Government tenders awarded by Housing and Development Board
- 506 companies have won 1072 government tenders awarded by Housing and Development Board through GeBIZ, worth S$33,037,820,576.49 in total, as of 2026-09-16.
See how GeBIZ tenders work for how an award ends up here and what it does and doesn't confirm.
Awarded tenders
| Company | Description | Awarded | Amount |
|---|---|---|---|
| CONCORDE SECURITY PTE. LTD. | PROVISION OF SECURITY SERVICES AT HDB HUB | 2026-03-31 | S$943,770 |
| STRATEGIC ENGINEERING & CONSTRUCTION PTE. LTD. | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 3 PROJECT 1 WEST ZONE | 2026-03-31 | S$32,880,000 |
| SPECIALIST ELECTRIC PTE LTD | Mechanical And Electrical Cyclical Improvement Works To Multi-Storey Car Parks (Batch 37) | 2026-03-25 | S$4,495,800 |
| RAFFLES MEDICAL GROUP LTD | PROVISION TO MANAGE PRIMARY HEALTHCARE SERVICES FOR HDB STAFF FOR A PERIOD OF THREE YEARS | 2026-03-25 | S$54 |
| WILLY INSURANCE BROKERS PTE. LTD. | FIRE INSURANCE COVERAGE FOR HDB PROPERTIES FOR THE PERIOD 1 APRIL 2026 TO 31 MARCH 2029 | 2026-03-25 | S$2,985,000 |
| HITACHI ELEVATOR ASIA PTE. LTD. | THIRTY-SEVENTH TERM CONTRACT FOR THE SUPPLY, DELIVERY, INSTALLATION AND MAINTENANCE OF LIFTS FOR THREE-YEAR PERIOD | 2026-03-20 | S$20,982,055 |
| 5 LANDMARK CONSTRUCTION PTE. LTD. | DESIGN AND RENOVATION WORKS FOR HDB HOLIDAY BUNGALOWS | 2026-03-20 | S$605,950 |
| GOOD LINK ENGINEERING & CONSTRUCTION PTE. LTD. | Part A: Realignment of Sewer at Ang Mo Kio Avenue 2; Part B: Construction of Bus Shelters along Sumang Lane | 2026-03-19 | S$1,600,000 |
| ASPACIO DESIGN ASSOCIATES PTE LTD | DESIGN AND RENOVATION WORKS TO THE MEZZANINE LEVEL AND LIFT LOBBIES OF HDB CENTRE OF BUILDING RESEARCH (CBR) | 2026-03-18 | S$967,636 |
| LCS PTE. LTD. | Supply Of Ordinary Portland Cement To The HDB (Batch 60) | 2026-03-17 | S$88.33 |
| RIGHT CONSTRUCTION PTE LTD | PART A: BUILDING WORKS AT PROJECT DI (TOTAL: 193 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2026-03-17 | S$61,000,000 |
| H P CONSTRUCTION & ENGINEERING PTE LTD | PROJECT 1: PART A: BUILDING WORKS AT PROJECT GC (TOTAL: 637 DWELLING UNITS); PART B: CONTINGENCY WORKS. PROJECT 2 : PART A: BUILDING WORKS AT PROJECT EB (TOTAL: 255 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2026-03-17 | S$211,800,000 |
| HAO DA PTE LTD | Infrastructure Works at Kallang Whampoa (Phase 2) | 2026-03-13 | S$9,548,709 |
| ELEMENT CONSTRUCTION TESTING (S) PTE. LTD. | TERM CONTRACT FOR TESTING SERVICES ON PAINTS | 2026-03-11 | S$12,462.25 |
| HL BUILDING MATERIALS PTE. LTD. | TERM CONTRACT FOR THE PRODUCTION, SUPPLY AND DELIVERY OF PRECAST HOUSEHOLD SHELTER (PHS) TO VARIOUS HDB BUILDING SITES (BATCH 1) | 2026-03-06 | S$2,021.53 |
| SING TEC DEVELOPMENT PTE. LTD. | Infrastructure Works at Yishun Contract No. 3 | 2026-03-06 | S$24,900,000 |
| SETSCO SERVICES PTE LTD | Term Contract for the Provision of Testing Services for Semi-Destructive and Non-Destructive Tests on HDB Buildings (Batch 19) | 2026-03-06 | S$160.5 |
| INTEGRATED PRECAST SOLUTIONS PTE. LTD. | TERM CONTRACT FOR THE PRODUCTION, SUPPLY AND DELIVERY OF PRECAST HOUSEHOLD SHELTER (PHS) TO VARIOUS HDB BUILDING SITES (BATCH 2) | 2026-03-06 | S$2,097 |
| AVENUE ENGINEERING PTE. LTD. | MAJOR INFRASTRUCTURE AND CONSTRUCTION OF ROAD RELATED FACILITIES AT WOODLANDS TOWN N9. (A) CONSTRUCTION OF WOODLANDS NORTH LINK; (B) CONSTRUCTION OF WOODLANDS NORTH ROAD PT1 & RETAINING WALL; (C) CONSTRUCTION OF TRUNK SEWER AT WOODLANDS N9; (D) DRAIN UPGRADING AT ADMIRALTY ROAD; (E) CONSTRUCTION OF COVERED LINKWAY AT WOODLANDS NORTH; (F) CONSTRUCTION OF BUS SHELTER AT WOODLANDS NORTH. | 2026-03-04 | S$58,700,000 |
| CPG CONSULTANTS PTE LTD | SPECIALIST ACCREDITED CHECKING SERVICES FOR MOUNT PLEASANT C5-C6 | 2026-03-02 | S$60,000 |
| INDUSTRIAL & COMMERCIAL FACILITIES MANAGEMENT PTE. LTD. | MANAGEMENT AND MAINTENANCE OF HDB PROPERTIES FOR A PERIOD OF 3 YEARS (2026 TO 2029) | 2026-02-27 | S$5,600 |
| SAMWOH RESOURCES PTE LTD | Supply of 20MM Aggregate to the HDB (Batch 97) | 2026-02-12 | S$23.28 |
| PH CONSULTING PTE. LTD. Not yet published | SPECIALIST ACCREDITED CHECKING SERVICES FOR MOUNT PLEASANT C1-C4 | 2026-02-12 | S$56,660 |
| LANDSCAPE ENGINEERING PTE LTD | CONSTRUCTION OF ROAD RELATED FACILITIES (RRF) AT TENGAH TOWN (PHASE 4) | 2026-02-11 | S$6,248,988 |
| HI-TACT SOLUTIONS & TRADING PTE. LTD. | DEMOLITION WORKS FOR PROJECT A (Batch 30) | 2026-02-10 | S$2,195,000 |
| AAE-CFM PTE. LTD. Not yet published | Provision of Management Services (Contract 17) | 2026-02-05 | S$15,980 |
| TTS GROUP PTE. LTD. Not yet published | PROVISION OF TRANSPORT IMPACT ASSESSMENT CONSULTANCY SERVICES FOR NORTH PLANNING AREA | 2026-02-04 | S$110,650 |
| ACEPLP.COM PTE LTD Not yet published | Development of Building Information Modelling Models for HDB's Modularised Unit Layouts and Components | 2026-02-03 | S$65,800 |
| JIN CHOON CIVIL ENGINEERING PTE. LTD. | (A) Construction of Trunk Sewer at Jurong East N4; (B) Construction of Trunk Sewer at Clementi N4 | 2026-02-02 | S$8,645,730 |
| MASON MILLER PTE. LTD. Not yet published | DESIGN AND RECONFIGURATION WORKS FOR OFFICE SPACE AT EAST WING, LEVEL 12 OF HDB HUB | 2026-02-02 | S$614,838.88 |
| BELMACS PTE LTD | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | 2026-01-26 | S$11,260 |
| LT&T AVID ARCHITECTS PTE. LTD. Not yet published | APPOINTMENT OF REGISTERED INSPECTORS (ARCHITECTURAL) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | 2026-01-26 | S$16,341 |
| PROSPAQ GROUP PTE. LTD. | Supply of Fine Aggregates to the HDB (Batch 87) | 2026-01-22 | S$27.48 |
| HD CONTRACTOR PTE. LTD. | ADDITION AND ALTERATION (A&A) WORKS FOR HDB CORPORATE FLOORS (HDB HUB) | 2026-01-19 | S$3,199,000 |
| SUNRAY WOODCRAFT CONSTRUCTION PTE LTD | PROPOSED ADDITION AND ALTERATION WORKS TO EXISTING MND COMPLEX | 2026-01-14 | S$37,477,500 |
| HWA AIK ENGINEERING PTE. LTD. | Demolition Works for Project B (Batch 31) | 2026-01-14 | S$555,000 |
| WETEC PTE. LTD. | DESIGN, SUPPLY, INSTALLATION AND OPERATION OF ENVIRONMENTAL SENSORS TO EVALUATE EFFECTIVENESS OF MARKET AVAILABLE COOLING APPLIANCES IN HDB UNITS | 2026-01-12 | S$78,459 |
| SCT CONSTRUCTION PTE. LTD. | PROJECT 1: A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G35A; B) CONTINGENCY WORKS. PROJECT 2: ENHANCEMENT FOR ACTIVE SENIORS (EASE) FOR PRIVATE HOUSING (SOUTH EAST ZONE - PACKAGE 1) | 2026-01-09 | S$43,088,900.1 |
| PROGRESSIVE BUILDERS PRIVATE LIMITED | PROJECT 1: A) DESIGN & BUILD OF UPGRADING PROJECTS FOR G35D; B) CONTINGENCY WORKS. PROJECT 2: ENHANCEMENT FOR ACTIVE SENIORS (EASE) FOR PRIVATE HOUSING (NORTH EAST ZONE - PACKAGE 1) | 2026-01-09 | S$36,300,000.1 |
| CHUAN LIM CONSTRUCTION PTE LTD | PROJECT 1: (A) DESIGN & BUILD OF UPGRADING PROJECTS FOR G35C; (B) CONTINGENCY WORKS. PROJECT 2: EASE FOR PRIVATE HOUSING (CENTRAL ZONE - PACKAGE 2) | 2026-01-09 | S$36,335,356.1 |
| W'RAY CONSTRUCTION PTE. LTD. | PROJECT 1: (A) DESIGN & BUILD OF UPGRADING PROJECTS FOR G35E; (B) CONTINGENCY WORKS. PROJECT 2: EASE FOR PRIVATE HOUSING (NORTH WEST & SOUTH WEST ZONE - PACKAGE 1) | 2026-01-09 | S$40,966,012.1 |
| TRUST-BUILD ENGINEERING & CONSTRUCTION PTE. LTD. | PROJECT 1: A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G35B B) CONTINGENCY WORKS PROJECT 2: ENHANCEMENT FOR ACTIVE SENIORS (EASE) FOR PRIVATE HOUSING (CENTRAL ZONE - PACKAGE 1) | 2026-01-09 | S$37,508,028 |
| HEPTACON CONSTRUCTION PTE. LTD. | PROJECT 1: (A) DESIGN & BUILD OF UPGRADING PROJECTS FOR G35F; (B) CONTINGENCY WORKS. PROJECT 2: EASE FOR PRIVATE HOUSING (NORTH EAST ZONE - PACKAGE 2) | 2026-01-09 | S$42,380,000 |
| HI-TEK CONSTRUCTION PTE. LTD. | PROJECT 1: (A) DESIGN & BUILD OF UPGRADING PROJECTS FOR G35G; (B) CONTINGENCY WORKS. PROJECT 2: EASE FOR PRIVATE HOUSING (NORTH WEST & SOUTH WEST ZONE - PACKAGE 2) | 2026-01-09 | S$31,600,000.1 |
| HTC CONSTRUCTION PTE. LTD. | PROJECT 1: A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G35H; B) CONTINGENCY WORKS. PROJECT 2: ENHANCEMENT FOR ACTIVE SENIORS (EASE) FOR PRIVATE HOUSING (SOUTH EAST ZONE - PACKAGE 2) | 2026-01-09 | S$39,970,000.1 |
| FONG CONSULT PTE. LTD. Not yet published | Periodic Structural Inspection and Related Works at Various HDB Estates (Batch 47A-2025/26/27) | 2026-01-09 | S$710 |
| WIDE WINGS PTE. LTD. Not yet published | APPOINTMENT OF SITE SUPERVISORS FOR DEMOLITION OF QUICK BUILT DORMITORIES AT 5A, 7A, 11A CHOA CHU KANG GROVE AND 10A EUNOS ROAD 1 | 2026-01-07 | S$29,996 |
| SETSCO SERVICES PTE LTD | Term Contract for the Provision of Testing Services for Semi- Destructive and Non-Destructive Tests on HDB Buildings (Batch 17) | 2026-01-06 | S$145.4 |
| FONG YUE DEVELOPMENT PTE. LTD. | REMAKING OUR HEARTLAND BATCH 4 - PARK UPGRADING PROGRAMME IN CHOA CHU KANG AND QUEENSTOWN TOWN | 2026-01-06 | S$8,022,000 |
| NANYANG ENVPAP PTE. LTD. | SUPPLY AND DELIVERY OF ENVELOPES TO HDB FOR A PERIOD OF 2 YEARS (YEAR 2026 TO 2028) | 2025-12-31 | S$2.78 |
| LCS PTE. LTD. | Supply Of Ordinary Portland Cement To The HDB (Batch 59) | 2025-12-30 | S$73 |
| SATIATE CONSTRUCTION (S) PTE. LTD. Not yet published | Demolition Works to HDB Quick Built Dorms at 5A, 7A, 11A Choa Chu Kang Grove and 10A Eunos Road 1 | 2025-12-30 | S$1,783,519 |
| THONG HUAT BROTHERS (PTE) LIMITED | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 3 PROJECT 3 (EAST ZONE) | 2025-12-26 | S$25,800,000 |
| BENG HENG ENGINEERING PTE LTD | DEMOLITION WORKS FOR PROJECT A (BATCH 31) | 2025-12-26 | S$2,399,000 |
| XING YUAN CIVIL ENGINEERING & BUILDING PTE. LTD. | Trunk Sewer at Lorong 1 Toa Payoh | 2025-12-26 | S$2,680,000 |
| SPECIALIST ELECTRIC PTE LTD | Mechanical and Electrical Cyclical Improvement Works to Multi-Storey Car Parks (Batch 36) | 2025-12-23 | S$3,658,000 |
| SETSCO SERVICES PTE LTD | Term Contract for the Provision of Testing Services for Semi- Destructive and Non-Destructive Tests on HDB Buildings (Batch 18) | 2025-12-22 | S$140.9 |
| LIBRARY & ARCHIVES SOLUTIONS PTE. LTD. | PROVISION OF CONSULTANCY SERVICES FOR FILE PLAN REVIEW FOR THE HOUSING & DEVELOPMENT BOARD | 2025-12-22 | S$456,500 |
| WTS ENGINEERING (M&E) PTE. LTD. Not yet published | Mechanical and Electrical Cyclical Improvement Works to Multi-Storey Car Parks (Batch 31). | 2025-12-22 | S$6,560,000 |
| LCE ENGINEERING PTE LTD | IMPROVEMENT WORKS TO MECHANICAL AND ELECTRICAL SYSTEMS AT HDB MANAGED PROPERTIES | 2025-12-19 | S$4,364,189 |
| SAMWOH RESOURCES PTE LTD | Supply of 20mm Aggregate To The HDB (Batch 96) | 2025-12-17 | S$22.9 |
| BM BUILDING PTE LTD | PROVISION OF SERVICES TO CARRY OUT PERIODIC FACADE INSPECTION FOR HDB MULTI-STOREY CAR PARKS (BATCH 4) AND (BATCH 5) | 2025-12-16 | S$3,050 |
| AIK SAN CONSTRUCTION PTE LTD | PROVISION OF MANAGEMENT AND MAINTENANCE SERVICES FOR STOREY SHELTERS (YEAR 2026 TO 2029) | 2025-12-11 | S$4,718 |
| TTS GROUP PTE. LTD. Not yet published | PROVISION OF TRANSPORT IMPACT ASSESSMENT CONSULTANCY SERVICES AT QUEENSTOWN AREA | 2025-12-11 | S$54,650 |
| HO CHOON TRANSPORT & CONSTRUCTION PTE LTD | Proposed Demolition, Earthworks & Drain Construction at St Wilfred Road | 2025-12-05 | S$2,175,000 |
| MEIZHUAN BUILDERS PTE LTD | Construction of Sewer at Queensway Estate (Part 2) | 2025-12-02 | S$5,479,500 |
| PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | Site Clearance and Earthworks (PT 1) at Woodlands N1 | 2025-11-28 | S$8,667,000 |
| NEWCON BUILDERS PTE. LTD. | PART A : BUILDING WORKS AT PROJECT DN (TOTAL: 1,052 DWELLING UNITS); PART B : CONTINGENCY WORKS | 2025-11-28 | S$265,380,000 |
| VICO CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT PROJECT CR (TOTAL: 588 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-11-28 | S$146,700,000 |
| RECLAIMS ENTERPRISE PTE. LTD. | Demolition Works for Project D (Batch 29) | 2025-11-28 | S$1,172,000 |
| ANG TONG SENG BROTHERS ENTERPRISES PTE LTD | (A) Road Improvement Works at Woodgrove Avenue and Construction of New Cul-De-Sac Road; (B) Construction of Bus Shelters along Woodgrove Avenue; (C) Construction of Trunk Sewer at Woodgrove Avenue | 2025-11-24 | S$10,698,000 |
| GLOBALPOINT FAR EAST PTE. LTD. | ADDITION & ALTERATION WORKS TO GREENRIDGE SHOPPING CENTRE | 2025-11-24 | S$8,500,000 |
| RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | Instrumentation Monitoring Services for (A) Realignment of Drain in Tengah Town, (B) Construction of Road and Drain at Plantation Walk, (C) Construction of Trunk Sewer at Plantation Walk, (D) Site Preparation Works at Tengah Town (Phase 6), (E) Construction of Outlet Drains at Tengah Town (Phase 3) | 2025-11-17 | S$24,057 |
| ORIENT NATURAL RESOURCES PTE. LTD. | Supply of Fine Aggregates to the HDB (Batch 86) | 2025-11-17 | S$25.8 |
| ENVAC SINGAPORE PTE. LTD. | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT PROJECT FB & FA | 2025-11-14 | S$5,266,000 |
| PV VACUUM ENGINEERING PTE LTD | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT PROJECT EG & EH | 2025-11-14 | S$4,781,913 |
| GEOAPPLICATION ENGINEERS PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS FOR MAJOR INFRASTRUCTURE WORKS AT SEMBAWANG (CONTRACT 1) | 2025-11-14 | S$37,953 |
| STREAM ENVIRONMENT (S) PTE. LTD. | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM(PWCS) AT PROJECT EW & FM | 2025-11-14 | S$4,648,000 |
| CABLES & UTILITIES DETECTION SERVICES PTE LTD | PROVISION OF SERVICES FOR THE DETECTION OF UNDERGROUND SERVICES FOR THE PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT DT | 2025-11-13 | S$15,600 |
| CPG FACILITIES MANAGEMENT PTE LTD | PROVISION OF INTEGRATED FACILITIES MANAGEMENT SERVICES TO COMMERCIAL PROPERTIES (SECTOR 3) | 2025-11-11 | S$1,218,989 |
| HD CONTRACTOR PTE. LTD. | ADDITIONS AND ALTERATIONS TO LIFT LOBBIES AND COLLABORATION SPACES AT HDB HUB | 2025-11-07 | S$4,295,450 |
| CTM FACILITIES MANAGEMENT PTE. LTD. | PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS WITHIN HDB FLATS FOR A PERIOD OF THREE YEARS (NORTH ZONE) | 2025-11-06 | S$669,589 |
| KIM YEW INTEGRATED PTE. LTD. | PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS WITHIN HDB FLATS FOR A PERIOD OF THREE YEARS (WEST ZONE) | 2025-11-06 | S$636,301 |
| KIM YEW INTEGRATED PTE. LTD. | PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS WITHIN HDB FLATS FOR A PERIOD OF THREE YEARS (CENTRAL ZONE) | 2025-11-06 | S$636,218 |
| DIGO CORPORATION PTE. LTD. | PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS WITHIN HDB FLATS FOR A PERIOD OF THREE YEARS (NORTH-EAST ZONE) | 2025-11-06 | S$689,697.8 |
| DIGO CORPORATION PTE. LTD. | PROVISION OF MANAGING AGENT SERVICES AND IMPROVEMENT WORKS WITHIN HDB FLATS FOR A PERIOD OF THREE YEARS (EAST ZONE) | 2025-11-06 | S$702,238.35 |
| NEW HORIZON DEVELOPMENT PTE LTD | IMPROVEMENT WORKS WITH ENHANCEMENT OF FIRE PROTECTION SYSTEM AT SEMBAWANG MART | 2025-11-04 | S$399,000 |
| BHCC CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT PROJECT FK (TOTAL: 1,358 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-10-31 | S$340,988,000 |
| SPECIALIST ELECTRIC PTE LTD | Mechanical And Electrical Cyclical Improvement Works To Multi-Storey Car Parks (Batch 35) | 2025-10-31 | S$3,568,000 |
| HEXACON CONSTRUCTION PTE LTD | PART A: BUILDING WORKS AT PROJECT DM (TOTAL: 1,021 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-10-31 | S$231,800,000 |
| AVENUE ENGINEERING PTE. LTD. | (A) REALIGNMENT OF DRAIN IN TENGAH TOWN; (B) CONSTRUCTION OF ROAD AND DRAIN AT PLANTATION WALK; (C) CONSTRUCTION OF TRUNK SEWER AT PLANTATION WALK; (D) SITE PREPARATION WORKS AT TENGAH TOWN (PHASE 6); (E) CONSTRUCTION OF OUTLET DRAINS AT TENGAH TOWN (PHASE 3) | 2025-10-31 | S$17,600,000 |
| VICO CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT PROJECT CH (TOTAL: 1,421 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-10-31 | S$303,270,000 |
| HL BUILDING MATERIALS PTE. LTD. | Supply of 20MM Aggregate to the HDB (Batch 95) | 2025-10-30 | S$23.75 |
| ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS INCLUDING AUTOMATED TUNNEL MONITORING SYSTEM FOR PROJECT GB | 2025-10-30 | S$335,063.3 |
| LCS PTE. LTD. | Supply Of Ordinary Portland Cement To The HDB (Batch 58) | 2025-10-24 | S$69.69 |
| CHUAN LIM CONSTRUCTION PTE LTD | Proposed Site Preparation Works in the Central Region | 2025-10-24 | S$36,200,000 |
| FIBRWRAP CONSTRUCTION PTE. LTD. | Improvement Works To Columns At Pre And Post War Flats Using Fibre Reinforce Polymer | 2025-10-23 | S$51 |
| LGA TELECOM PTE LTD | PROVISION OF INTERNET ACCESS CONNECTIONS AND SERVICES | 2025-10-21 | S$7,840 |
| CHYE JOO CONSTRUCTION PTE LTD | Major infrastructure works at Sembawang (Contract 1) | 2025-10-17 | S$114,607,663 |
| CROWN ASSOCIATES PRIVATE LIMITED | PROVISION OF RESIDENT ENGINEER TO SUPERVISE ADDITION & ALTERATION WORKS AT GEK POH SHOPPING CENTRE | 2025-10-16 | S$4,000 |
| CROWN ASSOCIATES PRIVATE LIMITED | PROVISION OF RESIDENT TECHNICAL OFFICER TO SUPERVISE ADDITION & ALTERATION WORKS AT GEK POH SHOPPING CENTRE | 2025-10-16 | S$3,500 |
| 800 SUPER WASTE MANAGEMENT PTE LTD | PROVISION, OPERATION AND MAINTENANCE OF ON-SITE FOOD WASTE TREATMENT SYSTEM FOR HDB COMMERCIAL COMPLEXES FOR A PERIOD OF THREE (3) YEARS | 2025-10-09 | S$113,800 |
| ENG XIAN CONSTRUCTION PTE LTD | (A) Repair and Reconstruction Works along Yishun Avenue 8; (B) Water Mains Diversion along Sembawang Road & Infrastructure Works along Yishun Avenue 8 | 2025-10-06 | S$3,464,850 |
| WIZVISION PTE. LTD. | TERM CONTRACT FOR DESIGN, PREPARATION AND PACKAGING OF CONTENT FOR USE IN WEBSITES | 2025-10-03 | S$1,950 |
| RIGHT CONSTRUCTION PTE LTD | IMPROVEMENT WORKS TO SURFACE CAR PARKS (BATCH 83) | 2025-09-30 | S$21,368,000 |
| CHIP ENG SENG CONTRACTORS (1988) PTE LTD | Part A: Building Works at Project CX (Total 551 Dwelling Units) and Project CY (Total 809 Dwelling Units); Part B: Contingency Works | 2025-09-30 | S$328,368,000 |
| SANCHOON BUILDERS PTE LTD | Part A: Building Works at Project CQ (Total 925 Dwelling Units); Part B: Contingency Works. | 2025-09-30 | S$202,168,000 |
| DEBENHO PTE LTD | PART A: BUILDING WORKS AT PROJECT CS (TOTAL 775 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-09-30 | S$183,000,000 |
| EXPAND CONSTRUCTION PTE LTD | PART A: BUILDING WORKS AT PROJECT CL & PARK (TOTAL: 777 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-09-30 | S$216,000,000 |
| RICH CONSTRUCTION COMPANY PTE. LTD. | PART A: BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 9 CONTRACT 9 (TOTAL 835 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-09-30 | S$222,800,000 |
| QINGJIAN INTERNATIONAL (SOUTH PACIFIC) GROUP DEVELOPMENT CO., PTE. LTD. | PART A: BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 9 CONTRACT 10 (TOTAL 862 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-09-30 | S$225,600,000 |
| FONG CONSULT PTE. LTD. Not yet published | ACCREDITED CHECKING SERVICES FOR COASTAL WORKS AT PROPOSED DEVELOPMENT | 2025-09-29 | S$710,000 |
| MOODY'S INVESTORS SERVICE SINGAPORE PTE. LTD. Not yet published | Appointment of Credit Rating Agency for Provision of Credit Rating Services | 2025-09-26 | S$197,280.06 |
| ST ENGINEERING SYNTHESIS PTE. LTD. | Provision of Managing Agent Services and Maintenance Works for a Period of Three Years (North Zone) | 2025-09-22 | S$129,479 |
| CTM FACILITIES MANAGEMENT PTE. LTD. | Provision of Managing Agent Services and Maintenance Works for a Period of Three Years (East Zone) | 2025-09-22 | S$130,519 |
| SAVILLS PROPERTY MANAGEMENT PTE. LTD. | Provision of Managing Agent Services and Maintenance Works for a Period of Three Years (North-East Zone) | 2025-09-22 | S$171,604 |
| KNIGHT FRANK PROPERTY & FACILITIES MANAGEMENT PTE. LTD. | Provision of Managing Agent Services and Maintenance Works for a Period of Three Years (West Zone) | 2025-09-22 | S$139,799 |
| DIGO CORPORATION PTE. LTD. | Provision of Managing Agent Services and Maintenance Works for a Period of Three Years (Central Zone - 2) | 2025-09-22 | S$177,800 |
| CHIONG CONSTRUCTION PTE. LTD. | Provision of Managing Agent Services and Maintenance Works for a Period of Three Years (Central Zone - 1) | 2025-09-22 | S$140,800 |
| TONG SHING CONTRACTORS PRIVATE LIMITED | Major Infrastructure at Redhill Close and Jalan Bukit Merah | 2025-09-19 | S$21,866,488 |
| ECAS CONSULTANTS PTE. LTD. | ACCREDITED CHECKER ORGANISATION (ACO) SERVICES FOR MAJOR INFRASTRUCTURE WORKS AT SEMBAWANG NEIGHBOURHOOD 4 (CONTRACT 1) | 2025-09-19 | S$85,000 |
| LINCOTRADE & ASSOCIATES PTE LTD | IMPROVEMENT WORKS TO BASEMENT ROOMS AT HDB HUB | 2025-09-16 | S$5,788,888 |
| NCS PTE. LTD. | RENEWAL AND PURCHASE OF NEW TRICENTIS TOSCA SOFTWARE LICENSES | 2025-09-15 | S$112,458.2 |
| GEOREALTIME PTE. LTD. Not yet published | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT FF | 2025-09-15 | S$449,800 |
| RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT DM AND PROJECT DN | 2025-09-11 | S$146,010.5 |
| CTM LANDSCAPE PTE. LTD. Not yet published | MAINTENANCE AND ENHANCEMENTS TO EXISTING GREEN ROOFS (Batch 3) | 2025-09-10 | S$4,419 |
| EXCEL MARINE & ENGINEERING PTE. LTD. | Repair Services including the Replacement of Parts to the Overhead and Gantry Cranes and Production Equipment at HDB Centre of Building Research | 2025-09-05 | S$144,435 |
| HENG SHENG CONSTRUCTION & ENGINEERING PTE. LTD. Not yet published | Construction of Trunk Sewer Along Jalan Tenteram & Jalan Bahagia | 2025-09-05 | S$2,450,000 |
| TOPPAN NEXT TECH PTE. LTD. | PROVISION OF PRINTING, MAILING AND RELATED WORKS (C2/FY25) | 2025-09-04 | S$5,078.1 |
| DATAPOST PTE LTD | PROVISION OF PRINTING, MAILING AND RELATED WORKS (C1/FY25) | 2025-09-04 | S$8,361.37 |
| AMNET TECHNOLOGY PTE LTD | Renewal Of Software License And Maintenance Of Firewall Policy Management System (FPMS) | 2025-09-03 | S$123,500 |
| PROGRESSIVE BUILDERS PRIVATE LIMITED | PART A: BUILDING WORKS AT PROJECT EP (TOTAL: 638 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-08-29 | S$187,450,000 |
| PICO ART INTERNATIONAL PTE. LTD. | MAINTENANCE OF EXHIBITION SPACE AT MYNICEHOME GALLERY | 2025-08-26 | S$5,734.5 |
| KTC CIVIL ENGINEERING & CONSTRUCTION PTE LTD | (A) CONSTRUCTION OF ROADS AND ROADSIDE DRAINS WITHIN TENGAH TOWN (PHASE 5A); (B) CONSTRUCTION OF TRUNK SEWERS AT TENGAH TOWN (PHASE 5A); (C) CONSTRUCTION OF UTILITIES SERVICES DUCT AT TENGAH TOWN (PHASE 5A) | 2025-08-25 | S$29,000,000 |
| HONG YING CONSTRUCTION AND ENGINEERING PTE. LTD. Not yet published | TERM CONTRACT FOR FABRICATION, SUPPLY, DELIVERY AND INSTALLATION OF POWDER COATED ALUMINIUM FIXED PANELS (BATCH 10) | 2025-08-15 | S$1,840 |
| TRINAX PRIVATE LIMITED Not yet published | Maintenance of HDB LIVINGSPACE Gallery | 2025-08-13 | S$7,000 |
| GLOBALPOINT FAR EAST PTE. LTD. | Additions and Alteration Works at Yew Tee Square | 2025-08-11 | S$7,335,000 |
| BUREAU VERITAS BUILDINGS & INFRASTRUCTURE PTE. LTD. | Periodic Structural Inspection and Related Works at Various HDB Estates (Batch 40-2025/26/27) | 2025-08-11 | S$2,672 |
| JIB SPECIALIST CONSULTANTS PTE. LTD. Not yet published | Periodic Structural Inspection and related Works at various HDB Estates (Batch 42-2025/26/27) | 2025-08-11 | S$2,330 |
| JIB SPECIALIST CONSULTANTS PTE. LTD. Not yet published | Periodic Structural Inspection and related works at various HDB Estates (Batch 41-2025/26/27) | 2025-08-11 | S$2,440 |
| HL BUILDING MATERIALS PTE. LTD. | Supply of 20MM Aggregate to the HDB (Batch 94) | 2025-08-08 | S$23.98 |
| SING HENG HOE CONSTRUCTION (1988) PTE LTD | Infrastructure Works at Alexandra Road | 2025-08-08 | S$5,105,455 |
| OCTA METIER PTE. LTD. Not yet published | PROVISION OF SITE SUPERVISION SERVICES FOR SPRUCING WORKS | 2025-08-08 | S$8,800 |
| YOUNG GENERATION PTE. LTD. Not yet published | PRODUCTION, SUPPLY AND DELIVERY OF WELCOME KITS | 2025-08-07 | S$2.57 |
| ORIENT NATURAL RESOURCES PTE. LTD. | Supply of Fine Aggregates to the HDB (Batch 85) | 2025-08-01 | S$25 |
| SCB BUILDING CONSTRUCTION PTE. LTD. | PART A : BUILDING WORKS AT PROJECT FG (TOTAL: 284 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-07-31 | S$82,380,000 |
| RICH CONSTRUCTION COMPANY PTE. LTD. | Project 1 - Part A: Building Works at Ang Mo Kio Neighbourhood 7 Contract 41A (Total: 422 Dwelling Units) Part B: Contingency Works; Project 2 - Construction of High Linkways from Marsiling Grove to Low Linkway Across Woodlands Street 13. | 2025-07-31 | S$126,220,000 |
| NCS PTE. LTD. | SUPPLY AND DELIVERY OF SERVER NETWORK SWITCHES | 2025-07-30 | S$374,710 |
| ENG HUP ENGINEERING PTE LTD | TERM CONTRACT FOR MAINTENANCE OF SIGNALISED PEDESTRIAN CROSSINGS IN HDB ESTATES FOR A PERIOD OF 3 YEARS (2025 TO 2028) | 2025-07-30 | S$35,115 |
| SCB BUILDING CONSTRUCTION PTE. LTD. | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 2 PROJECT 2 (NORTH ZONE) | 2025-07-28 | S$36,880,000 |
| SCHINDLER LIFTS (SINGAPORE) PTE. LTD. | REPLACEMENT OF LIFTS AND ESCALATORS WITH 10 YEARS COMPREHENSIVE MAINTENANCE AT COMMERCIAL COMPLEXES (BATCH 1) | 2025-07-28 | S$1,039,645.77 |
| PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | (A) Site Clearance & Earthworks at Simei; (B) Construction of Roads at Simei | 2025-07-25 | S$10,060,000 |
| NKH CONSTRUCTION EQUIPMENT PTE. LTD. | DESIGN AND BUILD CONTRACT FOR MULTI-STOREY CAR PARKS (MSCP) ENHANCEMENT WORKS | 2025-07-25 | S$936,245 |
| GARDEN WORKS PTE. LTD. | PROVISION OF LANDSCAPING SERVICES ON TOPMOST PARKING DECKS OF EXISTING MULTI- STOREY CAR PARKS (MSCP) (BATCH 14) | 2025-07-21 | S$848,075 |
| CHIP ENG SENG CONTRACTORS (1988) PTE LTD | Part A: Building Works at Project BU (Total: 1,118 Dwelling Units); Part B: Contingency Works | 2025-07-10 | S$242,700,000 |
| SINGAPORE ENVIRONMENTAL CONSULTANCY AND SOLUTIONS PTE. LTD. | SPECIALIST CONSULTANCY SERVICES AT HDB DEVELOPMENT (NORTHERN) | 2025-07-10 | S$1,080,000 |
| ARA GLOBAL CONST PTE. LTD. | CONSTRUCTION OF BUS SHELTERS, ROAD RESERVE FACILITIES AND JUNCTION IMPROVEMENT AT YUAN CHING ROAD AND KANG CHING ROAD, JURONG TOWN | 2025-07-09 | S$1,633,239 |
| SURBANA JURONG CONSULTANTS PTE. LTD. | MULTI-DISCIPLINARY CONSULTANCY SERVICES (CIVIL & STRUCTURAL ENGINEERING AND QUANTITY SURVEYING) FOR PROPOSED DEVELOPMENT | 2025-07-04 | S$73,236,200 |
| GPS LANDS (SINGAPORE) PTE LTD | Supply, Delivery and Maintenance of Robotic Total Station and Terrestrial Laser Scanner with Processing Software | 2025-07-03 | S$287,092 |
| CHIU TENG CONSTRUCTION CO. PTE. LTD. | Part A: Building Works At Project FH And Park (Total: 380 Dwelling Units); Part B: Contingency Works | 2025-06-30 | S$137,680,000 |
| ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | Instrumentation and Monitoring Works for Proposed Public Housing Development at Project EP | 2025-06-26 | S$137,894 |
| BUREAU VERITAS BUILDINGS & INFRASTRUCTURE PTE. LTD. | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | 2025-06-20 | S$180 |
| ECAS CONSULTANTS PTE. LTD. | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | 2025-06-20 | S$180 |
| CPG CONSULTANTS PTE LTD | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | 2025-06-20 | S$180 |
| ENGINEERS 2002 PRIVATE LIMITED | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | 2025-06-20 | S$180 |
| CKMBT INTERNATIONAL PTE. LTD. | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | 2025-06-20 | S$180 |
| SINGAPORE ENVIRONMENTAL CONSULTANCY AND SOLUTIONS PTE. LTD. | SPECIALIST CONSULTANCY SERVICES FOR ENVIRONMENTAL MANAGEMENT AND MONITORING PLAN AT SEMBAWANG N4 PROJECT | 2025-06-20 | S$975,000 |
| KTP CONSULTANTS PTE LTD Not yet published | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | 2025-06-20 | S$180 |
| PH CONSULTING PTE. LTD. Not yet published | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | 2025-06-20 | S$180 |
| JIB SPECIALIST CONSULTANTS PTE. LTD. Not yet published | APPOINTMENT OF ACCREDITED CHECKING ORGANISATIONS TO THE HDB PANEL OF ACCREDITED CHECKING ORGANISATIONS (BATCH 4) | 2025-06-20 | S$180 |
| ENGRO CORPORATION LIMITED | Supply Of Ordinary Portland Cement To The HDB (Batch 57) | 2025-06-17 | S$70.8 |
| SING HENG HOE CONSTRUCTION (1988) PTE LTD | (A) Construction of Road Related Facilities (RRF) at Bukit Batok N4; (B) Construction of Trunk Sewers at Bukit Batok N4 | 2025-06-17 | S$5,936,000 |
| RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | SITE INVESTIGATION PHASE 1 FOR PROPOSED DEVELOPMENT | 2025-06-13 | S$2,600,989 |
| PRECAST CONCRETE PTE. LTD. | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to various HDB Building Sites (Batch 15) | 2025-06-13 | S$4,312.9 |
| SUNWAY CONCRETE PRODUCTS (S) PTE LTD | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 16) | 2025-06-13 | S$1,761.4 |
| INTEGRATED PRECAST SOLUTIONS PTE. LTD. | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 17) | 2025-06-13 | S$5,989 |
| GREYFORM PTE. LTD. Not yet published | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 18) | 2025-06-13 | S$4,579.1 |
| HEPTACON CONSTRUCTION PTE. LTD. | SPRUCING WORKS FOR HDB FLATS (CONTRACT 4) | 2025-06-06 | S$100,300 |
| PTC SYSTEM (S) PTE LTD | MAINTENANCE OF NETWORK RESOURCE MANAGEMENT SOLUTION FOR A PERIOD OF 5 YEARS | 2025-06-02 | S$78,428 |
| THONG HUAT BROTHERS (PTE) LIMITED | PART A: BUILDING WORKS AT PROJECT CE (TOTAL 609 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-05-30 | S$139,900,000 |
| KEN-PAL (S) PTE. LTD. | PART A: BUILDING WORKS AT PROJECT BT (TOTAL: 485 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-05-30 | S$145,330,000 |
| L.S. CONSTRUCTION PTE LTD | PROJECT 1: PART A: BUILDING WORKS AT PROJECT CJ (TOTAL: 643 DWELLING UNITS); PART B: CONTINGENCY WORKS. PROJECT 2: PART A: BUILDING WORKS AT KALLANG WHAMPOA CONTRACT 76 (TOTAL: 312 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-05-30 | S$268,000,000 |
| FONG YUE DEVELOPMENT PTE. LTD. | ADDITION & ALTERATION WORKS TO BLOCK 267, SERANGOON AVENUE 3 | 2025-05-28 | S$1,205,000 |
| DREW & NAPIER LLC Not yet published | APPOINTMENT OF PANEL LAW FIRMS | 2025-05-26 | S$13,604 |
| ADSAN LAW LLC Not yet published | APPOINTMENT OF PANEL LAW FIRMS | 2025-05-26 | S$7,200 |
| CENTRAL CHAMBERS LAW CORPORATION Not yet published | APPOINTMENT OF PANEL LAW FIRMS | 2025-05-26 | S$1,200 |
| AMICA LAW LLC Not yet published | APPOINTMENT OF PANEL LAW FIRMS | 2025-05-26 | S$3,300 |
| SINGAPORE ENGINEERING & CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT PROJECT ES (TOTAL: 569 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-05-23 | S$119,800,000 |
| BA CONTRACTS PTE LTD | Infrastructure Works at Ghim Moh Road | 2025-05-21 | S$681,963 |
| UNITED E & P PTE. LTD. | IMPLEMENTATION OF INFRASTRUCTURE AND ROAD RELATED FACILITIES AT BISHAN TOWN | 2025-05-19 | S$10,376,000 |
| BRC ASIA LIMITED | TERM CONTRACT FOR THE PRODUCTION, SUPPLY AND DELIVERY OF SPIRAL CONNECTOR SYSTEM (BATCH 2) | 2025-05-16 | S$1,129.1 |
| SAMWOH RESOURCES PTE LTD | Supply Of 20MM Aggregate to the HDB (Batch 93) | 2025-05-16 | S$24.46 |
| MASTER CONTRACT SERVICES PTE LTD | Project 1: Part A: Building Works at Geylang Contract 55 & Park (Total: 433 Dwelling Units); Part B: Contingency Works. Project 2: Part A: Building Works at Ang Mo Kio Neighbourhood 7 Contract 41A (Total: 422 Dwelling Units); Part B: Contingency Works | 2025-05-16 | S$107,300,000 |
| RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS FOR THE PROPOSED PUBLIC HOUSING AT PROJECT BL (TOTAL: 683 DWELLING UNITS) | 2025-05-16 | S$62,855 |
| PACIFIC CENTURY CONSULTING PTE LTD | PROVISION OF ONE-ON-ONE EXECUTIVE COACHING | 2025-05-15 | S$1,900 |
| HAO DA PTE LTD | Demolition Works for Project B (Batch 29) | 2025-05-13 | S$1,670,000 |
| CHC CONSTRUCTION PTE. LTD. | Project 1: Road Widening at Tanjong Rhu Road, Kampong Arang Road and Sampan Place. Project 2: Road Improvement Work at Bukit Merah View | 2025-05-09 | S$13,559,999.99 |
| HL BUILDING MATERIALS PTE. LTD. | Supply of 20MM Aggregate to the HDB (Batch 92) | 2025-05-05 | S$24.48 |
| LIM WEN HENG CONSTRUCTION PTE LTD | Project 1: Part A: Building Works At Jurong West Neighbourhood 1 Contract 34 (Total: 1,844 Dwelling Units); Part B: Contingency Works. Project 2: Infrastructure Works At Jurong West Neighbourhood 1 Contract 34 | 2025-05-05 | S$473,000,000 |
| NOVAARS INTERNATIONAL PTE. LTD. | PROVISION OF SERVICES TO CARRY OUT PERIODIC FACADE INSPECTION (PFI) AT VARIOUS HDB COMMERCIAL COMPLEXES FOR BATCH 1 AND BATCH 2 | 2025-05-05 | S$7,900 |
| TIMBERPARK PTE. LTD. Not yet published | ADDITION AND ALTERATION WORKS TO LOYANG POINT | 2025-05-05 | S$331,000 |
| GLOBALPOINT FAR EAST PTE. LTD. | ADDITION AND ALTERATION WORKS TO JOO CHIAT COMPLEX | 2025-05-02 | S$22,338,000 |
| WEE HUR CONSTRUCTION PTE LTD | PART A: BUILDING WORKS AT PROJECT ER (TOTAL: 862 DWELLING UNIT); PART B: CONTINGENCY WORKS | 2025-04-30 | S$203,000,000 |
| QINGJIAN ENGINEERING & CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 2 CONTRACT 19B (TOTAL: 818 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-04-30 | S$177,909,000 |
| FIBRWRAP CONSTRUCTION PTE. LTD. | Improvement Works To Void Deck Columns Of Residential Buildings Using Polymer Fibre Wrapping (Batch 15) | 2025-04-29 | S$57.5 |
| SIMPLUS PTE. LTD. Not yet published | FORMAL SAFETY ASSESSMENT STUDY FOR PROPOSED DEVELOPMENT | 2025-04-29 | S$179,000 |
| CHAN & CHAN ENGINEERING PTE. LTD. | MAJOR INFRASTRUCTURE WORKS AT ANG MO KIO NEIGHBOURHOOD 8 (CONTRACT 2) | 2025-04-25 | S$46,735,825 |
| MACBUILD CONSTRUCTION PTE. LTD. | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 66) | 2025-04-23 | S$9,568,222 |
| TKB C-E CONTRACTOR PTE. LTD. | (A) CONSTRUCTION OF YISHUN AVENUE 10, YISHUN STREET 53 & MILTONIA CLOSE EXTENSION; (B) CONSTRUCTION OF SEWER AT YISHUN NEIGHBOURHOOD 5 | 2025-04-21 | S$15,288,000 |
| NGAI CHIN CONSTRUCTION PTE LTD | ADDITION & ALTERATION WORKS TO OFFICES AT LEVEL 1, 4 AND 6 OF HDB HUB | 2025-04-17 | S$6,358,000 |
| WIDE WINGS PTE. LTD. Not yet published | Appointment of Site Supervisors for Improvement Works at Various HDB Residential Buildings | 2025-04-16 | S$8,318 |
| L.S. CONSTRUCTION PTE LTD | PART A: BUILDING WORKS AT PASIR RIS N5 C21, N5 C22 & LINEAR PARK (TOTAL: 767 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-04-15 | S$220,000,000 |
| ORIENT NATURAL RESOURCES PTE. LTD. | Supply of Fine Aggregates to the HDB (Batch 84) | 2025-04-15 | S$25 |
| PT-G BUILDERS PTE. LTD. | Addition & Alteration Works at Gek Poh Shopping Centre | 2025-04-14 | S$29,848,000 |
| SHINCON INDUSTRIAL PTE. LTD. | IMPROVEMENT WORKS TO SURFACE CAR PARKS (BATCH 86) | 2025-04-11 | S$14,100,000 |
| ONEBERRY TECHNOLOGIES PTE. LTD. | Provision of Services to Support Emergency Housing Operations | 2025-04-11 | S$4,126,200 |
| JIN CHOON CIVIL ENGINEERING PTE. LTD. | Infrastructure Works at Telok Blangah | 2025-04-11 | S$34,273,000 |
| LINKWISE TECHNOLOGY PTE. LTD. | Term Contract for the Provision of Robotics Service (Painting Robots) for Selected BTO Projects under HDB (Batch 2) | 2025-04-11 | S$125,260 |
| SETSCO SERVICES PTE LTD | TERM CONTRACT FOR PROVISION OF TESTING SERVICES FOR WINDSOR PROBE TEST, CORE TEST AND CONSTRUCTION MATERIALS TESTING (BATCH 9) | 2025-04-11 | S$299 |
| TRENDBUILD CONTRACTS PTE. LTD. | ADDITION AND ALTERATION WORKS TO TOILETS AT HDB COMMERCIAL COMPLEXES (BATCH 1) | 2025-04-11 | S$3,591,177 |
| CHC CONSTRUCTION PTE. LTD. | PROPOSED INFRASTRUCTURE WORKS AT JURONG EAST CENTRAL AND JURONG WEST STREET 93 (A) CONSTRUCTION OF TRUNK SEWER AT JURONG EAST CENTRAL; (B) ROAD WIDENING AND JUNCTION IMPROVEMENT WORKS AT JURONG WEST STREET 93 | 2025-04-10 | S$6,180,000 |
| ANNESING PTE. LTD. Not yet published | PRODUCTION AND MAINTENANCE / MODIFICATION OF ARCHITECTURAL MODELS FOR TWO HDB ESTATES (A AND B) | 2025-04-10 | S$174,800 |
| MS PROJECTS PTE. LTD. Not yet published | RENOVATION WORKS TO EXISTING SHOP WITH UPPER DWELLING UNIT INTO SELF-SERVICE LOBBY (E-LOBBY) WITH INTERVIEW ROOMS AND WAITING AREA | 2025-04-10 | S$152,760 |
| APS ASIA PDA ENTERPRISE PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT BT | 2025-04-09 | S$86,657 |
| LCS PTE. LTD. | Supply Of Ordinary Portland Cement To The HDB (Batch 56) | 2025-04-07 | S$70.89 |
| ABL CONSULTANTS PTE. LTD. Not yet published | MULTI-DISCIPLINARY (CIVIL & STRUCTURAL ENGINEERING AND QUANTITY SURVEYING) CONSULTANCY SERVICES FOR DEMOLITION PROJECTS FOR A PERIOD OF 1.5 YEARS (SPC(DEMO) 1) TENDER EXERCISE BATCH 4 (2 PROJECTS) | 2025-04-07 | S$286,000 |
| WEE HUR CONSTRUCTION PTE LTD | PART A : BUILDING WORKS AT PROJECT BJ (TOTAL: 1,039 DWELLING UNITS); PART B : CONTINGENCY WORKS | 2025-03-28 | S$236,398,000 |
| LOGICALIS SINGAPORE PTE. LTD. | SUPPLY OF VIRTUAL DESKTOP INFRASTRUCTURE (VDI) WARRANTY AND MAINTENANCE RENEWAL | 2025-03-28 | S$739,115 |
| GROUND INSTRUMENTATION & ENGINEERING PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS FOR THE PROPOSED PUBLIC HOUSING AT PROJECT FD (TOTAL: 1,039 DWELLING UNITS) | 2025-03-28 | S$78,590 |
| IMPERIUM SOLUTIONS PTE. LTD. | SUPPLY OF A UNIFIED PLATFORM FOR OBSERVABILITY & SECURITY ANALYTICS AND SERVICES | 2025-03-27 | S$2,901,379.47 |
| TKB C-E CONTRACTOR PTE. LTD. | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 67) | 2025-03-26 | S$7,390,000 |
| G STAR ENGINEERING PTE. LTD. | Replacement of Air Conditioning & Mechanical Ventilation System at Various HDB Branches - Sector 2 | 2025-03-26 | S$3,092,220 |
| CYCLECT FACILITIES MANAGEMENT PTE. LTD. | PROVISION OF MANAGING AGENT AND COMPREHENSIVE MAINTENANCE OF THE HDB MECHANISED PARKING SYSTEM (MPS) AND BUILDING FACILITIES | 2025-03-25 | S$3,800,290 |
| E3 CONSTRUCTION PTE LTD | REPAIR & REDECORATION (R&R) WORKS TO HDB COMMERCIAL COMPLEXES (BATCH 1) | 2025-03-24 | S$6,483,000 |
| GROUND INSTRUMENTATION & ENGINEERING PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT ER | 2025-03-24 | S$79,701 |
| INNOCOM TECHNOLOGIES PTE LTD | Supply of Autodesk Software | 2025-03-24 | S$177,590 |
| SETSCO SERVICES PTE LTD | Term Contract for the Provision of Testing Services for Semi- Destructive and Non-Destructive Tests on HDB Buildings (Batch 16) | 2025-03-21 | S$150 |
| WIDE WINGS PTE. LTD. Not yet published | PROVISION OF RESIDENT TECHNICAL OFFICERS TO SUPERVISE ADDITION & ALTERATION PROJECTS AT HDB PROPERTIES | 2025-03-21 | S$3,799 |
| COSBY PTE. LTD. | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 3 PROJECT 4 (CENTRAL ZONE) | 2025-03-18 | S$27,729,900 |
| BENTLEY SYSTEMS SINGAPORE PTE LTD | Supply, Delivery And Maintenance Of Bentley Map Software For 36 Months | 2025-03-17 | S$10,086.72 |
| WFY CIVIL ENGINEERING PTE. LTD. | SITE CLEARANCE AND EARTHWORKS AT GEYLANG - PHASE 2 | 2025-03-17 | S$7,369,000 |
| JUPITER BUILDER PTE. LTD. | MAJOR INFRASTRUCTURE WORKS AT BAYSHORE (PHASE 1B) | 2025-03-14 | S$26,600,000 |
| SH INTEGRATED SERVICES PTE. LTD. | Term Contract for Maintenance of Mechanical and Electrical Systems at HDB Commercial Complexes, Branch Offices and Carparks Adjoining Commercial Complexes (Zone 2) | 2025-03-13 | S$254,617 |
| MKV ENGINEERING AND TRADING SERVICES PTE. LTD. | Term Contract for Maintenance of Mechanical and Electrical Systems at HDB Commercial Complexes, Branch Offices and Carparks Adjoining Commercial Complexes (Zone 1) | 2025-03-13 | S$444,905 |
| HAO DA PTE LTD | Demolition Works for Project C (Batch 29) | 2025-03-12 | S$1,078,965 |
| SINGAPORE TELECOMMUNICATIONS LIMITED | Supply and Delivery of Tablet Computers and Data Plan Subscription | 2025-03-12 | S$22.81 |
| SANTARLI CONSTRUCTION PTE. LTD. | Coastal Development At Pulau Sudong | 2025-03-10 | S$180,800,000 |
| YONGSHENG E & C PTE. LTD. Not yet published | (A) DEMOLITION WORKS AT CENTRAL AREA; (B) EARTHWORKS AT CENTRAL AREA; (C) RETURFING AND MAINTENANCE WORKS AT TOA PAYOH WEST | 2025-03-07 | S$1,800,000 |
| HUNG YAO SHENG ENGINEERING PTE. LTD. | Proposed Removal of Existing Water Main, Sealing Up of Abandoned Sewer Line and Reinstatement Works at Project CQ | 2025-03-06 | S$120,188 |
| HI-TACT SOLUTIONS & TRADING PTE. LTD. | Tender For Salvaging / Storage / Maintenance Works at Project A | 2025-03-05 | S$229,000 |
| JIA YI CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT BM (TOTAL: 1,244 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-03-04 | S$235,800,000 |
| BETIME ENGINEERING PTE. LTD. Not yet published | INSTRUMENTATION AND MONITORING WORKS FOR THE PROPOSED PUBLIC HOUSING AT PROJECT BW (TOTAL: 1,138 DWELLING UNITS) | 2025-03-03 | S$89,340 |
| CHIP ENG SENG CONTRACTORS (1988) PTE LTD | PART A: BUILDING WORKS AT YISHUN NEIGHBOURHOOD 5 CONTRACT 9 & 10 (TOTAL: 1,334 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-02-28 | S$287,716,380 |
| DEBENHO PTE LTD | PART A: BUILDING WORKS AT YISHUN NEIGHBOURHOOD 5 CONTRACT 11 (TOTAL: 987 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-02-28 | S$248,000,000 |
| EXPAND CONSTRUCTION PTE LTD | PART A: BUILDING WORKS AT PROJECT BN (TOTAL: 848 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-02-28 | S$216,000,000 |
| RICH CONSTRUCTION COMPANY PTE. LTD. | PART A: BUILDING WORKS AT PROJECT CA (TOTAL: 750 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-02-28 | S$189,800,000 |
| CHIU TENG CONSTRUCTION CO. PTE. LTD. | PART A: BUILDING WORKS AT PROJECT BZ (TOTAL: 754 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-02-28 | S$174,330,000 |
| NEWCON BUILDERS PTE. LTD. | PROJECT 1: PART A: BUILDING WORKS AT PROJECT BW (TOTAL: 1,138 DWELLING UNITS); PART B: CONTINGENCY WORKS. PROJECT 2: ROAD IMPROVEMENT AND INFRASTRUCTURE WORKS AT PROJECT BW | 2025-02-28 | S$310,380,000 |
| JIA YI CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT PROJECT BL (TOTAL: 683 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-02-28 | S$173,700,000 |
| GUTHRIE ENGINEERING (S) PTE LTD | Operate and Manage HDB Car Parks (Batch 57) | 2025-02-26 | S$1,583,334 |
| ST ENGINEERING URBAN SOLUTIONS LTD. | Operate and Manage HDB Car Parks (Batch 53) | 2025-02-26 | S$2,364,847 |
| WILSON PARKING (SINGAPORE) PTE. LTD. | Operate and Manage HDB Car Parks (Batch 52) | 2025-02-26 | S$2,006,751 |
| WILSON PARKING (SINGAPORE) PTE. LTD. | Operate and Manage HDB Car Parks (Batch 59) | 2025-02-26 | S$58,750 |
| P-PARKING INTERNATIONAL PTE LTD | Operate and Manage HDB Car Parks (Batch 55) | 2025-02-26 | S$2,562,100 |
| CBM PARKING PTE. LTD. | Operate and Manage HDB Car Parks (Batch 54) | 2025-02-26 | S$2,316,840 |
| RE SUSTAINABILITY SOLUTIONS PTE. LTD. Not yet published | Operate and Manage HDB Car Parks (Batch 58) | 2025-02-26 | S$892,090 |
| RE SUSTAINABILITY SOLUTIONS PTE. LTD. Not yet published | Operate and Manage HDB Car Parks (Batch 56) | 2025-02-26 | S$1,393,800 |
| HAO DA PTE LTD | DEMOLITION PROJECT AT PUBLIC HOUSING ESTATE (BATCH 8) | 2025-02-24 | S$1,178,097 |
| SINGAPORE ENVIRONMENTAL CONSULTANCY AND SOLUTIONS PTE. LTD. | Specialist Consultancy Services at Central Area | 2025-02-21 | S$1,495,000 |
| ZHONG KAI CONSTRUCTION COMPANY PTE. LTD. | Construction and Demolition of Facilities at Mount Pleasant | 2025-02-18 | S$3,298,600 |
| H3 ZOOM PTE. LTD. Not yet published | Engagement of Drone Service Provider with Artificial Intelligence Technology to Carry Out Facade Audit Inspection on Residential Properties - Batch 1 | 2025-02-17 | S$2,715 |
| GEOSMART INTERNATIONAL PTE. LTD. | Independent Instrumentation Monitoring Services For Coastal Development At Pulau Sudong | 2025-02-11 | S$888,888 |
| RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS INCLUDING AUTOMATED TUNNEL MONITORING SYSTEM FOR THE PROPOSED PUBLIC HOUSING AT TAMPINES SIMEI CONTRACT 24 & PARK | 2025-02-07 | S$390,190 |
| CHEVALIER SINGAPORE HOLDINGS PTE. LTD. | THIRTY-SIXTH TERM CONTRACT FOR THE SUPPLY, DELIVERY, INSTALLATION AND MAINTENANCE OF LIFTS FOR THREE-YEAR PERIOD | 2025-02-06 | S$11,182,278 |
| SAMWOH RESOURCES PTE LTD | Supply of 20MM Aggregate to the HDB (Batch 91) | 2025-02-06 | S$23.36 |
| ELEMENT CONSTRUCTION TESTING (S) PTE. LTD. | Term Contract for the Provision of Testing Services for Semi- Destructive and Non-Destructive Tests on HDB Buildings (Batch 14) | 2025-02-06 | S$151 |
| ELEMENT CONSTRUCTION TESTING (S) PTE. LTD. | Term Contract for the Provision of Testing Services for Semi- Destructive and Non-Destructive Tests on HDB Buildings (Batch 15) | 2025-02-06 | S$158 |
| SCT CONSTRUCTION PTE. LTD. | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33D; (B) CONTINGENCY WORKS | 2025-01-31 | S$37,652,000 |
| THONG HUAT BROTHERS (PTE) LIMITED | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34H; (B) CONTINGENCY WORKS | 2025-01-31 | S$37,555,000 |
| THONG HUAT BROTHERS (PTE) LIMITED | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33B; (B) CONTINGENCY WORKS | 2025-01-31 | S$34,355,000 |
| KIENTA ENGINEERING CONSTRUCTION PTE. LTD. | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34A; (B) CONTINGENCY WORKS | 2025-01-31 | S$41,850,000 |
| WING TUCK ENGINEERING PTE LTD | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33E; (B) CONTINGENCY WORKS | 2025-01-31 | S$36,888,000 |
| CHIP ENG SENG CONTRACTORS (1988) PTE LTD | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33C; (B) CONTINGENCY WORKS | 2025-01-31 | S$36,755,000 |
| CHIP ENG SENG CONTRACTORS (1988) PTE LTD | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34B; (B) CONTINGENCY WORKS | 2025-01-31 | S$33,155,000 |
| KIAN HIAP CONSTRUCTION PTE LTD | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33A; (B) CONTINGENCY WORKS | 2025-01-31 | S$30,219,880.63 |
| KIAN HIAP CONSTRUCTION PTE LTD | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34G; (B) CONTINGENCY WORKS | 2025-01-31 | S$44,817,182.61 |
| SANCHOON BUILDERS PTE LTD | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34C; (B) CONTINGNECY WORKS | 2025-01-31 | S$37,000,000 |
| STAR PEST CONTROL PTE LTD | TERM CONTRACT FOR VECTOR CONTROL SERVICES TO HDB DEVELOPMENT SITES FOR A PERIOD OF TWENTY-FOUR MONTHS | 2025-01-31 | S$860 |
| SOON THONG CONSTRUCTION PTE. LTD. | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34E; (B) CONTINGENCY WORKS | 2025-01-31 | S$34,888,000 |
| HI-TEK CONSTRUCTION PTE. LTD. | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33G; (B) CONTINGENCY WORKS | 2025-01-31 | S$37,500,000 |
| HI-TEK CONSTRUCTION PTE. LTD. | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34F; (B) CONTINGENCY WORKS | 2025-01-31 | S$28,770,000 |
| CHIU TENG CONSTRUCTION CO. PTE. LTD. | PART A: BUILDING WORKS AT TAMPINES NEIGHBOURHOOD 9 CONTRACT 20 (TOTAL: 585 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-01-31 | S$135,510,000 |
| PAL-LINK CONSTRUCTION PTE. LTD. | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G34D; (B) CONTINGENCY WORKS | 2025-01-31 | S$39,900,000 |
| FUJIAN CHENGJIAN CONSTRUCTION CORPORATION LIMITED (Singapore Branch) | (A) DESIGN AND BUILD OF UPGRADING PROJECTS FOR G33H; (B) CONTINGENCY WORKS | 2025-01-31 | S$37,000,000 |
| STARHUB LTD. | PROVISION OF TELECOMMUNICATION LINE SERVICES FOR HOUSING MANAGEMENT GROUP FOR A PERIOD OF 3 YEARS | 2025-01-28 | S$237.14 |
| CPG FACILITIES MANAGEMENT PTE LTD | PROVISION OF 24 HOURS TELEPHONE ANSWERING SERVICE | 2025-01-24 | S$78,880 |
| A I ASSOCIATES PTE. LTD. | DESIGN, RENOVATION AND REINSTATEMENT WORKS TO VARIOUS OFFICE SPACES AT HDB HUB (WEST WING, LEVEL 21, 22, 23, EAST WING, LEVEL 23) | 2025-01-24 | S$2,533,741 |
| ORIENT NATURAL RESOURCES PTE. LTD. | Proposed Relocation Works at Designated Sites | 2025-01-24 | S$24,690,785.4 |
| XLPRIME ENGINEERING PTE. LTD. | ELECTRICAL UPGRADING WORKS AT BLOCK 51, OLD AIRPORT ROAD | 2025-01-20 | S$89,000 |
| NXGEN COMMUNICATIONS PTE LTD | UPGRADING AND MAINTENANCE OF TELEPHONY SYSTEM | 2025-01-16 | S$695,842 |
| LCS PTE. LTD. | Supply Of Ordinary Portland Cement To The HDB (Batch 55) | 2025-01-15 | S$70.89 |
| BENG HENG ENGINEERING PTE LTD | DEMOLITION WORKS FOR PROJECT B (BATCH 28) | 2025-01-15 | S$1,888,000 |
| GEOAPPLICATION ENGINEERS PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS FOR DRAINAGE RECONSTRUCTION WORKS ALONG NEW UPPER CHANGI ROAD | 2025-01-09 | S$71,668.8 |
| ORIENT NATURAL RESOURCES PTE. LTD. | Supply of Fine Aggregates to the HDB (Batch 83) | 2025-01-07 | S$25.67 |
| BHCC CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT PROJECT BG (TOTAL 1,015 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-01-06 | S$245,988,000 |
| EXPAND CONSTRUCTION PTE LTD | PART A: BUILDING WORKS AT KALLANG WHAMPOA CONTRACT 60 AND COMMON GREEN (TOTAL: 650 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-01-06 | S$171,000,000 |
| TRUST-BUILD ENGINEERING & CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT KALLANG WHAMPOA CONTRACT 69 (TOTAL: 271 DWELLING UNITS) ;PART B: CONTINGENCY WORKS | 2025-01-06 | S$79,560,000 |
| CTM FACILITIES MANAGEMENT PTE. LTD. | Part A: Appointment of Managing Agent to Manage HDB Construction Resources Services (No.7); Part B: Appointment of Managing Agent for Sand & Granite Storage Site (Batch 5); Part C: Contingency Works | 2025-01-03 | S$326,966.6 |
| KIMLY CONSTRUCTION PRIVATE LIMITED | PART A: BUILDING WORKS AT BEDOK KEMBANGAN CONTRACT 3, COMMUNITY CLUB & PARK (TOTAL: 348 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2025-01-03 | S$162,800,000 |
| SKK WORKS PTE. LTD. | DIVERSION OF WATER MAIN & DOUBLE PILLAR HYDRANT FOR BLOCK 427 & 431 HOUGANG AVENUE 6 SUBSTATIONS | 2025-01-03 | S$236,492.74 |
| WELLTECH CONSTRUCTION PTE LTD | PART A: BUILDING WORKS AT YISHUN NEIGHBOURHOOD 8 CONTRACT 16-17 AND PARK (TOTAL: 1,277 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-12-31 | S$332,600,000 |
| BHCC CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT KALLANG WHAMPOA CONTRACT 61 AND 62 (TOTAL: 1,413 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-12-30 | S$330,988,000 |
| R.A.K. MATERIALS CONSULTANTS PTE LTD | TERM CONTRACT FOR PROVISION OF SERVICES FOR LABORATORY TESTING, OPERATION AND MAINTENANCE AT HDB ENGINEERING MATERIALS LABORATORY (BATCH 8) | 2024-12-30 | S$27,180.43 |
| MEINHARDT (SINGAPORE) PTE LTD | ACCREDITED CHECKING SERVICES FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT PROJECT DM AND PROJECT DN | 2024-12-30 | S$599,620 |
| LHW CONSTRUCTION PTE. LTD. | Implementation of Cooling Intervention Trial and Measurement of Environmental Data | 2024-12-30 | S$2,257,122 |
| LEAP INTEGRATED PTE. LTD. | Mechanical and Electrical Cyclical Improvement Works to Multi-Storey Car Parks (Batch 28) | 2024-12-26 | S$6,447,799 |
| NEC ASIA PACIFIC PTE. LTD. | RENEWAL OF MAINTENANCE FOR FIREWALL FOR 1 YEAR AND PROVISION OF PROFESSIONAL SERVICES FOR FIREWALL HARDWARE MIGRATION | 2024-12-24 | S$76,340 |
| GYLET LIFT (M&S) PRIVATE LIMITED | MODERNISATION OF ESCALATORS AND SIX (6) YEARS COMPREHENSIVE MAINTENANCE WORKS AT NEW BRIDGE CENTRE | 2024-12-19 | S$388,100 |
| AIK SAN CONSTRUCTION PTE LTD | Provision of Managing Agent Services and Improvement Works within HDB Flats (North Zone) | 2024-12-16 | S$73,694 |
| KOYO ENGINEERING (S.E. ASIA) PTE. LTD. | TERM CONTRACT FOR MAINTENANCE OF FIRE PROTECTION, MECHANICAL AND ELECTRICAL SYSTEMS AT HDB MANAGED PROPERTIES FOR A PERIOD OF SIXTY (60) MONTHS | 2024-12-11 | S$512,030 |
| BENG HENG ENGINEERING PTE LTD | Demolition Works for Project A (Batch 29) | 2024-12-06 | S$1,780,000 |
| NCS PTE. LTD. | MAINTENANCE OF NETWORK EQUIPMENT FOR TWO (2) YEARS | 2024-12-04 | S$9,626 |
| ENGRO CORPORATION LIMITED | Supply Of Ordinary Portland Cement to the HDB (Batch 54) | 2024-11-29 | S$72.1 |
| KJS CONSTRUCTION PTE LTD | ADDITION AND ALTERATION WORKS TO WEST WING, LEVEL 29 AT HDB HUB | 2024-11-29 | S$1,135,000 |
| L.S. CONSTRUCTION PTE LTD | PROJECT 1: PART A: BUILDING WORKS AT BEDOK NEIGHBOURHOOD 8 CONTRACT 14 (TOTAL: 1,234 DWELLING UNITS); PART B: CONTINGENCY WORKS. PROJECT 2: PART A: BUILDING WORKS AT PROJECT ED (TOTAL: 292 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-11-29 | S$368,000,000 |
| SQUARE FRESCO PTE. LTD. | Replacement of Air Conditioning & Mechanical Ventilation System at Various HDB Branches - Sector 1 | 2024-11-29 | S$4,447,099 |
| AIK SAN CONSTRUCTION PTE LTD | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 63) | 2024-11-28 | S$8,360,200 |
| WSH EXPERTS PTE. LTD. Not yet published | Term Contract of Building Inspector Services for Building Works | 2024-11-25 | S$55 |
| ST ENGINEERING URBAN SOLUTIONS LTD. | THE DEVELOPMENT OF STRUCTURAL HEALTH MONITORING SYSTEM (SHM) | 2024-11-22 | S$11,230,000 |
| HO CHOON TRANSPORT & CONSTRUCTION PTE LTD | SEWER DIVERSION FOR CHINESE TEMPLE AND PARTIAL ROAD EXPUNCTION AT REDHILL CLOSE REQUIRED FOR LAND PREPARATION OF REDHILL CLOSE | 2024-11-22 | S$1,300,000 |
| ELEMENT CONSTRUCTION TESTING (S) PTE. LTD. | Structural Inspection at MND Complex | 2024-11-22 | S$86,290 |
| G STAR ENGINEERING PTE. LTD. | IMPROVEMENT WORKS TO CEILING LIGHTS AT HDB HUB | 2024-11-19 | S$498,000 |
| CISEERN BY DESIGNER FURNISHINGS PTE. LTD. | INTERIOR DESIGN, DECORATION AND MAINTENANCE OF SHOWFLATS (SET A & SET B) | 2024-11-18 | S$0.02 |
| MACTECH ENGINEERING & TRADING PTE. LIMITED | Additions And Alterations Works To Multi-Storey Car Park PM28 (Block 586A, Pasir Ris Street 53) | 2024-11-14 | S$800,020 |
| ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED PUBLIC HOUSING DEVELOPMENT AT HOUGANG NEIGHBOURHOOD 1 CONTRACT 13A AT HOUGANG STREET 13 | 2024-11-13 | S$83,277 |
| WFY CIVIL ENGINEERING PTE. LTD. | Construction of Road at Queen's Crescent (Part) | 2024-11-13 | S$7,980,000 |
| WTS ENGINEERING (M&E) PTE. LTD. Not yet published | Mechanical And Electrical Cyclical Improvement Works To Multi-Storey Car Parks (Batch 30) | 2024-11-12 | S$5,560,200 |
| JUPITER BUILDER PTE. LTD. | BALANCE OF WORKS FOR: (A) ROAD AND DRAIN IMPROVEMENT WORKS AT YISHUN AVE 6 (PART 2); (B) CONSTRUCTION OF SIGNALISED PEDESTRIAN CROSSINGS AT YISHUN AVE 6; (C) CONSTRUCTION OF BUS BAY AND BUS SHELTER AT YISHUN AVE 6; (D) CONSTRUCTION OF BUS SHELTERS AT YISHUN AVE 1 & YISHUN ST 42; (E) CONSTRUCTION OF BUS SHELTERS AT CANBERRA WALK | 2024-11-06 | S$1,426,000 |
| ENKON INTERNATIONAL CONSULTING ENGINEERS PTE LTD | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | 2024-11-01 | S$11,260 |
| BMS ENGINEERS PTE LTD | APPOINTMENT OF REGISTERED INSPECTORS (M&E) TO THE HDB PANEL OF REGISTERED INSPECTORS (BATCH 7) | 2024-11-01 | S$11,260 |
| M1 NET LTD. | DESIGN, SUPPLY, OPERATION, SUPPORT AND MAINTENANCE OF ENHANCED CONSUMER CONTROL UNIT (CCU) ADAPTERS AND SMART HOME SOLUTIONS FOR HDB HOMES | 2024-10-29 | S$2,871,000 |
| ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS INCLUDING AUTOMATED TUNNEL MONITORING SYSTEM FOR THE PROPOSED PUBLIC HOUSING AT PROJECT BZ AND PROJECT CA | 2024-10-28 | S$480,539.2 |
| LOGICALIS SINGAPORE PTE. LTD. | Renewal of Citrix Licenses | 2024-10-28 | S$1,721 |
| PLANTWERKZ PTE. LTD. | Term Contract for Fabrication and Supply of the Prefabricated Extensive Green (PEG) Roof Tray System and its Extension Panels and Sole Distributorship for HDB and Non-HDB Projects | 2024-10-28 | S$45,101.11 |
| CHIONG CONSTRUCTION PTE. LTD. | IMPROVEMENT WORKS TO HDB HUB | 2024-10-24 | S$4,868,000 |
| PV VACUUM ENGINEERING PTE LTD | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT PROJECT CM, CN & DB | 2024-10-23 | S$6,515,632 |
| GREENWAVE SOLUTIONS PTE. LTD. | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT PROJECT CL, CZ & DA | 2024-10-23 | S$7,588,800 |
| PICO ART INTERNATIONAL PTE. LTD. | RENOVATION WORKS TO MY NICE HOME GALLERY | 2024-10-21 | S$1,098,116 |
| LCS PTE. LTD. | Supply Of Ordinary Portland Cement To The HDB (Batch 53) | 2024-10-15 | S$73.8 |
| HL BUILDING MATERIALS PTE. LTD. | Supply of 20MM Aggregate to the HDB (Batch 90) | 2024-10-15 | S$24.28 |
| STARLAND CONSTRUCTION PTE LTD | ROAD WIDENING AND JUNCTION IMPROVEMENT AT KING GEORGE'S AVENUE AND SYED ALWI ROAD | 2024-10-14 | S$5,388,000 |
| ST ENGINEERING INFO-SECURITY PTE. LTD. | Provision Of Cyber Threat Intelligence & Cybersecurity Forensic Retainer Services | 2024-10-10 | S$90,860.22 |
| NANYANG TECH PTE. LTD. Not yet published | SUPPLY AND DELIVERY OF BACKPACKS FOR HDB | 2024-10-09 | S$35 |
| SAA ARCHITECTS PTE LTD | (A) CONSULTANCY SERVICES FOR DESIGN FEASIBILITY STUDY FOR A HDB TOWN CENTRE; (B) MULTI-DISCIPLINARY (ARCHITECTURAL, CIVIL & STRUCTURAL ENGINEERING, MECHANICAL & ELECTRICAL ENGINEERING, QUANTITY SURVEYING & PROJECT MANAGEMENT) CONSULTANCY SERVICES FOR PUBLIC HOUSING PROJECT CO | 2024-10-02 | S$1,000,000 |
| THONG HUAT BROTHERS (PTE) LIMITED | PART A: BUILDING WORKS AT HOUGANG NEIGHBOURHOOD 1 CONTRACT 13A (TOTAL: 360 DWELLING UNITS) PART B: CONTINGENCY WORKS | 2024-09-30 | S$98,000,000 |
| KIAN HIAP CONSTRUCTION PTE LTD | PART A: BUILDING WORKS AT BEDOK NEIGHBOURHOOD 5 CONTRACT 18 (TOTAL: 433 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-09-30 | S$105,120,000 |
| ACL CONSTRUCTION (S) PTE LTD | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 2 PROJECT 3 CENTRAL ZONE | 2024-09-30 | S$30,800,000 |
| PAL-LINK CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT PROJECT DR (TOTAL: 355 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-09-30 | S$100,970,000 |
| STRAITS CONSTRUCTION SINGAPORE PRIVATE LIMITED | PART A: BUILDING WORKS AT JURONG EAST NEIGHBOURHOOD 4 CONTRACT 19 (TOTAL: 1,086 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-09-30 | S$258,300,000 |
| NATIONAL UNIVERSITY OF SINGAPORE Not yet published | CONSULTANCY SERVICES TO CONDUCT HERITAGE SURVEY FOR A FUTURE DEVELOPMENT AREA | 2024-09-19 | S$102,000 |
| MEINHARDT (SINGAPORE) PTE LTD | SPECIALIST PROFESSIONAL ENGINEERING (GEOTECHNICAL) CONSULTANCY SERVICES FOR PROJECT EP | 2024-09-12 | S$168,000 |
| CPG CONSULTANTS PTE LTD | SPECIALIST ACCREDITED CHECKING SERVICES FOR PROJECT BW | 2024-09-10 | S$72,000 |
| N & T ENGINEERING ENTERPRISE (PTE) LTD | Term Contract for Maintenance of Mechanical and Electrical Installations in HDB Civil Defence Shelters for A Period of Thirty-Six (36) Months (Zone 1) | 2024-09-09 | S$751 |
| CHUAN SOON M&E PTE. LTD. | Term Contract for Maintenance of Mechanical and Electrical Installations in HDB Civil Defence Shelters for a Period of Thirty-Six (36) Months (Zone 2) | 2024-09-09 | S$831 |
| J. KEART ALLIANCES PTE. LTD. | TERM CONTRACT FOR MAINTENANCE OF FIRE PROTECTION SYSTEMS TO VARIOUS HDB COMMERCIAL PROPERTIES (YEAR 2024 TO 2027) (ZONE 2 - CENTRAL & WEST CLUSTER) | 2024-09-06 | S$18,004 |
| LINCOTRADE & ASSOCIATES PTE LTD | RENOVATION WORKS AT VARIOUS LEVELS OF THE MINISTRY OF NATIONAL DEVELOPMENT (MND) TOWER BLOCK | 2024-09-06 | S$12,838,888 |
| DIGO CORPORATION PTE. LTD. | TERM CONTRACT FOR MAINTENANCE OF FIRE PROTECTION SYSTEMS TO VARIOUS HDB COMMERCIAL PROPERTIES (YEAR 2024 TO 2027) (ZONE 1 - EAST & NORTH CLUSTER) | 2024-09-06 | S$52,182 |
| ANNESING PTE. LTD. Not yet published | PRODUCTION AND MAINTENANCE / MODIFICATION OF ARCHITECTURAL MODEL FOR A HDB NEIGHBOURHOOD | 2024-09-06 | S$171,800 |
| SETSCO SERVICES PTE LTD | Laboratory Services For The Environmental Monitoring And Management Plan For Coastal Development At Pulau Sudong | 2024-09-05 | S$578,481 |
| DHI WATER & ENVIRONMENT (S) PTE. LTD. | Specialist Consultancy Services For The Environmental Monitoring And Management Plan For Coastal Development At Pulau Sudong | 2024-09-05 | S$14,388,888 |
| KAY LIM CONSTRUCTION & TRADING PTE LTD | PART A: BUILDING WORKS AT PUNGGOL WEST CONTRACT 41 (TOTAL: 1,026 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-08-30 | S$270,900,000 |
| KEN-PAL (S) PTE. LTD. | PART A: BUILDING WORKS AT CHOA CHU KANG NEIGHBOURHOOD 1 CONTRACT 17 / 18 AND PARK (TOTAL: 465 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-08-30 | S$154,200,000 |
| ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS INCLUDING AUTOMATED TUNNEL MONITORING SYSTEM FOR PROJECT BG | 2024-08-30 | S$490,282.6 |
| NEWCON BUILDERS PTE. LTD. | PROJECT 1: PART A: BUILDING WORKS AT TANGLIN HALT CONTRACT 2 (TOTAL 251 DWELLING UNITS); PART B: CONTINGENCY WORKS; PROJECT 2: INFRASTRUCTURE WORKS AT TANGLIN HALT CONTRACT 2 | 2024-08-30 | S$182,380,000 |
| STRAITS CONSTRUCTION SINGAPORE PRIVATE LIMITED | PART A: BUILDING WORKS AT PROJECT BC (TOTAL: 753 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-08-30 | S$169,200,000 |
| IFOCUS PTE LTD | FOURTEEN TERM CONTRACT FOR THE SUPPLY, DELIVERY, INSTALLATION AND MAINTENANCE OF LIFT SURVEILLANCE SYSTEM (LSS) FOR A PERIOD OF FORTY EIGHT (48) MONTHS | 2024-08-28 | S$1,321,500 |
| FOONG AH WENG CONSTRUCTION PTE LTD | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 65) | 2024-08-28 | S$11,463,000 |
| CITYNEON HOLDINGS PTE. LTD. | PROVISION OF CONCEPTUALISATION AND EVENT MANAGEMENT SERVICES FOR: PART A: COMMUNITY CARE APARTMENT EXHIBITION AT HDB HUB ATRIUM AND PART B: MOCK-UP UNIT FOR COMMUNITY CARE APARTMENT | 2024-08-27 | S$39,521.25 |
| PEDRO INVESTIGATIONS & SECURITY SERVICES PTE LTD | PROVISION OF SECURITY MONITORING SERVICES AND MAINTENANCE OF SECURITY ALARM SYSTEM AT HDB BRANCHES FOR A PERIOD OF 33 MONTHS (YEAR 2024 TO 2027) | 2024-08-26 | S$23,000 |
| ML INTERNATIONAL TRADING PTE. LTD. | IMPROVEMENT WORKS TO WOODLANDS NORTH PLAZA AND 888 PLAZA | 2024-08-23 | S$272,368 |
| HWEE WAH ENGINEERING PTE. LTD. | Construction Of Bus Shelters Along Yishun Ave 1 | 2024-08-19 | S$1,755,000 |
| CHAN RONG FEN BUILDING CONSTRUCTION PTE LTD | PART A : BUILDING WORKS AND COMMON GREEN AND INTERIM SURFACE CAR PARK AND RECONFIGURATION OF EXISTING SURFACE CAR PARK AT PROJECT BB (TOTAL: 897 DWELLING UNITS); PART B : CONTINGENCY WORKS | 2024-08-16 | S$220,000,000 |
| ST ENGINEERING SYNTHESIS PTE. LTD. | Provision of Managing Agent Services and Improvement Works within HDB Flats for a period of 2 years (East Zone) | 2024-08-13 | S$88,553.5 |
| CTM FACILITIES MANAGEMENT PTE. LTD. | Provision of Managing Agent Services and Improvement Works within HDB Flats for a period of 2 years (West Zone) | 2024-08-13 | S$163,450 |
| SAVILLS PROPERTY MANAGEMENT PTE. LTD. | Provision of Managing Agent Services and Improvement Works within HDB Flats for a period of 2 years (Central Zone) | 2024-08-13 | S$81,727.5 |
| SING HENG HOE CONSTRUCTION (1988) PTE LTD | (A) CONSTRUCTION OF ROAD RELATED FACILITIES (RRF) AT TENGAH TOWN (PHASE 3); (B) UPGRADING OF EXISTING BUS STOP AT CHOA CHU KANG N8; (C) SEWER RECTIFICATION WORK AT CHOA CHU KANG N8; (D) CONSTRUCTION OF TRUNK SEWER AT TENGAH PARK AVENUE | 2024-08-13 | S$6,070,858 |
| KIM YEW INTEGRATED PTE. LTD. | Provision of Managing Agent Services and Improvement Works within HDB Flats for a period of 2 years (North-East Zone) | 2024-08-13 | S$65,008 |
| FOONG AH WENG CONSTRUCTION PTE LTD | (A) IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 62) AND (B) TERM CONTRACT FOR MINOR IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (ZONE 1) | 2024-08-13 | S$7,693,000 |
| SIONG CONSTRUCTION & ENGINEERING PTE. LTD. | (A) IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 64) AND (B) TERM CONTRACT FOR MINOR IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (ZONE 2) | 2024-08-13 | S$8,876,000 |
| ONEBERRY TECHNOLOGIES PTE. LTD. | TERM CONTRACT FOR PROVISION OF SECURITY SERVICES AT MND COMPLEX FOR A PERIOD OF THREE (3) YEARS | 2024-08-12 | S$324,933 |
| HEPTACON CONSTRUCTION PTE. LTD. | SPRUCING WORKS FOR HDB FLATS (CONTRACT 2) | 2024-08-12 | S$85,293.62 |
| TEAMBUILD ENGINEERING & CONSTRUCTION PTE. LTD. | SPRUCING WORKS FOR HDB FLATS (CONTRACT 1) | 2024-08-12 | S$189,916 |
| HTC CONSTRUCTION PTE. LTD. | SPRUCING WORKS FOR HDB FLATS (CONTRACT 3) | 2024-08-12 | S$85,956 |
| OCTA METIER PTE. LTD. Not yet published | PROVISION OF SITE SUPERVISION SERVICES FOR SPRUCING WORKS | 2024-08-12 | S$21,800 |
| SAMWOH RESOURCES PTE LTD | Supply of 20MM Aggregate To The HDB (Batch 89) | 2024-08-08 | S$23.58 |
| CPG FACILITIES MANAGEMENT PTE LTD | PROVISION OF INTEGRATED FACILITIES MANAGEMENT (IFM) SERVICES TO COMMERCIAL PROPERTIES (SECTOR 2) | 2024-08-08 | S$1,039,680 |
| HAO DA PTE LTD | DEMOLITION WORKS FOR HDB RESIDENTIAL BLOCKS (BATCH 17- PARCEL 2A) | 2024-08-07 | S$1,377,811 |
| SENSINGTECH PTE. LTD. Not yet published | INSTRUMENTATION AND MONITORING WORKS OF AUTOMATIC TUNNEL MONITORING SYSTEM FOR PROJECT BS | 2024-08-01 | S$148,440 |
| ORIENT NATURAL RESOURCES PTE. LTD. | Supply of Fine Aggregates to the HDB (Batch 82) | 2024-07-31 | S$26.68 |
| RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | Soil Investigation Works on HDB Land at Bedok South Avenue 3 | 2024-07-30 | S$190,200 |
| SRK ENGINEERING PTE. LTD. | MECHANICAL AND ELECTRICAL CYCLICAL IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 29) | 2024-07-29 | S$5,737,800 |
| PLANTWERKZ PTE. LTD. | PROVISION OF LANDSCAPING SERVICES ON TOPMOST PARKING DECKS OF EXISTING MULTI-STOREY CAR PARKS (MSCP) (BATCH 13) | 2024-07-26 | S$143,723.55 |
| CKMBT INTERNATIONAL PTE. LTD. | ACCREDITED CHECKING SERVICES FOR PROJECT BR | 2024-07-19 | S$45,800 |
| TECHCOM SOLUTIONS PTE. LTD. | SUPPLY OF PROGRAMMING AND IT RELATED SERVICES FOR A PERIOD OF 3 YEARS (CONTRACT 43 - 2024) | 2024-07-15 | S$3,600 |
| WSH EXPERTS PTE. LTD. Not yet published | SUPPLY OF PROGRAMMING AND IT RELATED SERVICES FOR A PERIOD OF 3 YEARS (CONTRACT 41 - 2024) | 2024-07-15 | S$3,600 |
| NCS COMMUNICATIONS ENGINEERING PTE. LTD. | Cyber Resilient Storage for Enterprise Server Backup | 2024-07-10 | S$629,975 |
| PV VACUUM ENGINEERING PTE LTD | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT PROJECT CV-CW, CU & CK | 2024-07-10 | S$5,784,329 |
| GREENWAVE SOLUTIONS PTE. LTD. | DESIGN, BUILD & OPERATE PNEUMATIC WASTE CONVEYANCE SYSTEM (PWCS) AT PROJECT CQ & CX-CY | 2024-07-10 | S$4,590,700 |
| BENG SOON MACHINERY SERVICES (SINGAPORE) PTE LTD | DEMOLITION WORKS FOR PROJECT B (BATCH 24) | 2024-07-08 | S$5,909,000 |
| IFOCUS PTE LTD | Supply, Delivery, Installation and Maintenance of Lift Monitoring Device for TeleMonitoring System (Phase 16) | 2024-07-08 | S$442,200 |
| SING YIET CIVIL ENGINEERING CONTRACTOR PTE LTD | Addition and Alteration Works to Car Parks (C10) | 2024-07-04 | S$8,988,000 |
| SH INTEGRATED SERVICES PTE. LTD. | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 61) | 2024-07-02 | S$8,111,111 |
| QING FENG CONSTRUCTION PTE LTD | PART A: BUILDING WORKS AT BUKIT PANJANG NEIGHBOURHOOD 1 CONTRACT 14 (TOTAL: 334 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-07-01 | S$89,500,000 |
| LC&T BUILDER (1971) PTE. LTD. | PART A: BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 1 CONTRACT 31 (TOTAL: 399 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-06-28 | S$126,900,000 |
| WELLTECH CONSTRUCTION PTE LTD | PART A: BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 9 CONTRACT 2 (TOTAL: 848 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-06-28 | S$214,600,000 |
| LIM WEN HENG CONSTRUCTION PTE LTD | PROJECT 1: PART A: BUILDING WORKS AT PROJECT DL (TOTAL: 528 DWELLING UNITS); PART B: CONTINGENCY WORKS. PROJECT 2: DRAINAGE RECONSTRUCTION WORKS ALONG NEW UPPER CHANGI ROAD | 2024-06-28 | S$126,343,900 |
| TEAMBUILD ENGINEERING & CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT JURONG WEST NEIGHBOURHOOD 4 CONTRACT 22 (TOTAL: 716 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-06-28 | S$194,788,000 |
| HEXADIUS CONSULTING PTE. LTD. | DESIGN, DEVELOP, TEST, INTEGRATE, COMMISSION AND MAINTENANCE OF IDENTITY AND ACCESS MANAGEMENT SYSTEM (IDAMS) | 2024-06-28 | S$1,491,000 |
| ST ENGINEERING TRAINING & SIMULATION SYSTEMS PTE. LTD. | RENEWAL OF IBM SYSTEM SOFTWARE AND MAINTENANCE FOR THREE (3) YEARS | 2024-06-26 | S$21,506,353.29 |
| CAMBRIAN ENGINEERING CORPORATION PTE LTD | Maintenance of Tremor Monitoring System (TRS) 2024 | 2024-06-14 | S$24,940 |
| ECAS CONSULTANTS PTE. LTD. | ACCREDITED CHECKING SERVICES FOR CONSTRUCTION OF URBANWATER HARVESTING SYSTEM AT EXISTING ESTATES | 2024-06-14 | S$145,000 |
| BENG SIEW CONSTRUCTION PTE LTD | DEMOLITION WORKS FOR HDB RESIDENTIAL BLOCKS (BATCH 17 - PARCEL 3) | 2024-06-12 | S$4,794,100 |
| ABL CONSULTANTS PTE. LTD. Not yet published | ENGINEERING CONSULTANCY SERVICES FOR CERTIFICATION OF FITNESS OF RECLAIMED LAND FOR THE PURPOSE OF PROCLAMATION OF POLDER AT AREAS A AND C OF PULAU TEKONG | 2024-06-06 | S$120,000 |
| TOA CORPORATION | Infilling Works (Phase 4) | 2024-05-31 | S$108,597,000 |
| LBD ENGINEERING PTE. LTD. | PART A: BUILDING WORKS AT PROJECT AO (TOTAL: 741 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-05-31 | S$175,000,000 |
| VICO CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT WOODLANDS NEIGHBOURHOOD 4 CONTRACT 7 (TOTAL: 1,127 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-05-31 | S$248,777,000 |
| TEAMBUILD ENGINEERING & CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT BUKIT MERAH CONTRACT 54 AND 54A (TOTAL 1,462 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-05-31 | S$427,000,000 |
| TEAMBUILD ENGINEERING & CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT PROJECT AR (TOTAL: 545 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-05-31 | S$169,628,000 |
| SETSCO SERVICES PTE LTD | SUPPLY OF TESTING SERVICES TO MECHANICAL COUPLER FOR REINFORCEMENT BAR SIZE OF 16MM DIAMETER AND 20MM DIAMETER | 2024-05-30 | S$15,666.2 |
| ANG & ONG CONSULTANTS PTE. LTD. | MULTI-DISCIPLINARY (CIVIL & STRUCTURAL ENGINEERING AND QUANTITY SURVEYING) CONSULTANCY SERVICES FOR VARIOUS DEMOLITION PROJECTS (BATCH 29) | 2024-05-30 | S$426,000 |
| AIK SUN DEMOLITION & ENGINEERING PTE LTD | DEMOLITION WORKS FOR PROJECT B (BATCH 23) | 2024-05-24 | S$1,200,000 |
| GEOAPPLICATION ENGINEERS PTE. LTD. | INSTRUMENTATION MONITORING SERVICES FOR EARTHWORKS AND INFRASTRUCTURE WORKS AT TENGAH TOWN (PHASE 5) | 2024-05-24 | S$87,855 |
| HWA AIK ENGINEERING PTE. LTD. | Demolition Works for Project A (Batch 28) | 2024-05-24 | S$2,700,000 |
| BT&TAN TRANSPORT PTE. LTD. | Provision of Shuttle Bus Services for Commercial Complexes for a Period of Two (2) Years | 2024-05-17 | S$25,900 |
| CHUBB SINGAPORE PRIVATE LIMITED | TERM CONTRACT FOR MAINTENANCE OF FIRE PROTECTION SYSTEMS AT HDB HUB FOR A PERIOD OF THIRTY-SIX (36) MONTHS | 2024-05-15 | S$16,790 |
| WILLOWGLEN SERVICES PTE LTD | Design, Supply, Installation and Maintenance for Lift Monitoring Devices (LMD) under the LMD Enhancement Programme Phase 2 - 1,500 units | 2024-05-15 | S$2,273,505 |
| ESPIRE INFOLABS (SINGAPORE) PTE. LTD. Not yet published | Installation, Upgrading, Testing, Commissioning and Maintenance of (COTS) Customer Communication Management Software - Quadient Inspire | 2024-05-15 | S$1,203,488 |
| C+H ASSOCIATES PTE. LTD. | PROVISION OF FACILITIES MANAGEMENT SERVICES (YEAR 2024 TO 2027) | 2024-05-10 | S$232,800 |
| BAN SENG ENGINEERING PTE. LTD. | Installation of Safety Fencing at 15 MSCP Top Deck Community / Allotment Gardens | 2024-05-10 | S$112,813 |
| LEAP INTEGRATED PTE. LTD. | Mechanical and Electrical Cyclical Improvement Works to Multi-Storey Car Parks (Batch 23) | 2024-05-09 | S$3,525,705 |
| I-LOGIC CONCEPTS PTE. LTD. | Demolition Works For State Property - Batch 20 Project A | 2024-05-09 | S$860,400 |
| AVENUE ENGINEERING PTE. LTD. | (A) Road Repair and Resurfacing at Choa Chu Kang; (B) Road Repair and Resurfacing at Bukit Batok; (C) Re-turfing for Slopes at Bukit Batok; (D) CE Term Contract (Balance of Works) | 2024-05-08 | S$9,000,000 |
| PERMA-LINER INDUSTRIES (SINGAPORE) PTE. LTD. | Repair of Trunk Sewer No. 9 at Anchorvale St, Anchorvale Crescent, Anchorvale Link and Sengkang East Road | 2024-05-08 | S$1,889,122.9 |
| UNITED SPECIALISTS PTE LTD | Construction of Pedestrian Overhead Bridge at Tampines Avenue 12 | 2024-05-07 | S$2,512,000 |
| CHAN RONG FEN BUILDING CONSTRUCTION PTE LTD | PART A: BUILDING WORKS AT KALLANG WHAMPOA CONTRACT 72 (TOTAL: 1,040 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-05-06 | S$233,000,000 |
| DN HYBRID PTE. LTD. | Addition And Alteration Works to Toilets (Phase 2), Lift Lobbies & Escalator at HDB Hub | 2024-05-03 | S$9,273,000 |
| YUAN MEI CHEN (S) PTE. LTD. | DESIGN & RECONFIGURATION WORKS FOR OFFICE SPACE AT HDB HUB (LEVEL 31) | 2024-05-03 | S$995,786 |
| I-LOGIC CONCEPTS PTE. LTD. | PROPOSED DEMOLITION OF EXISTING BUILDINGS AND ANCILLARY STRUCTURES (BATCH 25) | 2024-04-30 | S$1,548,000 |
| W'RAY CONSTRUCTION PTE. LTD. | ELECTRICAL LOAD UPGRADING PROGRAMME (ELUP) BATCH 3 PROJECT 2 (SOUTH ZONE) | 2024-04-29 | S$38,688,000 |
| KTC CIVIL ENGINEERING & CONSTRUCTION PTE LTD | (A) SITE PREPARATION WORKS AT TENGAH TOWN (PHASE 5); (B) TERM CONTRACT FOR CIVIL ENGINEERING WORKS | 2024-04-24 | S$39,545,000 |
| NCS COMMUNICATIONS ENGINEERING PTE. LTD. | OPEN SYSTEM DISK STORAGE AND SAN SWITCHES | 2024-04-19 | S$2,126,937 |
| NATIONAL UNIVERSITY OF SINGAPORE Not yet published | APPOINTMENT OF INDEPENDENT 3RD PARTY ASSESSOR FOR SOLAR PV ASSESSMENT (SOLARNOVA PHASE 8) AT HDB RESIDENTIAL BLOCKS | 2024-04-19 | S$567,600 |
| HITACHI ELEVATOR ASIA PTE. LTD. | THIRTY-FIFTH TERM CONTRACT FOR THE SUPPLY, DELIVERY, INSTALLATION AND MAINTENANCE OF LIFTS FOR THREE-YEAR PERIOD | 2024-04-18 | S$12,294,565 |
| ACEPLP.COM PTE LTD Not yet published | Supply of BIM Specialist Services (Batch 4A) | 2024-04-17 | S$13,200 |
| HL BUILDING MATERIALS PTE. LTD. | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 11) | 2024-04-12 | S$4,119.6 |
| ROBIN VILLAGE DEVELOPMENT PTE. LTD. | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 12) | 2024-04-12 | S$3,590.8 |
| PRECAST CONCRETE PTE. LTD. | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 13) | 2024-04-12 | S$3,801.25 |
| SUNWAY CONCRETE PRODUCTS (S) PTE LTD | Term Contract for the Production, Supply and Delivery of Large Panel Slab (LPS) to Various HDB Building Sites (Batch 14) | 2024-04-12 | S$3,562.7 |
| ORIENT NATURAL RESOURCES PTE. LTD. | Supply of Fine Aggregates to the HDB (Batch 81) | 2024-04-12 | S$26.68 |
| FPT ASIA PACIFIC PTE. LTD. | Provision Of Professional Services To Maintain, Support And Enhance The HDB Digital Document Repository (HDB DDR) For Three (3) Years | 2024-04-12 | S$42,285 |
| SAMKANG CONSTRUCTION PTE LTD | (A) CONSTRUCTION OF SIN MING STREET (PART 1); (B) TRUNK SEWER DIVERSION AT SIN MING ESTATE | 2024-04-11 | S$6,432,583 |
| YENG TONG CONSTRUCTION PTE LTD | Earthworks At Yishun Contract No. 2 | 2024-04-08 | S$18,266,917.37 |
| CHANG FENG CONSTRUCTION PTE. LTD. Not yet published | (A) CONSTRUCTION OF BUS SHELTERS ALONG TAMPINES ST. 96 (B) CONSTRUCTION OF BUS SHELTERS ALONG TAMPINES ST. 95 (C) CONSTRUCTION OF HIGH COVERED LINKWAY ACROSS TAMPINES ST. 96 | 2024-04-02 | S$1,813,000 |
| E-TENG BUILDERS PTE. LTD. | ADDITION AND ALTERATION (A&A) WORKS AT BLK 712, ANG MO KIO AVE 6 | 2024-04-01 | S$49,800 |
| WILLY INSURANCE BROKERS PTE. LTD. | PROVISION OF PUBLIC LIABILITY INSURANCE FOR THE PERIOD 1 APRIL 2024 TO 31 MARCH 2027 | 2024-03-26 | S$135,000 |
| INNOCOM TECHNOLOGIES PTE LTD | Supply of Autodesk Software | 2024-03-25 | S$176,630 |
| YUAN MEI CHEN (S) PTE. LTD. | DESIGN AND RENOVATION WORKS TO THE EAST WING LEVEL 8 OFFICE EXTENSION AND ENHANCEMENT WORKS TO EAST WING 19 AND WEST WING 26 OFFICES AT HDB HUB | 2024-03-22 | S$698,880 |
| KWANG SING ENGINEERING PTE. LTD. | Instrumentation and Monitoring Works for Proposed Public Housing Development at Ulu Pandan Contract 2 and Contract 3 | 2024-03-18 | S$316,188 |
| KTC CIVIL ENGINEERING & CONSTRUCTION PTE LTD | Site Clearance & Earthworks at Telok Blangah (Contract 2) | 2024-03-14 | S$24,150,000 |
| GUAN JOO CONSTRUCTION PTE LTD | Project 1: Balance of Works at Tampines St 92, Tampines Ave 1 & Tampines Concourse; Project 2: Balance of Works at Punggol; Project 3: Balance of Works at Tengah (Phase 1) | 2024-03-13 | S$21,490,755 |
| RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS FOR INFRASTRUCTURE WORKS AT TOA PAYOH WEST (CONTRACT 1) | 2024-03-11 | S$509,474 |
| STRATEGIC ENGINEERING & CONSTRUCTION PTE. LTD. | IMPROVEMENT WORKS TO MULTI-STOREY CAR PARKS (BATCH 60) | 2024-03-08 | S$9,770,000 |
| KEN-PAL (S) PTE. LTD. | PART A: BUILDING WORKS AT CHOA CHU KANG NEIGHBOURHOOD 1 CONTRACT 19-20 PART I & PARK (TOTAL: 873 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-03-07 | S$249,500,000 |
| SHINCON INDUSTRIAL PTE. LTD. | PROJECT 1: ADDITION AND ALTERATION WORKS TO CAR PARKS (C9) - BALANCE OF WORKS; PROJECT 2: IMPROVEMENT WORKS TO SURFACE CAR PARKS (BATCH 79) - BALANCE OF WORKS | 2024-03-06 | S$6,088,651 |
| KOK KIAT MACHINERY PTE LTD | SITE CLEARANCE AND EARTHWORKS AT GEYLANG | 2024-03-06 | S$1,442,400 |
| TOPPAN ECQUARIA PTE. LTD. | Appointment of Panel of Contractors for Provision and Supply of ICT Professional Services (Augmentation Resources) for a Period of Three Years with Option to Extend for Two Years | 2024-03-06 | S$14,450 |
| ACTIVATE INTERACTIVE PTE LTD | Appointment of Panel of Contractors for Provision and Supply of ICT Professional Services (Augmentation Resources) for a Period of Three Years with Option to Extend for Two Years | 2024-03-06 | S$15,525 |
| COGNIZANT TECHNOLOGY SOLUTIONS ASIA PACIFIC PTE. LTD. | Appointment of Panel of Contractors for Provision and Supply of ICT Professional Services (Augmentation Resources) for a Period of Three Years with Option to Extend for Two Years | 2024-03-06 | S$5,151.5 |
| TATA CONSULTANCY SERVICES ASIA PACIFIC PTE. LTD. | Appointment of Panel of Contractors for Provision and Supply of ICT Professional Services (Augmentation Resources) for a Period of Three Years with Option to Extend for Two Years | 2024-03-06 | S$9,787 |
| MORGAN MCKINLEY PTE. LTD. | Appointment of Panel of Contractors for Provision and Supply of ICT Professional Services (Augmentation Resources) for a Period of Three Years with Option to Extend for Two Years | 2024-03-06 | S$4,559 |
| WSH EXPERTS PTE. LTD. Not yet published | Appointment of Panel of Contractors for Provision and Supply of ICT Professional Services (Augmentation Resources) for a Period of Three Years with Option to Extend for Two Years | 2024-03-06 | S$14,790 |
| HUNG YAO SHENG ENGINEERING PTE. LTD. | Construction of Trunk Sewer at Indus Road | 2024-03-05 | S$1,688,560 |
| ROBIN VILLAGE DEVELOPMENT PTE. LTD. | Term Contract For The Production And Delivery Of Precast Concrete Components At HDB Centre Of Building Research (Batch 5) | 2024-03-01 | S$201,722.67 |
| ARUP SINGAPORE PRIVATE LIMITED | SERVICES FOR BUILDING OF DIGITAL UNITISED MODEL FOR HDB BLOCKS IN HDB TOWNS | 2024-03-01 | S$1,859,000 |
| LC&T BUILDER (1971) PTE. LTD. | PART A: BUILDING WORKS AT PROJECT CP (TOTAL: 689 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-02-29 | S$175,100,000 |
| LC&T BUILDER (1971) PTE. LTD. | PART A: BUILDING WORKS AT YISHUN NEIGHBOURHOOD 5 CONTRACT 12 (TOTAL: 725 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-02-29 | S$190,000,000 |
| KWANG SING ENGINEERING PTE. LTD. | INSTRUMENTATION AND MONITORING WORKS FOR THE PROPOSED PUBLIC HOUSING DEVELOPMENT AT CHOA CHU KANG N1 C19-20 PART 2 & PARK | 2024-02-29 | S$76,474 |
| JIA YI CONSTRUCTION PTE. LTD. | PART A: BUILDING WORKS AT CHOA CHU KANG NEIGHBOURHOOD 1 CONTRACT 19-20 PART II & PARK & PEDESTRIAN BRIDGE (TOTAL: 1,022 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-02-29 | S$307,800,000 |
| ENGRO CORPORATION LIMITED | Supply Of Ordinary Portland Cement To The HDB (Batch 52) | 2024-02-28 | S$83.1 |
| EXPONENT PTE. LTD. Not yet published | Addition and Alteration Works at Level 5 & Level 6 of HDB Hub | 2024-02-27 | S$1,695,049 |
| SAMWOH RESOURCES PTE LTD | Supply of 20mm Aggregate to the HDB (Batch 88) | 2024-02-23 | S$23.11 |
| CKMBT INTERNATIONAL PTE. LTD. | Periodic Structural Inspection and Related Works at Various HDB Estates (Batch 39A-2023/24) | 2024-02-22 | S$475 |
| SING & SAN CONSTRUCTION PTE LTD | DIVERSION OF EXISTING WATER MAINS AT JURONG WEST NEIGHBOURHOOD 4 CONTRACT 22 | 2024-02-20 | S$147,000 |
| ENTRE' AUTOMATICS PTE. LTD. | IMPROVEMENT WORKS FOR OFFICE ENTRANCES AT HDB HUB | 2024-02-19 | S$7,099.79 |
| YUAN MEI CHEN (S) PTE. LTD. | Addition and Alteration Works at East Wing, Level 14, HDB Hub | 2024-02-19 | S$1,282,280 |
| CHYE JOO CONSTRUCTION PTE LTD | Earthworks At Yishun Contract No. 1 (Balance Of Works) | 2024-02-16 | S$14,676,860 |
| KOK TONG CONSTRUCTION PTE LTD | Major Infrastructure Works at Neighbourhood B (Phase 1A) | 2024-02-16 | S$15,450,000 |
| JIB SPECIALIST CONSULTANTS PTE. LTD. Not yet published | ACCREDITED CHECKING SERVICES FOR PROJECT AM | 2024-02-07 | S$88,000 |
| GARDEN WORKS PTE. LTD. | PROVISION OF LANDSCAPING SERVICES ON TOPMOST PARKING DECKS OF EXISTING MULTI- STOREY CAR PARKS (MSCP) (BATCH 12) | 2024-02-01 | S$320,000 |
| WELLTECH CONSTRUCTION PTE LTD | PART A: BUILDING WORKS AT ULU PANDAN CONTRACT 3 (TOTAL: 890 DWELLING UNITS); PART B: CONTINGENCY WORKS | 2024-01-31 | S$301,600,000 |
Contains information from ACRA Information on Corporate Entities accessed on 2026-09-16 from data.gov.sg, made available under the terms of the Singapore Open Data Licence version 1.0. Government tender data from GeBIZ Government Procurement, same licence.Sole proprietorships, partnerships and entities whose registered particulars would identify a natural person are not listed — see data sources & methodology.
Not an official business register. For official records use bizfile.gov.sg.
Spotted an error, or want a company removed? Use the contact form — no justification required for removal.