instrumentation and Monitoring | Single Grade | 2026-10-01 |
| SY05 — Electrical & Electronic Materials, Products & Components | L1 | 2026-10-01 |
About this data
- RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. has been on ACRA's register since 2005, 21.7 years as of September 2026.
- It has been awarded 47 government tenders through GeBIZ, worth S$119,313,462.7 in total.
- Besides its main activity, it is also registered for a secondary activity: instrumentation and geotechnical engineering..
- Its last annual return was filed in 2025, over a year before this data was collected.
- It holds 5 BCA contractor registrations, across workheads CW02, CR08, CR12, CR15, SY05.
See what is a UEN andhow to check if a Singapore company is registered and live for background on the fields above.
Companies with the same activity nearby
Contains information from ACRA Information on Corporate Entities accessed on 2026-09-16 from data.gov.sg, made available under the terms of the Singapore Open Data Licence version 1.0. Government tender data from GeBIZ Government Procurement, same licence. Contractor registration data from BCA Listing of Registered Contractors, same licence.
Not an official business profile. For official records use bizfile.gov.sg.
Spotted an error, or want this page removed? Use the contact form — no justification required for removal.