Government tenders awarded by Jurong Town Corporation
- 242 companies have won 399 government tenders awarded by Jurong Town Corporation through GeBIZ, worth S$2,691,492,188.83 in total, as of 2026-10-14.
See how GeBIZ tenders work for how an award ends up here and what it does and doesn't confirm.
Awarded tenders
| Company | Description | Awarded | Amount |
|---|---|---|---|
| T.Y.LIN INTERNATIONAL PTE. LTD. | Provision of Consultancy Services for Feasibility Study on Infrastructure Works for Service Connectivity at Jurong Island | 2026-03-26 | S$432,500 |
| PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Sungei Kadut (Group 18) | 2026-03-25 | S$2,417,000 |
| KNIGHT FRANK PTE LTD | PROVISION OF RETAIL CONSULTANCY SERVICES PREDOMINANTLY FOR BUSINESS PARK / INDUSTRIAL B2 IN JURONG INNOVATION DISTRICT | 2026-03-19 | S$365,000 |
| AEQON TJ PTE. LTD. | PROVISION OF COMPREHENSIVE MAINTENANCE FOR NON-PROPRIETARY SYSTEMS AT JI CHECKPOINT & PDL CHECKPOINT FOR PERIOD OF 2 YEARS | 2026-02-27 | S$455,112 |
| LSW CONSULTING ENGINEERS PTE. LTD. | Provision of Civil & Structural Engineering Consultancy Services for Infrastructure Works at East Seletar | 2026-01-29 | S$1,982,008.74 |
| PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | PROPOSED DEMOLITION OF EXISTING FACTORY BUILDINGS AND ANCILLARY STRUCTURES AT KRANJI WAY, SUNGEI KADUT AND TUAS (GROUP 17) | 2026-01-21 | S$2,674,000 |
| AUTOMATIC CONTROLS AND INSTRUMENTATION PTE. LTD. | DESIGN, SUPPLY, INSTALL, TEST AND COMMISSION OPEN DIGITAL PLATFORM (ODP) INTERFACE MODULES FOR LIFT INTEGRATION TO THE ODP AT BULIM SQUARE | 2026-01-19 | S$34,200 |
| ACEPLP.COM PTE LTD | 2-YEAR TERM CONTRACT FOR PROVISION OF THREE (3) IN-SOURCED IDD MANAGERS AND TWO (2) EXECUTIVE ADMINISTRATORS FOR MANAGEMENT OF BUILT ENVIRONMENT (BE) PROJECTS AND CDE ADMINISTRATIVE MATTERS | 2026-01-19 | S$1,593,600 |
| DELOITTE SINGAPORE ASSURANCE PTE. LTD. | Provision Of Consultancy Services On Audit Methodology & Benchmarking For Audit & Advisory Division (AAD) | 2026-01-02 | S$332,400 |
| SOIL INVESTIGATION PTE. LIMITED | Instrument Monitoring Works for Proposed Reclamation at Northern Tuas Basin | 2025-12-19 | S$1,999,000 |
| HTC SOFTWARE SINGAPORE PTE LTD | Provision of Contract Resources for Finance Operations in JTC | 2025-12-19 | S$1 |
| RMA CONTRACTS PTE. LTD. | Provision of Contract Resources for Finance Operations in JTC | 2025-12-19 | S$1 |
| EXPERTISE TECHNOLOGIES PTE LTD | Provision of Contract Resources for Finance Operations in JTC | 2025-12-19 | S$1 |
| MORGAN MCKINLEY PTE. LTD. | Provision of Contract Resources for Finance Operations in JTC | 2025-12-19 | S$1 |
| STEADFAST ENGINEERING & CONSTRUCTION PTE. LTD. | REPAIR OF 20 JURONG PIER ROAD BUILDING UNDERDECK AND DEMOLITION OF EXISTING JETTY (PIER 20) AT 35 JURONG PIER ROAD | 2025-12-19 | S$2,758,210 |
| ASCENDION ENGINEERING SOLUTIONS SINGAPORE PTE. LTD. | Provision of Contract Resources for Finance Operations in JTC | 2025-12-19 | S$1 |
| WSH EXPERTS PTE. LTD. | Provision of Contract Resources for Finance Operations in JTC | 2025-12-19 | S$1 |
| HWEE WAH ENGINEERING PTE. LTD. | Proposed Land Rectification Works at Kaki Bukit iGLS along Bedok Reservoir Road | 2025-12-11 | S$3,000,000 |
| MIE-TECH ENGINEERING & CONSTRUCTION PTE LTD | PROPOSED REPAIRS AND REFURBISHMENTS OF UNITS #01-1367, 1369 & 1375 WITH RECONSTRUCTION OF UNITS #01-1371 & 1373 OF BLOCK 3 ON LOT 10841P MK 17 @ TOA PAYOH INDUSTRIAL PARK | 2025-12-10 | S$647,700 |
| HUATIONG CONTRACTOR PTE LTD | Proposed Development of Heavy Vehicle Park at Tengah | 2025-11-27 | S$22,380,000 |
| AECOM SINGAPORE PTE. LTD. | Provision of Multi-Disciplinary Consultancy Services for Preliminary Coastal Development Plan at West of Singapore | 2025-11-24 | S$4,200,001 |
| NEXUS CONSULTANCY SERVICES PTE LTD | 3-YEAR TERM CONTRACT FOR LEASING OF CONTAINER OFFICES AT JURONG ISLAND CHECKPOINT | 2025-11-20 | S$217,300 |
| P & T CONSULTANTS PTE. LTD. | Multi-Disciplinary Consultancy Services for JTC Food Hub 2 @ Senoko | 2025-11-18 | S$180,003.57 |
| HAO DA PTE LTD | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | 2025-11-03 | S$1 |
| BENG SOON MACHINERY SERVICES (SINGAPORE) PTE LTD | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | 2025-11-03 | S$1 |
| BENG HENG ENGINEERING PTE LTD | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | 2025-11-03 | S$1 |
| KTC CIVIL ENGINEERING & CONSTRUCTION PTE LTD | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | 2025-11-03 | S$1 |
| HWA AIK ENGINEERING PTE. LTD. | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | 2025-11-03 | S$1 |
| PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | 2025-11-03 | S$1 |
| RECLAIMS ENTERPRISE PTE. LTD. | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | 2025-11-03 | S$1 |
| HI-TACT SOLUTIONS & TRADING PTE. LTD. | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | 2025-11-03 | S$1 |
| YONGSHENG E & C PTE. LTD. | PREQUALIFICATION OF CONTRACTORS FOR LISTING ON JTC'S PANEL OF DEMOLITION CONTRACTORS FOR A PERIOD OF 3 + 2 YEARS | 2025-11-03 | S$1 |
| QXY RESOURCES PTE. LTD. | Outstanding Works and Defects Rectification at CleanTech Three, CleanTech Loop | 2025-10-28 | S$3,879,000 |
| MEINHARDT (SINGAPORE) PTE LTD | ACCREDITED CHECKING ORGANISATION (ACO) AND SPECIALIST ACCREDITED CHECKERS (GEOTECHNICAL) [AC(GEO)] PROFESSIONAL SERVICES FOR PROPOSED RECLAMATION AT NORTHERN TUAS BASIN | 2025-10-27 | S$1,180,500 |
| GLOBAL SINOTRUST PTE. LTD. | INSTRUMENTATION AND MONITORING WORK FOR PROPOSED ROADS, DRAINS AND SEWERS AT LOYANG WAY AND LOYANG HEIGHTS | 2025-10-27 | S$82,687 |
| FREIGHT LINKS EXPRESS ARCHIVERS PTE LTD | PROVISION OF STORAGE AND RECORDS MANAGEMENT SERVICES FOR 3 CALENDAR YEARS | 2025-10-13 | S$221,529.5 |
| ENVIRONMENTAL RESOURCES MANAGEMENT (S) PTE LTD | Consultancy Studies of Net Zero Emission Zones, JTC's Carbon Emission Profile and Decarbonization Roadmap | 2025-10-07 | S$490,813 |
| PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | PROPOSED DEMOLITION OF EXISTING FACTORY BUILDINGS AND ANCILLARY STRUCTURES AT DEFU LANE AND KALLANG WAY (GROUP 14) | 2025-10-02 | S$2,989,000 |
| R.J. CROCKER CONSULTANTS PTE. LTD. | 2+2 YEARS TERM CONTRACT FOR PROVISION OF WORKPLACE SAFETY AND HEALTH PROFESSIONALS | 2025-10-01 | S$26,798 |
| ENG LAM CONTRACTORS CO (PTE) LTD | Construction of Infrastructure Works at Cleantech Loop (Phase 2A) | 2025-10-01 | S$22,638,000 |
| GREENSAFE INTERNATIONAL PTE. LTD. | 2+2 YEARS TERM CONTRACT FOR PROVISION OF WORKPLACE SAFETY AND HEALTH PROFESSIONALS | 2025-10-01 | S$21,100 |
| SHINGDA CONSTRUCTION PTE. LTD. | Proposed NEWater Pipe Diversion Works at Ang Mo Kio Industrial Park 2 | 2025-09-19 | S$5,235,265 |
| FLEMINGS SAFETY PTE. LTD. | 2 YEAR TERM CONTRACT FOR THE SUPPLY OF PERSONNEL PROTECTIVE EQUIPMENT (PPE) TO JTC STAFF | 2025-09-10 | S$1 |
| HELM MARINE (SINGAPORE) PTE. LTD. | APPOINTMENT OF CONTRACTOR FOR THE MAINTENANCE OF NAVIGATIONAL AIDS AT TUAS BAY FOR TWO (2) YEARS | 2025-09-06 | S$223,632 |
| HWA AIK ENGINEERING PTE. LTD. | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Link Road, Senoko Drive & Senoko Loop (Group 12) | 2025-09-02 | S$2,120,000 |
| KLERRA PTE. LTD. | Challenge Statement - Data-led Mixed Use Waste Handling | 2025-08-29 | S$432,383 |
| ENVIRONMENTAL RESOURCES MANAGEMENT (S) PTE LTD | ENGAGEMENT OF CONSULTANCY SERVICES TO CARRY OUT RISK ASSESSMENT FOR DATA CENTRE SITING ON JURONG ISLAND | 2025-08-28 | S$168,000 |
| ECAS CONSULTANTS PTE. LTD. | Accredited Checking Services for Roads, Drains and Sewer Works at Loyang Way | 2025-08-15 | S$211,000 |
| LEAP INTEGRATED PTE. LTD. | Proposed upscaling works for ACMV and Electrical System at JTC Cleantech 3 @ CleanTech Park | 2025-08-12 | S$5,746,816 |
| BENG SOON MACHINERY SERVICES (SINGAPORE) PTE LTD | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Jalan Ahmad Ibrahim, Tanjong Penjuru and Defu Industrial Park (Group 13) | 2025-08-11 | S$4,223,000 |
| ARUP SINGAPORE PRIVATE LIMITED | Multi-Disciplinary Consultancy Services for Feasibility Study for Solar Canopies Deployment | 2025-08-01 | S$3,880,000 |
| NEO & GOH CONSTRUCTION PTE LTD | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Defu Industrial Park (Batch 3) | 2025-07-04 | S$2,760,000 |
| QXY RESOURCES PTE. LTD. | DESIGN & BUILD FOR REVAMP OF THE MEETING POINT AT LAUNCHPAD AT ONE-NORTH | 2025-07-04 | S$1,188,000 |
| PENTA-OCEAN CONSTRUCTION COMPANY LIMITED | PROPOSED RECLAMATION AT NORTHERN TUAS BASIN | 2025-06-30 | S$299,500,000 |
| ACEPLP.COM PTE LTD | ENGAGEMENT OF SERVICES FOR 2D TO 3D MODEL CONSTRUCTION PROJECT | 2025-06-30 | S$514,510 |
| BIMAGE CONSULTING PTE. LTD. | ENGAGEMENT OF SERVICES FOR 2D TO 3D MODEL CONSTRUCTION PROJECT | 2025-06-30 | S$546,000 |
| KPMG SERVICES PTE. LTD. | Provision of Application Management Services for Finance, Projects and Procurement (SAP) and Related Applications for JTC Corporation | 2025-06-17 | S$2,999,673 |
| GEONAMICS (S) PTE LTD | Soil Investigation and Survey Works at West Jurong Channel | 2025-06-06 | S$1,676,619 |
| BDO CONSULTANTS PTE. LTD. | PROVISION OF SUSTAINABILITY REPORTING CONSULTANCY SERVICES FOR JTC CORPORATION | 2025-06-04 | S$48,000 |
| QXY RESOURCES PTE. LTD. | Improvement Works to High Rise Multi-User Industrial Complex (DIC) at 2 Defu South Street 1 | 2025-05-08 | S$4,753,000 |
| JANGHO CURTAIN WALL SINGAPORE PTE. LTD. | Proposed Facade Recladding to Block 7 (Helios) of Biopolis on Lot 04932W Mukim 3 at North Buona Vista Drive (Queenstown Planning Area) | 2025-04-29 | S$24,062,876 |
| ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | Instrumentation and Monitoring Works for Slopes 2, 4, 6 and 7 at Jurong Hill | 2025-04-17 | S$74,640 |
| AIK SAN CONSTRUCTION PTE LTD | REPLACEMENT OF WATERPROOFING SYSTEM IN REVENUE HOUSE AND THE TREASURY | 2025-04-02 | S$5,032,000 |
| NDI AUTOMATION PTE. LTD. | Provision of Specialist Consultancy Services for Proposed Electronic Overhead Travelling Cranes at JTC Logistics Hub @ Gul | 2025-04-02 | S$247,500 |
| WOODLANDS TRANSPORT SERVICE PTE LTD | Provision of Shuttle Bus Services at Jurong Island for 2 Years | 2025-03-28 | S$1,433,280 |
| TONG TAR TRANSPORT SERVICE PTE LTD | Provision of Shuttle Bus Services at Jurong Island for 2 Years | 2025-03-28 | S$2,832,000 |
| D' PERCEPTION SINGAPORE PTE. LTD. | Interior Fit-out Works to Level 21 at the JTC Summit Office Building | 2025-03-25 | S$2,153,184.43 |
| QBE INSURANCE (SINGAPORE) PTE. LTD. | PLACEMENT OF INSURANCE POLICIES FOR JTC's CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS WITH OPTION TO EXTEND FOR 1 YEAR | 2025-03-21 | S$1 |
| SOMPO INSURANCE SINGAPORE PTE. LTD. | PLACEMENT OF INSURANCE POLICIES FOR JTC's CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS WITH OPTION TO EXTEND FOR 1 YEAR | 2025-03-21 | S$1 |
| MS FIRST CAPITAL INSURANCE LIMITED | PLACEMENT OF INSURANCE POLICIES FOR JTC's CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS WITH OPTION TO EXTEND FOR 1 YEAR | 2025-03-21 | S$1 |
| CHUBB INSURANCE SINGAPORE LIMITED | PLACEMENT OF INSURANCE POLICIES FOR JTC's CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS WITH OPTION TO EXTEND FOR 1 YEAR | 2025-03-21 | S$1 |
| INDIA INTERNATIONAL INSURANCE PTE LTD | PLACEMENT OF INSURANCE POLICIES FOR JTC's CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS WITH OPTION TO EXTEND FOR 1 YEAR | 2025-03-21 | S$1 |
| LIBERTY PTE. LIMITED | PLACEMENT OF INSURANCE POLICIES FOR JTC's CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS WITH OPTION TO EXTEND FOR 1 YEAR | 2025-03-21 | S$1 |
| BUREAU VERITAS BUILDINGS & INFRASTRUCTURE PTE. LTD. | 2+1 YEAR TERM CONTRACT FOR PROVISION OF RESIDENT SITE SUPERVISORS FOR JTC'S BUILDING AND INFRASTRUCTURE PROJECTS (YEAR 2025 to 2027) | 2025-03-14 | S$30,300 |
| AIS-HILL PTE. LTD. | 2+1+1 Year Term Contract for Provision of Project Managers for Management of Various Infrastructure and Building Projects | 2025-03-13 | S$4 |
| CARATS&CO PTE. LTD. | APPOINTMENT OF OPERATOR TO DESIGN, SUPPLY, INSTALL AND MANAGE DIGITAL DIRECTORIES AND SIGNAGE DISPLAYS FOR A PERIOD OF 3 YEARS | 2025-03-05 | S$202,680 |
| HPC BUILDERS PTE. LTD. | Design Development and Build for Additions & Alterations to Existing 4-Storey Multi-User Cleanroom Industrial Development with Ancillary Facilities and Demolition & Construction of 3-Storey Central Utility Building for 11 Tampines Industrial Crescent | 2025-02-25 | S$188,800,000 |
| EVVO LABS PTE. LTD. | Provision of Security Rating Services Subscription | 2025-02-11 | S$22,632 |
| VIVATA PTE. LTD. | Provision of Multi-Disciplinary Consultancy Services for Improvement Works at JTC Logistics Hub (JLH), Kranji Green (KG) and Timmac | 2025-01-08 | S$13.56 |
| AEQON TJ PTE. LTD. | Provision of Jurong Island (JI) CCTV Enhancement for 3 Years | 2024-12-30 | S$2,062,000 |
| CTC GLOBAL PTE. LTD. | Provision of MongoDB Software Licenses Subscription Renewal and Professional Services for JTC Datahub | 2024-12-30 | S$313,404.12 |
| SURBANA JURONG CONSULTANTS PTE. LTD. | Multi-Disciplinary Consultancy Services for the Shoreline Stabilisation at Tuas Curve Profile | 2024-12-27 | S$8,737,701 |
| UTRACO PTE. LTD. | Permanent Slope Repair and Strengthening Works to Slope 2, 4, 6 and 7 and Ancillary Works at Jurong Hill. | 2024-12-26 | S$5,988,800 |
| SCAL ACADEMY PTE. LTD. | 3 YEAR TERM CONTRACT FOR THE DESIGN, BUILD AND MAINTAIN THE CONSTRUCTION SAFETY SCHOOL AT JTC SPACE@GUL | 2024-12-12 | S$1 |
| ENTIIS PTE. LTD. | PROVISION OF PRIVILEGE ACTIVITY RECORDING SYSTEM (OBSERVEIT) SOFTWARE LICENSING SUPPORT AND MAINTENANCE FOR A PERIOD OF 1 YEAR | 2024-12-05 | S$72,000 |
| DP ARCHITECTS PTE LTD. | Provision Of Multi-Disciplinary Consultancy Services for Proposed Development of 66kV Substation at Ang Mo Kio | 2024-11-29 | S$16.92 |
| PRICEWATERHOUSECOOPERS RISK SERVICES PTE. LTD. | CONSULTANCY TO REVIEW AND PROPOSE ENHANCEMENTS TO JTC CORPORATION'S BUSINESS RESILIENCE GROUP | 2024-11-26 | S$140,160 |
| PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | Proposed Demolition of Existing Factory Building and Ancillary Structures at Gul Circle, Kranji Way, Sungei Kadut and Penjuru Road | 2024-11-22 | S$5,594,000 |
| K.C. DAT (SINGAPORE) PRIVATE LIMITED | Tender for Appointment of Contractor for the Provision of Packing, Moving and Storage Services for Three (3) Office Buildings at Orchard Road | 2024-11-20 | S$630,242 |
| SUNRAY WOODCRAFT CONSTRUCTION PTE LTD | Proposed Addition and Alteration Works and Restoration Works to Two (2) Conservation Buildings and One (1) Three-Storey Building at Orchard Road. | 2024-11-07 | S$142,388,889 |
| S K E ENGINEERING (S) PTE LTD | Repair and Reinstatement Works to Fire Affected Bus-Ducts at Level 1 and 2 of Block 3023 UbiPlex 1, Ubi Road 3 | 2024-11-05 | S$155,500 |
| BAN CHON CORPORATION & TRADING PTE LTD | PROPOSED ROAD WIDENING AND SEWER & DRAIN UPGRADING WORKS AT KOLAM AYER INDUSTRIAL ESTATE | 2024-11-05 | S$24,981,216 |
| WILSON PARKING (SINGAPORE) PTE. LTD. | IMPLEMENTATION OF SEASON SALE SYSTEM FOR JTC'S GAZETTED CARPARKS FOR A PERIOD OF 3+1+1 YEARS | 2024-11-04 | S$218,000 |
| TOKIO MARINE INSURANCE SINGAPORE LTD. | PROVISION OF WORK INJURY COMPENSATION, GROUP PERSONAL ACCIDENT AND GROUP TERM LIFE INSURANCE PROGRAMME FOR 2 YEARS | 2024-10-28 | S$1 |
| THE GREAT EASTERN LIFE ASSURANCE COMPANY LIMITED | PROVISION OF WORK INJURY COMPENSATION, GROUP PERSONAL ACCIDENT AND GROUP TERM LIFE INSURANCE PROGRAMME FOR 2 YEARS | 2024-10-28 | S$1 |
| ZURICH INSURANCE COMPANY LTD (SINGAPORE BRANCH) | PROVISION OF WORK INJURY COMPENSATION, GROUP PERSONAL ACCIDENT AND GROUP TERM LIFE INSURANCE PROGRAMME FOR 2 YEARS | 2024-10-28 | S$1 |
| CHARTWORTH ENTERPRISE SINGAPORE PTE. LTD. | CONSTRUCTION OF BACKUP SEWER CROSSINGS AT MERANTI CRESCENT, JURONG ISLAND | 2024-10-25 | S$6,867,538 |
| ECAS CONSULTANTS PTE. LTD. | ACCREDITED CHECKING ORGANISATION (ACO) AND SPECIALIST ACCREDITED CHECKING (GEOTECHNICAL) SERVICES FOR PROPOSED COASTAL DEVELOPMENT | 2024-10-25 | S$460,050 |
| RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | INSTRUMENT MONITORING WORKS FOR PROPOSED COASTAL DEVELOPMENT | 2024-10-24 | S$2,170,000 |
| CHBC INTEGRATED BUILDERS PTE. LTD. | PROVISION OF RESOURCES TO CARRY OUT INSPECTION TO PREMISES FOR A PERIOD OF 3 YEARS | 2024-10-21 | S$1,297,008 |
| WSH EXPERTS PTE. LTD. | PROVISION OF RESOURCES TO CARRY OUT INSPECTION TO PREMISES FOR A PERIOD OF 3 YEARS | 2024-10-21 | S$1,828,800 |
| PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | Proposed Demolition of Existing Factory Building and Ancillary Structures at Tuas Basin Close, Tuas Crescent, Tuas Basin Link, Tuas Basin Lane, Tuas Road & Tuas South Avenue 5 | 2024-10-18 | S$2,950,000 |
| SERVICE CONNECTIONS HR CONSULTANCY PTE. LTD. | 1 + 1 YEAR TERM CONTRACT FOR PROVISION OF ONE ADMINISTRATIVE EXECUTIVE (AE) | 2024-10-15 | S$37,884 |
| VISUALMEDIAWORKS PTE LTD | PROVISION OF VIDEO PRODUCTION AND 3D ANIMATION SERVICES FOR JURONG INNOVATION DISTRICT | 2024-10-14 | S$175,000 |
| WSH EXPERTS PTE. LTD. | Provision of Site Supervision Staff for JTC Reclamation and Marine Related Projects | 2024-10-11 | S$48,240 |
| ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | Instrumentation and Monitoring Works for Bulim Phase 2 Infrastructure | 2024-10-01 | S$747,781.97 |
| CPG CONSULTANTS PTE LTD | 3-Year TC for Provision of Consultancy Services for Traffic Impact Assessment (TIA) Studies for JTC's Developments and Industrial Estates | 2024-09-26 | S$1 |
| SYSTRA MVA SINGAPORE PTE. LTD. | 3-Year TC for Provision of Consultancy Services for Traffic Impact Assessment (TIA) Studies for JTC's Developments and Industrial Estates | 2024-09-26 | S$1 |
| KIM YEW INTEGRATED PTE. LTD. | APPOINTMENT OF INTEGRATED BUILDING CONTRACTOR (IBC) TO GOVERNMENT BUILDINGS ALONG ORCHARD ROAD FOR A PERIOD OF 3 YEARS | 2024-09-09 | S$7,369,566 |
| STARHUB LTD. | INVITATION TO TENDER FOR OPEN DIGITAL PLATFORM (ODP) INFRASTRUCTURE | 2024-09-06 | S$2,423,504 |
| BIMFINITY INTERNATIONAL PTE. LTD. | 1-Year Term Contract for Provision of One (1) Civil and Structural Engineer and One (1) Mechanical BIM Engineer/Modeller for JTC Projects | 2024-09-03 | S$87,600 |
| WSH EXPERTS PTE. LTD. | 1-Year Term Contract for Provision of One (1) Civil and Structural Engineer and One (1) Mechanical BIM Engineer/Modeller for JTC Projects | 2024-09-03 | S$110,040 |
| CBRE PTE. LTD. | Engagement of Consultancy Services for International (Industrial Land) Benchmarking Study | 2024-08-30 | S$1 |
| MS FIRST CAPITAL INSURANCE LIMITED | PLACEMENT OF INSURANCE POLICIES FOR THE OPERATION OF JURONG ROCK CAVERNS FOR A PERIOD OF 18 MONTHS WITH AN OPTION TO EXTEND FOR ANOTHER 18 MONTHS | 2024-08-29 | S$1 |
| KPMG SERVICES PTE. LTD. | Renewal Of Incident Response Retainer Services | 2024-08-28 | S$112,500 |
| TRENDBUILD CONTRACTS PTE. LTD. | Supply and installation of Fitting Out, Furnishing and Loose Furniture at Punggol Digital District | 2024-08-28 | S$1,395,800 |
| INTERLOCK SECURITY AND INVESTIGATION SERVICES PTE LTD | JTC Innovation Challenge 2023: Challenge Statement 3 -Solutions to inspect and effectively clear choked drain pipes in buildings | 2024-08-26 | S$250,000 |
| OTN BUILDING COST CONSULTANTS PTE. LTD. | 2+1 YEAR TERM QUANTITY SURVEYING CONSULTANCY SERVICES FOR PROPOSED DEMOLITION OF EXISTING JTC FACTORY BUILDINGS AND ANCILLARY STRUCTURES | 2024-08-20 | S$5 |
| DBS BANK LTD. | Consultancy Service to Review and Make Recommendations on the Optimisation of JTC's Property Portfolio | 2024-08-14 | S$1 |
| CBRE GWS PTE. LTD. | APPOINTMENT OF FMC FOR FACILITIES MAINTENANCE OF CSC FOR A PERIOD OF 3 YEARS | 2024-08-13 | S$7,424,002.92 |
| DP ARCHITECTS PTE LTD. | Multi-Disciplinary Consultancy Services for Building Study and Analysis of 10 View Road and Surrounding Area | 2024-08-08 | S$2,954,361 |
| VIGCON CONSTRUCTION PTE LTD | PROPOSED ADDITION & ALTERATION WORKS TO EXISTING 8 STOREY FLATTED FACTORY (WITH 1 LEVEL BASEMENT CARPARK) AT AYER RAJAH CRESCENT/ AYER RAJAH AVENUE ON LOT 5364N MK03 (QUEENSTOWN PLANNING AREA) | 2024-08-01 | S$27,375,000 |
| WSP CONSULTANCY PTE. LTD. | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | 2024-07-30 | S$4 |
| AIS-HILL PTE. LTD. | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | 2024-07-30 | S$2 |
| CPG CONSULTANTS PTE LTD | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | 2024-07-30 | S$4 |
| LSW CONSULTING ENGINEERS PTE. LTD. | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | 2024-07-30 | S$4 |
| JIB SPECIALIST CONSULTANTS PTE. LTD. | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | 2024-07-30 | S$2 |
| NCS PTE. LTD. | Provision of Maintenance Contract for IT Equipment | 2024-07-29 | S$2,206,796 |
| KTC CIVIL ENGINEERING & CONSTRUCTION PTE LTD | Construction of Infrastructure Works at Bulim (Phase 2) | 2024-07-22 | S$617,768,000 |
| WSH EXPERTS PTE. LTD. | Provision Of Professionals and Executives for JTC New Estates Developments | 2024-07-16 | S$2 |
| DELOITTE SINGAPORE ASSURANCE PTE. LTD. | PROVISION OF INTERNAL AUDIT SERVICES FOR 2 YEARS | 2024-07-05 | S$888,000 |
| SURBANA TECHNOLOGIES PTE. LTD. | Provision of Smart Building Solutions Study and Advisory Services | 2024-07-01 | S$41,400 |
| BAN CHON CORPORATION & TRADING PTE LTD | Sewer Upgrading Along Tuas View Crescent | 2024-06-20 | S$7,382,680 |
| CTM FACILITIES MANAGEMENT PTE. LTD. | APPOINTMENT OF FACILITY MANAGEMENT COMPANY FOR FACILITIES MAINTENANCE OF JTC NANOSPACE @ TAMPINES FOR A PERIOD OF 2 YEARS | 2024-06-14 | S$5,992,532.99 |
| HUATIONG CONTRACTOR PTE LTD | Design and Construction of Cul-De-Sac Road and Associated Infrastructure Works at Pasir Ris Wafer Fab Park | 2024-06-14 | S$9,678,800 |
| ENTIIS PTE. LTD. | SOFTWARE LICENSE MAINTENANCE RENEWAL OF CA WORKLOAD AUTOMATION | 2024-06-10 | S$483,400 |
| NCS PTE. LTD. | Renewal of eG Monitoring Software and Maintenance Licensing for 5 years | 2024-05-31 | S$269,340 |
| AEDGE HOLDINGS PTE. LTD. | 2-Year Term Contract for the Provision of Shuttle Bus Services at Seletar Aerospace Park and CleanTech Park | 2024-05-31 | S$1,223,376 |
| LEISURE FRONTIER (S) PTE. LTD. | 2-YEAR TERM CONTRACT FOR THE PROVISION OF SHUTTLE BUS SERVICE AT AIRPORT LOGISTICS PARK OF SINGAPORE | 2024-05-31 | S$228,000 |
| KPMG SERVICES PTE. LTD. | PROFESSIONAL SERVICES FOR THE IMPLEMENTATION AND SYSTEM OPERATION SUPPORT SERVICES OF CUSTOMER RELATIONSHIP MANAGEMENT (CRM) | 2024-05-23 | S$2,933,005.41 |
| SOIL INVESTIGATION PTE. LIMITED | 2-Year Term Contract for Geophysical and Survey Works for JTC Estates | 2024-05-15 | S$1 |
| CAST LABORATORIES PTE LTD | 2-Year Term Contract for Soil Investigation Works Within JTC Estate | 2024-05-15 | S$1 |
| RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | 2-Year Term Contract for Soil Investigation Works Within JTC Estate | 2024-05-15 | S$1 |
| RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | 2-Year Term Contract for Geophysical and Survey Works for JTC Estates | 2024-05-15 | S$1 |
| DP ARCHITECTS PTE LTD. | Provision of Multi-Disciplinary Consultancy Services for Proposed JTC Space @ AMK 2 | 2024-04-30 | S$4.41 |
| CSK LANDSCAPE SERVICES (S) PTE. LTD. | Provision of certified arborists and manpower to support the Master Landscape Services Contract for JTC Parks and Gardens and other landscape implementation projects. | 2024-04-29 | S$947,750 |
| ST ENGINEERING MISSION SOFTWARE & SERVICES PTE. LTD. | JTC Innovation Challenge 2023: Challenge Statement 1 - Improving security surveillance, situational awareness and incident response in JTC's industrial estates | 2024-04-26 | S$248,000 |
| AECOM SINGAPORE PTE. LTD. | 24 Months Term Contract for Provision of Environmental Advisory Services (Year 2024 - Year 2026) | 2024-04-18 | S$722,100 |
| TURNER & TOWNSEND PTE. LIMITED | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | 2024-04-18 | S$12 |
| OTN BUILDING COST CONSULTANTS PTE. LTD. | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | 2024-04-18 | S$5 |
| AECOM COST CONSULTING AND PROJECT MANAGEMENT (SINGAPORE) PTE. LTD. | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | 2024-04-18 | S$10 |
| ASIA INFRASTRUCTURE SOLUTIONS SINGAPORE PTE. LTD. | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | 2024-04-18 | S$10 |
| DK OUTSOURCE PTE. LTD. | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | 2024-04-18 | S$2 |
| PQS CONSULTANTS PTE. LTD. | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | 2024-04-18 | S$4 |
| CHARTWORTH ENTERPRISE SINGAPORE PTE. LTD. | Proposed Infrastructure Works at Ayer Merbau Road, Jurong Island | 2024-04-09 | S$15,929,438 |
| CTM FACILITIES MANAGEMENT PTE. LTD. | APPOINTMENT OF FMC FOR FACILITIES MAINTENANCE OF JURONG ISLAND PROPERTIES AND ESTATES FOR A PERIOD OF 3 YEARS | 2024-04-03 | S$20,545,099.72 |
| MAO SHENG QUANJI CONSTRUCTION PTE LTD | Master Landscape Services Contract for JTC Properties and Estates | 2024-04-03 | S$5,866,467 |
| VIGCON CONSTRUCTION PTE LTD | Proposed Regularisation of Fire Safety Works to Existing Fusionopolis One Building on Lot 04044T MK 03 at 1/3 Fusionopolis Way | 2024-04-03 | S$10,556,500 |
| WOODLANDS TRANSPORT SERVICE PTE LTD | 2-Year Term Contract for the Provision of Shuttle Bus Services at International Business Park | 2024-03-27 | S$441,600 |
| RECLAIMS ENTERPRISE PTE. LTD. | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Defu Industrial Park (Batch 2) | 2024-03-22 | S$1,600,000 |
| FONG CONSULT PTE. LTD. | PERIODIC STRUCTURAL INSPECTION WORKS AT JTC INDUSTRIAL PROPERTIES IN EAST DIVISION | 2024-03-22 | S$49,100 |
| XLT SYSTEMS PTE. LTD. | ENGAGEMENT OF SERVICES FOR AUDIO-VISUAL AND VIDEO CONFERENCING SYSTEM ENHANCEMENT WORKS FOR MINISTRY OF COMMUNICATIONS AND INFORMATION (MCI) AT OLD HILL STREET POLICE STATION LEVEL 1 COLLABORATION ROOMS AND BASEMENT 2 SITUATION OFFICE | 2024-03-21 | S$205,580 |
| SHENGJIE ENGINEERING PTE. LTD. | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Defu Lane and Attap Valley | 2024-03-20 | S$3,400,000 |
| BIMAGE CONSULTING PTE. LTD. | IFC VIEWER TRAINING FOR JTC EPIC PROCESSING AND COMMENTING OFFICERS | 2024-02-29 | S$39,600 |
| NCS PTE. LTD. | Engagement of Robotics Food Delivery Services | 2024-02-23 | S$132,679 |
| KJS CONSTRUCTION PTE LTD | Proposed Redecoration and Refurbishment Works to 55 Ayer Rajah Crescent | 2024-02-23 | S$4,940,827 |
| INTERLOCK SECURITY AND INVESTIGATION SERVICES PTE LTD | Engagement of Robotics Food Delivery Services | 2024-02-23 | S$32,000 |
| HWA AIK ENGINEERING PTE. LTD. | Proposed Demolition Works at 241 Jalan Ahmad Ibrahim | 2024-02-15 | S$298,000 |
| STEEL GIANT ENGINEERING PTE. LTD. | DESIGN & BUILD SHELTERED LINKWAY BETWEEN CLEANTECH TWO BLOCKS A & B @ CLEANTECH PARK | 2024-02-08 | S$325,888.88 |
| CPC CONSTRUCTION PTE. LTD. | Proposed Drain and Sewer Upgrading at Woodlands Road and Woodland Industrial Park D Street 2 | 2024-02-07 | S$20,500,888 |
| LANDSCAPE ENGINEERING PTE LTD | 2+1 Year Term Contract for Civil Engineering Works with Design and Authorities' Submission | 2024-02-06 | S$3 |
| JONES LANG LASALLE PROPERTY CONSULTANTS PTE LTD | APPOINTMENT OF FACILITY MANAGEMENT COMPANY FOR FACILITIES MAINTENANCE OF WEST DEPARTMENT 2 PROPERTIES AND ESTATE FOR A PERIOD OF 3 YEARS | 2024-02-05 | S$48,343,616.3 |
| C&W SERVICES (S) PTE. LTD. | APPOINTMENT OF A PANEL OF MARKETING AGENTS FOR JTC INDUSTRIAL AND COMMERCIAL SPACES | 2024-01-31 | S$1 |
| CBRE PTE. LTD. | APPOINTMENT OF A PANEL OF MARKETING AGENTS FOR JTC INDUSTRIAL AND COMMERCIAL SPACES | 2024-01-31 | S$2 |
| EDMUND TIE & COMPANY (SEA) PTE. LTD. | APPOINTMENT OF A PANEL OF MARKETING AGENTS FOR JTC INDUSTRIAL AND COMMERCIAL SPACES | 2024-01-31 | S$1 |
| ENGIE PROPERTY SERVICES PTE. LTD. | APPOINTMENT OF A PANEL OF MARKETING AGENTS FOR JTC INDUSTRIAL AND COMMERCIAL SPACES | 2024-01-31 | S$1 |
| HUTTONS ASIA PTE. LTD. | APPOINTMENT OF A PANEL OF MARKETING AGENTS FOR JTC INDUSTRIAL AND COMMERCIAL SPACES | 2024-01-31 | S$1 |
| CARATS&CO PTE. LTD. | NOMINATED SUB-CONTRACT FOR SIGNAGE WORKS AT INTEGRATED BUSINESS PARK DEVELOPMENT ON CC1, CC2 AND CC3 AT PUNGGOL DIGITAL DISTRICT | 2024-01-22 | S$2,589,555 |
| HPC BUILDERS PTE. LTD. | Construction Of 66KV Substation At Loyang Drive North | 2023-12-22 | S$29,520,000 |
| AEQON TJ PTE. LTD. | COMPREHENSIVE MAINTENANCE FOR NON-PROPRIETARY SYSTEMS AT JURONG ISLAND CHECKPOINT AND PULAU DAMAR LAUT CHECKPOINT FOR 24 MONTHS | 2023-12-21 | S$519,384 |
| NEO & GOH CONSTRUCTION PTE LTD | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Defu Estate, Kallang Way and Wilton Close | 2023-12-20 | S$3,168,000 |
| BENG SOON MACHINERY SERVICES (SINGAPORE) PTE LTD | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Defu Industrial Park (Batch 1) | 2023-12-19 | S$2,618,800 |
| ELEMENT GEOTECHNICAL TESTING (S) PTE. LTD. | Provision of Geotechnical Works Instrumentation and Monitoring Services for Drain and Sewer Upgrading at Woodlands Road and Woodlands Industrial Park D Street 2 | 2023-12-19 | S$106,320 |
| CPG CONSULTANTS PTE LTD | Provision of Civil and Structural Engineering Consultancy Services for Road Widening Works at AMK Industrial Park 2 | 2023-12-18 | S$235,431.48 |
| JONES LANG LASALLE PROPERTY CONSULTANTS PTE LTD | Appointment of Facility Management Company for Facilities Maintenance of East Department 1 Properties for a Period of 3 Years | 2023-12-11 | S$49,999,746.15 |
| GIMI INTERNATIONAL PTE. LTD. | PROVISION OF MANPOWER FOR VEGETATION CLEARING SERVICES TO FACILITATE LAND SURVEYING WORKS FOR JTC CORPORATION | 2023-12-06 | S$151,200 |
| JINYUE ALUMINIUM ENGINEERING (SINGAPORE) PTE. LTD. | Proposed Facade Repair and Rectification ("R&R") to Block 1 to 6 of Biopolis on Lot 04932W, 04929W & 04931M Mukim 3 at North Buona Vista Drive (Queenstown Planning Area) | 2023-12-04 | S$5,160,729 |
| LANDSCAPE ENGINEERING PTE LTD | Jurong Eco Garden Rejuvenation Works | 2023-11-29 | S$6,007,497 |
| WINSYS TECHNOLOGY PTE LTD | Design, Supply and Installation of BMS Interface Modules for BMS Integration to the Open Digital Platform(ODP) at JTC Properties | 2023-11-23 | S$152,259 |
| SURBANA JURONG CONSULTANTS PTE. LTD. | 2-Year Term Contract for Cadastral Surveys | 2023-11-21 | S$2 |
| UNITED SURVEYORS PTE LTD | 2-Year Term Contract for Cadastral Surveys | 2023-11-21 | S$1 |
| APBA TG HUMAN RESOURCE PTE. LTD. | Provision of a Panel of Resource Agencies to Supply IT Contract Resources for a Period of 3 Years | 2023-11-17 | S$1 |
| RMA CONSULTANTS PTE LTD | Provision of a Panel of Resource Agencies to Supply IT Contract Resources for a Period of 3 Years | 2023-11-17 | S$1 |
| OPTIMUM SOLUTIONS (SINGAPORE) PTE LTD | Provision of a Panel of Resource Agencies to Supply IT Contract Resources for a Period of 3 Years | 2023-11-17 | S$1 |
| ITCAN PTE. LIMITED | Provision of a Panel of Resource Agencies to Supply IT Contract Resources for a Period of 3 Years | 2023-11-17 | S$1 |
| BGC GROUP PTE. LTD. | Provision of a Panel of Resource Agencies to Supply IT Contract Resources for a Period of 3 Years | 2023-11-17 | S$1 |
| RIDIK PTE. LTD. | Provision of a Panel of Resource Agencies to Supply IT Contract Resources for a Period of 3 Years | 2023-11-17 | S$1 |
| KELLER FOUNDATIONS (S E ASIA) PTE. LTD. | Design, Development and Build for Proposed Ground Improvement Works at Ayer Merbau Road, Jurong Island. | 2023-11-10 | S$5,788,000 |
| H3 ZOOM PTE. LTD. | 1+1 Years Term Contract for Provision of Drone Service to Support Construction Site Visual Inspections (2023) | 2023-11-02 | S$129,600 |
| ESRI SINGAPORE PTE. LTD. | ENGAGEMENT OF APPLICATION MANAGED SERVICES (AMS) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) PLATFORMS IN JTC | 2023-10-31 | S$4,163,000 |
| C&W SERVICES (S) PTE. LTD. | Design, Development and Installation of New Chilled Water Plant Equipment at JTC Chemicals Hub | 2023-10-30 | S$977,700 |
| TSMP LAW CORPORATION | Appointment of Law Firm(s) as Strategic Legal Partner for Advisory and Dispute Resolution Services for a period of two (2) years | 2023-10-25 | S$1 |
| ACE PERIPHERALS PTE. LTD. | 360 REALITY CAPTURE SAAS SOLUTION FOR 2 YEARS | 2023-10-20 | S$1,968,817.47 |
| 3S COMMUNICATION PTE. LTD. | Supply, deliver, installation and commissioning of Video Conferencing and Audio-Visual equipment to boardroom, map room, lecture room and theatrette at JTC Summit, and training room T1C and theatrette at Jurong Town Hall | 2023-10-03 | S$195,525 |
| SURBANA JURONG INFRASTRUCTURE PTE. LTD. | SPECIALIST CONSULTANCY SERVICES FOR FEASIBILITY STUDY OF UNDERGROUND CAVERNS DEVELOPMENT AT GALI BATU | 2023-10-03 | S$2,355,000 |
| C&W SERVICES (S) PTE. LTD. | PROVISION OF RESOURCES FOR ENGAGEMENT WITH CUSTOMERS TO REGULARISE BREACHES IN JTC PROPERTIES FOR A PERIOD OF 3 YEARS | 2023-09-19 | S$3,080 |
| DELTEQ PTE LTD | PROCUREMENT OF HEWLETT PACKARD ENTERPRISE (HPE) SERVER UPGRADE | 2023-09-19 | S$81,999 |
| FONDA GLOBAL ENGINEERING PTE. LTD. | UPGRADING OF THE CLOSED-CIRCUIT TV SYSTEM FOR THE INLAND REVENUE AUTHORITY OF SINGAPORE | 2023-09-13 | S$349,241 |
| D' PERCEPTION SINGAPORE PTE. LTD. | DESIGN AND BUILD FOR RENOVATION OF NEW OFFICES AT LEVELS 3 AND 6 OF THE JTC SUMMIT | 2023-09-07 | S$1,035,506.34 |
| ENKON INTERNATIONAL CONSULTING ENGINEERS PTE LTD | Provision of Registered Inspector (Mechanical and Electrical) Services for JTC Integrated Business Park Development at Punggol Digital District | 2023-08-28 | S$32,550 |
| DHI WATER & ENVIRONMENT (S) PTE. LTD. | 2 + 2 Years Term Contract For Specialist Consultancy Services for the Environmental Monitoring & Management Plan in Singapore | 2023-08-14 | S$1 |
| CBRE GWS PTE. LTD. | Appointment of Facility Management Company for Facilities Maintenance of East Department 3, Central Department 2 and West Department 1n3 Properties for a Period of 3 Years | 2023-08-12 | S$71,232,263.54 |
| C&W SERVICES (S) PTE. LTD. | Appointment of Facility Management Company for Facilities Maintenance of East Department 3, Central Department 2 and West Department 1n3 Properties for a Period of 3 Years | 2023-08-12 | S$61,543,578.13 |
| HARFORD ENGINEERING PTE LTD | Proposed Enhancement Works at Ayer Rajah Precinct | 2023-08-08 | S$1,080,800 |
| HELM MARINE (SINGAPORE) PTE. LTD. | Management Of JTC Sand Stockpile And Monitoring Of Sand Supply | 2023-08-04 | S$3,180,160 |
| PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Tuas and Defu Lane | 2023-07-26 | S$2,759,800 |
| ABL CONSULTANTS PTE. LTD. | Provision of Multi-Disciplinary Consultancy Services for the Development of Heavy Vehicle Parking at JTC's New Estate | 2023-07-19 | S$482,000 |
| HUATIONG CONTRACTOR PTE LTD | Proposed Infrastructure Works at Loyang Drive (North) | 2023-07-07 | S$18,817,806 |
| HAO DA PTE LTD | Proposed Demolition Works at 6 Pasir Ris Farmway 1 and Substations | 2023-07-07 | S$2,769,555 |
| CHL CONSTRUCTION PTE LTD | A&A Works to Bedok Industrial Park E , Tampines Industrial Park A , Defu Industrial Estate and Kampong Ubi Industrial Estate | 2023-06-30 | S$5,130,836 |
| VIGCON CONSTRUCTION PTE LTD | A&A Works to Bedok Industrial Park E , Tampines Industrial Park A , Defu Industrial Estate and Kampong Ubi Industrial Estate | 2023-06-30 | S$13,543,468 |
| RECLAIMS ENTERPRISE PTE. LTD. | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Genting Lane, Kallang Way and Sungei Kadut | 2023-06-28 | S$1,668,649 |
| STARHUB LTD. | Leasing for WAN Connectivity and Hardware at Jurong Island Data Centre | 2023-06-21 | S$1,780,788.01 |
| DN HYBRID PTE. LTD. | REPAIRS AND REFURBISHMENT WORKS AT VARIOUS JTC INDUSTRIAL ESTATES AND COMPLEXES (GROUP 3) | 2023-06-19 | S$17,574,045 |
| PAL-LINK CONSTRUCTION PTE. LTD. | REPAIRS AND REFURBISHMENT WORKS AT VARIOUS JTC INDUSTRIAL ESTATES AND COMPLEXES (GROUP 3) | 2023-06-19 | S$9,451,948 |
| SHENGJIE ENGINEERING PTE. LTD. | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Sungei Kadut, Defu Lane and Tukang Estate | 2023-06-16 | S$2,200,000 |
| ANDERCO PTE. LTD. | Reinstatement Works to Factory Converted Dormitories (Batch 2) | 2023-06-14 | S$267,600 |
| MUTIARA (FE) PTE. LTD. | Reinstatement Works to Factory Converted Dormitories (Batch 2) | 2023-06-14 | S$11,202 |
| CH2M HILL SINGAPORE PRIVATE LIMITED | Feasibility Study For Siting New Wafer Fab Sites In JTC Industrial Estate On (I) Air Quality & Vibration, (II) Surface Runoff Quality Within Water Catchment Area, And (III) H&S Buffer To Sensitive Receptors | 2023-06-14 | S$665,798 |
| ACEPLP.COM PTE LTD | 2-Year Term Contract for Provision of Integrated Digital Delivery (IDD) Managers for JTC's Building & Infrastructure Projects | 2023-06-12 | S$14,500 |
| SCHINDLER LIFTS (SINGAPORE) PTE. LTD. | PROPOSED LIFT REPLACEMENT / CONVERSION WITH 3 YEARS MAINTENANCE FOR JTC EXISTING BUILDING AT FUSIONOPOLIS 2, CHEMHUB AND OASIS @SAKRA | 2023-06-09 | S$7,272,000 |
| ENVIRONMENTAL RESOURCES MANAGEMENT (S) PTE LTD | Study on Pollution Control of Waterfront Industrial Activities in Developed Countries | 2023-06-01 | S$395,000 |
| HARFORD ENGINEERING PTE LTD | CONSTRUCTION OF UTILITY SPECIFIC DUCTS AT TUAS WESTERN COAST | 2023-05-31 | S$5,428,977 |
| DHI WATER & ENVIRONMENT (S) PTE. LTD. | PROVISION OF CONSULTANCY SERVICES FOR ENVIRONMENTAL MONITORING AND MANAGEMENT PLAN (EMMP) FOR SITE CLEARANCE AND LAND PREPARATION WORKS OF PLOT A2 AT PASIR RIS WAFER FABRICATION PARK | 2023-05-29 | S$278,800 |
| MAXI MORRIE ENGINEERING PTE. LTD. | PROVISION OF TRAFFIC MANAGEMENT SYSTEM AT JURONG ISLAND CHECKPOINT | 2023-05-29 | S$1,739,000 |
| CBRE PTE. LTD. | Appointment of Panel of Valuers for the Provision of Valuation Services for JTC Corporation's Buyback of Industrial Properties for a Period of 3 Years | 2023-05-26 | S$1 |
| SAVILLS VALUATION AND PROFESSIONAL SERVICES (S) PTE. LTD. | Appointment of Panel of Valuers for the Provision of Valuation Services for JTC Corporation's Buyback of Industrial Properties for a Period of 3 Years | 2023-05-26 | S$1 |
| KNIGHT FRANK PTE LTD | Appointment of Panel of Valuers for the Provision of Valuation Services for JTC Corporation's Buyback of Industrial Properties for a Period of 3 Years | 2023-05-26 | S$1 |
| CARATS&CO PTE. LTD. | DESIGN, SUPPLY, INSTALL AND MAINTAIN DIGITAL RETAIL DIRECTORY AND ADVERTISEMENTS DIGITAL PANELS AT FUSIONOPOLIS ONE | 2023-05-26 | S$210,880 |
| TONG SHING CONTRACTORS PRIVATE LIMITED | 1 + 1 YEAR TERM CONTRACT FOR RECTIFICATION WORKS TO EXISTING ROADS FOR HANDING OVER TO LTA | 2023-05-19 | S$2 |
| SWEE BUILDERS PTE LTD | 1 + 1 YEAR TERM CONTRACT FOR RECTIFICATION WORKS TO EXISTING ROADS FOR HANDING OVER TO LTA | 2023-05-19 | S$2 |
| CAST LABORATORIES PTE LTD | PROVISION OF INSTRUMENTATION AND MONITORING WORKS FOR PROPOSED OFF LOADING QUAY AT SERAYA, JURONG ISLAND | 2023-05-18 | S$68,800 |
| TANTRA INCORPORATED PTE. LTD. | APPOINTMENT OF EVENT ORGANISERS FOR RECREATION CENTRES: (I) CONCERTS AND CARNIVALS & (II) SPORTS TOURNAMENTS | 2023-05-09 | S$275,179 |
| KTC CIVIL ENGINEERING & CONSTRUCTION PTE LTD | DESIGN, DEVELOPMENT AND BUILD FOR PROPOSED TREE CLEARANCE AND LAND PREPARATION WORKS OF PLOT A2 AT PASIR RIS WAFER FABRICATION PARK | 2023-05-05 | S$6,312,000 |
| TRENDBUILD CONTRACTS PTE. LTD. | Conversion of Existing Meeting Room to Multimedia Video Conferencing Room on Level 10, The Treasury Building, Singapore 179434 | 2023-05-05 | S$223,815 |
| PDS INTERNATIONAL PTE LTD | 3-YEAR TERM CONTRACT FOR PROCUREMENT OF PERSONAL PROTECTIVE EQUIPMENT (PPE) [SAFETY BOOTS AND SAFETY EYEWEAR] FOR JTC | 2023-04-27 | S$1 |
| FLEMINGS SAFETY PTE. LTD. | 3-YEAR TERM CONTRACT FOR PROCUREMENT OF PERSONAL PROTECTIVE EQUIPMENT (PPE) [SAFETY BOOTS AND SAFETY EYEWEAR] FOR JTC | 2023-04-27 | S$1 |
| CLIMATE ASIA PTE. LTD. | JTC Innovation Challenge 2022: Real time automated optimisation of air-conditioning system | 2023-04-27 | S$250,000 |
| YENG TONG CONSTRUCTION PTE LTD | Removal and Disposal of a Single Buoy Mooring (SBM) System at Sakra, Jurong Island | 2023-04-17 | S$81,000 |
| QXY RESOURCES PTE. LTD. | REPAIR & REFURBISHMENT WORKS AT VARIOUS JTC INDUSTRIAL ESTATES (GROUP 1B) | 2023-04-17 | S$19,470,400 |
| CHIONG CONSTRUCTION PTE. LTD. | REPAIR & REFURBISHMENT WORKS AT VARIOUS JTC INDUSTRIAL ESTATES (GROUP 1B) | 2023-04-17 | S$4,087,885 |
| ANTARA KOH PRIVATE LIMITED | DESIGN AND BUILD OF OFF-LOADING QUAY AT SERAYA, JURONG ISLAND | 2023-04-06 | S$4,307,080 |
| SPTEL PTE. LTD. | PROCUREMENT OF NETWORK CONNECTIVITY FOR INTERNET ACCESS AND DISASTER RECOVERY | 2023-04-06 | S$223,302 |
| SMM PTE. LTD. | 2-YEAR TERM CONTRACT FOR RESIDENT SITE SUPERVISORS FOR JTC'S BUILDING AND INFRASTRUCTURE PROJECTS (YEAR 2023 to 2025) | 2023-03-31 | S$99,400 |
| QBE INSURANCE (SINGAPORE) PTE. LTD. | PLACEMENT OF INSURANCE POLICIES FOR JTC'S CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS | 2023-03-30 | S$1 |
| SOMPO INSURANCE SINGAPORE PTE. LTD. | PLACEMENT OF INSURANCE POLICIES FOR JTC'S CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS | 2023-03-30 | S$1 |
| MS FIRST CAPITAL INSURANCE LIMITED | PLACEMENT OF INSURANCE POLICIES FOR JTC'S CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS | 2023-03-30 | S$1 |
| ZURICH INSURANCE COMPANY LTD (SINGAPORE BRANCH) | PLACEMENT OF INSURANCE POLICIES FOR JTC'S CORPORATE INSURANCE PROGRAMME FOR A PERIOD OF 2 YEARS | 2023-03-30 | S$1 |
| ARCHITECTS TEAM 3 PTE. LTD. | PROVISION OF MULTI-DISCIPLINARY CONSULTANCY SERVICES FOR ADDITIONS & ALTERATIONS OF PENJURU RECREATION CENTRE AT 27 PENJURU WALK | 2023-03-14 | S$7.5 |
| SMM PTE. LTD. | Appointment of Facilities Management Company for Facilities Maintenance of Land-based Properties for a Period of 3 years | 2023-02-24 | S$34,905,825 |
| AIK LEONG PLUMBING CONSTRUCTION PTE LTD | Sewer Upgrading at Tuas-Pioneer Industrial Estate | 2023-02-15 | S$28,108,000 |
| RSP ARCHITECTS PLANNERS & ENGINEERS (PTE) LTD | Provision Of Multi-Disciplinary Consultancy Services for The Proposed Addition and Alteration (A&A) Works for Block 28 Ayer Rajah Crescent | 2023-02-01 | S$5.68 |
| AECOM SINGAPORE PTE. LTD. | Provision of Specialist Consultancy Services for Environmental Impact Assessment (EIA) Studies at Tengah Heavy Vehicle Parking (HVP), Cleantech Park (CTP) and Bahar Estate | 2022-12-29 | S$912,800 |
| DHI WATER & ENVIRONMENT (S) PTE. LTD. | Provision of Specialist Consultancy Services for Environmental Impact Assessment (EIA) Studies at Tengah Heavy Vehicle Parking (HVP), Cleantech Park (CTP) and Bahar Estate | 2022-12-29 | S$176,990 |
| ENTIIS PTE. LTD. | Procurement of privilege activity recording system (ObserveIT) software licensing support and maintenance for 2 years | 2022-12-29 | S$136,326.92 |
| IZENO PRIVATE LIMITED | Provision of Software License Maintenance for JTC DATAHUB | 2022-12-27 | S$1,093,541.5 |
| ERNST & YOUNG ADVISORY PTE. LTD. | Consultancy Services for Manpower Resource Optimisation | 2022-12-19 | S$600,000 |
| STARHUB LTD. | Nominated Sub-Contract for Information Communication Technology (ICT) Systems at Integrated Business Park Development on CC1, CC2 and CC3 at Punggol Digital District | 2022-12-05 | S$7,986,678 |
| CAPGEMINI SINGAPORE PTE. LTD. | Engagement of Services for the Research and Consultancy, System Development, Implementation, and Application Maintenance Services of Customer Service Portal (CSP) | 2022-11-28 | S$6,886,350 |
| ABSOLUT OUTDOORS PTE. LTD. | SUPPLY AND INSTALLATION OF PARASOLS AND PICNIC BENCHES FOR JTC RECREATION CENTRES | 2022-11-11 | S$310,308 |
| ADSAN LAW LLC | APPOINTMENT OF LAW FIRM(S) AS STRATEGIC LEGAL PARTNER FOR ARREARS MANAGEMENT SERVICES FOR A PERIOD OF THREE (3) YEARS | 2022-11-04 | S$1 |
| SAVILLS PROPERTY MANAGEMENT PTE. LTD. | APPOINTMENT OF MANAGING AGENT FOR VARIOUS ESTATES UNDER EAST DIVISION | 2022-10-21 | S$1,457,280 |
| SH INTEGRATED SERVICES PTE. LTD. | Penjuru Recreation Centre - Synthetic Field Returfing, Installation of New Lightings and Resurfacing of Courtyard | 2022-10-21 | S$1,388,000 |
| RECLAIMS ENTERPRISE PTE. LTD. | Proposed Demolition Works at 47A Jalan Buroh | 2022-10-21 | S$188,000 |
| WSH EXPERTS PTE. LTD. | 2 YEARS TERM CONTRACT FOR PROVISION OF CONTRACTS OFFICERS | 2022-10-14 | S$5,120 |
| CHARTWORTH ENTERPRISE SINGAPORE PTE. LTD. | Proposed Site Clearance at Woodlands Wafer Fab Park | 2022-10-04 | S$5,524,020 |
| QXY RESOURCES PTE. LTD. | Reinstatement & Refurbishment (R&R) of Black and White Walk-ups and Semi-detach Houses in Wessex | 2022-09-30 | S$15,300,000 |
| FLEMINGS SAFETY PTE. LTD. | 3-YEAR TERM CONTRACT FOR PROCUREMENT OF PERSONAL PROTECTIVE EQUIPMENT (PPE) [SAFETY BOOTS, SAFETY EYEWEAR, LONG SLEEVE TOP] FOR JTC STAFFS ENTERING CONSTRUCTION WORKSITES AND FACILITIES & ESTATES | 2022-09-26 | S$1 |
| GREENSAFE INTERNATIONAL PTE. LTD. | 2 Year Term Contract for Provision of Workplace Safety and Health Managers | 2022-09-22 | S$20,750 |
| CAPGEMINI SINGAPORE PTE. LTD. | ENGAGEMENT OF SERVICES FOR REQUIREMENT STUDY, DESIGN, DEVELOPMENT, TESTING AND IMPLEMENTATION OF GIS PLATFORM ON GCC ENVIRONMENT | 2022-09-20 | S$845,320 |
| ENVIROSOLUTIONS & CONSULTING PTE. LTD. | PROVISION OF AIR QUALITY MONITORING SERVICES AT WOODLANDS WAFER FAB PARK AND NORTH COAST WAFER FAB PARK | 2022-09-19 | S$303,000 |
| MS FIRST CAPITAL INSURANCE LIMITED | PLACEMENT OF INSURANCE POLICIES FOR THE OPERATION OF JURONG ROCK CAVERNS FOR A PERIOD OF ONE YEAR | 2022-08-31 | S$1 |
| PROPELL INTEGRATED PTE LTD | 12 MONTHS TERM CONTRACT FOR LICENSING AND SERVICING OF ELECTRICAL INSTALLATION AT VARIOUS JTC INDUSTRIAL ESTATES | 2022-08-24 | S$452,514 |
| HWA AIK ENGINEERING PTE. LTD. | Proposed Demolition Works at 1 Pasir Ris Coast Industrial Park 1, 70 Pasir Ris Farmway 1, 63 Pasir Ris Farmway 3 and Substation | 2022-08-16 | S$1,858,000 |
| CPG FACILITIES MANAGEMENT PTE LTD | 24/7 CALL CENTER OPERATION FOR JTC ESSENTIAL SERVICES CENTRE | 2022-08-15 | S$98,126 |
| HOWDEN INSURANCE BROKERS (S.) PTE. LIMITED | Appointment of Insurance Broker for a Period of 3 Years | 2022-07-29 | S$2 |
| CH2M HILL SINGAPORE PRIVATE LIMITED | Multi-Disciplinary Consultancy Services for the Site Specific Engineering Study for Climate Change Adaptation Planning for Jurong Island | 2022-07-29 | S$10,314,861.2 |
| MEINHARDT (SINGAPORE) PTE LTD | Provision of Accredited Checking Organisation and Accredited Checker(Geotechnical) Services for Construction of Infrastructure Works at Bulim (Phase 2) | 2022-07-28 | S$668,500 |
| HY M&E CONSULTANCY SERVICES PTE. LTD. | PROVISION OF EARTHING SPECIALIST CONSULTANCY SERVICES FOR PROPOSED 66kV SUBSTATION AT LOYANG DRIVE NORTH | 2022-07-22 | S$45,000 |
| HWA AIK ENGINEERING PTE. LTD. | Proposed Demolition of Existing Factory Buildings and Ancillary Structures at Sungei Kadut, Kranji Loop and Defu Lane | 2022-07-21 | S$1,787,000 |
| OGP KONSULT PTE. LTD. | MULTI-DISCIPLINARY CONSULTANCY SERVICES FOR PROPOSED REPAIRS AND REFURBISHMENT WORKS AT JURONG ISLAND (JI) CHECKPOINT, JURONG PIER ROAD JETTY AND ACCESS ROADS TO PULAU DAMAR LAUT (PDL) | 2022-07-21 | S$196,008.35 |
| CTM FACILITIES MANAGEMENT PTE. LTD. | APPOINTMENT OF FACILITY MANAGEMENT COMPANY FOR THE PROVISION OF FACILITIES MAINTENANCE SERVICES TO COCHRANE RECREATION CENTRE FOR A PERIOD OF 2 YEARS & 7 MONTHS | 2022-07-19 | S$2,710,769.9 |
| AIK SUN DEMOLITION & ENGINEERING PTE LTD | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | 2022-07-14 | S$1 |
| HAO DA PTE LTD | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | 2022-07-14 | S$0.01 |
| NEO & GOH CONSTRUCTION PTE LTD | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | 2022-07-14 | S$0.1 |
| BENG SOON MACHINERY SERVICES (SINGAPORE) PTE LTD | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | 2022-07-14 | S$1 |
| AIK LEONG PLUMBING CONSTRUCTION PTE LTD | Sewer Upgrading at Benoi-Gul Industrial Estate | 2022-07-14 | S$22,490,000 |
| HWA AIK ENGINEERING PTE. LTD. | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | 2022-07-14 | S$1 |
| PENG CHUAN ENGINEERING CONSTRUCTION PTE. LTD. | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | 2022-07-14 | S$1 |
| RECLAIMS ENTERPRISE PTE. LTD. | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | 2022-07-14 | S$1 |
| SHENGJIE ENGINEERING PTE. LTD. | Prequalification of Contractors for Listing on JTC's Panel of Demolition Contractors for a Period of 3 Years | 2022-07-14 | S$0.01 |
| MAO SHENG QUANJI CONSTRUCTION PTE LTD | TERM CONTRACT FOR ARBORICULTURE, HORTICULTURE & TURF WORKS MAINTENANCE TO JTC PROPERTIES AND LAND (EAST) FOR A PERIOD OF 1 YEAR | 2022-07-13 | S$351,600 |
| KJS CONSTRUCTION PTE LTD | PROPOSED REPAIR & REFURBISHMENT WORKS AT TOA PAYOH INDUSTRIAL PARK | 2022-07-13 | S$7,868,443 |
| TUAS POWER LTD | Jurong Island Renewable Energy Request for Proposal | 2022-07-13 | S$2,144,274 |
| KEPPEL ENERGY NEXUS PTE. LTD. | Jurong Island Renewable Energy Request for Proposal | 2022-07-13 | S$900,000 |
| VFLOWTECH PTE. LTD. | Jurong Island Renewable Energy Request for Proposal | 2022-07-13 | S$2,096,300 |
| JONES LANG LASALLE PROPERTY CONSULTANTS PTE LTD | Appointment of Facilities Management Company for Facilities Maintenance of East Department 2 Properties for a Period of 3 Years | 2022-07-08 | S$37,027,684.5 |
| FUJIFILM BUSINESS INNOVATION SINGAPORE PTE. LTD. | Engagement of Services for the Implementation and Maintenance of Secure Electronic Signature (SES) Digital Signature System | 2022-06-21 | S$357,812 |
| DHI WATER & ENVIRONMENT (S) PTE. LTD. | Specialist Consultancy Services for Environmental Impact Studies at Woodlands North Coast (WNC) | 2022-06-16 | S$435,500 |
| TUV SUD PSB PTE. LTD. | Appointment of Specialist Professional Engineer(s) to Perform Inspections for Lifts in all JTC Properties | 2022-06-15 | S$1 |
| TONG SHING CONTRACTORS PRIVATE LIMITED | 2+1 Year Term Contract for Minor Civil Engineering Works | 2022-06-13 | S$3 |
| SWEE BUILDERS PTE LTD | 2+1 Year Term Contract for Minor Civil Engineering Works | 2022-06-13 | S$3 |
| FREIGHT LINKS EXPRESS ARCHIVERS PTE LTD | 2-Year Term Contract for the Provision of Storage and Records Management Services | 2022-06-09 | S$144,000 |
| KJS CONSTRUCTION PTE LTD | Proposed Additions & Alterations to Eating House at 71 Tuas Avenue 1 | 2022-06-02 | S$886,976 |
| ZARCH COLLABORATIVES PTE. LTD. | Provision Of Multi-Disciplinary Consultancy Services For The Regularisation Of Fire Safety Works (R&R) To Existing Fusionopolis 1 Building | 2022-06-02 | S$8.8 |
| BSG LANDSCAPE & CONSTRUCTION PTE. LTD. | 2-YEAR TERM CONTRACT FOR PROVISION OF HORTICULTURE SERVICES AT JURONG ISLAND CHECKPOINT | 2022-06-01 | S$47,030 |
| DING SHENG ENGINEERING PTE LTD | PROPOSED REINSTATEMENT OF VACANT UNIT AT BLK 16 DEFU LANE 10 #01-374 AND REPAIR/STRENGTHEN THE EXISTING STRUCTURE FOR BOTH UNITS #01-372 (OCCUPIED UNIT) AND #01-374 AND PROPOSED RECONSTRUCTION AND REPAIR WORKS TO BLK 1081 EUNOS AVE 7 FIRE AFFECTED UNIT #01-170 & #01-172 | 2022-05-23 | S$651,380 |
| SOIL INVESTIGATION PTE. LIMITED | 2-Year Term Contract for Geophysical and Survey Works for JTC Estates | 2022-05-13 | S$1 |
| RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | 2-Year Term Contract for Geophysical and Survey Works for JTC Estates | 2022-05-13 | S$1 |
| TALOGY (SINGAPORE) PTE. LTD. | Provision of Psychometric Assessments for a Period of 2 Years | 2022-05-10 | S$40,000 |
| GOH SIN GUAN HUAT PTE LTD | Proposed Infrastructure Works at Tuas South Coast and Tuas South View Avenue 14 Extension | 2022-04-11 | S$18,888,000 |
| AECOM SINGAPORE PTE. LTD. | PROVISION OF CONSULTANCY SERVICES FOR RECLAMATION AT LORONG HALUS | 2022-04-06 | S$2,750,000 |
| AECOM SINGAPORE PTE. LTD. | 24 MONTHS TERM CONTRACT FOR PROVISION OF ENVIRONMENTAL ADVISORY SERVICES (YEAR 2022) | 2022-04-05 | S$426,500 |
| BETH-EL (ASIA PACIFIC) PTE. LTD. | Provision of Security & Blast Consultancy Services for 66kV Substation at Loyang Drive North | 2022-03-31 | S$160,000 |
| HCL SINGAPORE PTE. LTD. | Engagement of Services for the System Development, Implementation, and Application Maintenance Services of ATLAS for JTC | 2022-03-31 | S$3,430,011 |
| KHIM SEAH ENTERPRISE PTE. LTD. | 1-Year Term Contract for the Provision of Shuttle Bus Services at International Business Park | 2022-03-22 | S$110,250 |
| PROSEGUR SINGAPORE PTE. LTD. | Provision of Unarmed Security Manpower Services and Systems at Jurong Island for a Period of 5 Years | 2022-03-17 | S$38,825,507 |
| AETOS SECURITY MANAGEMENT PTE. LTD. | Provision of Armed Security Manpower Services at Jurong Island for a period of 5 years | 2022-03-17 | S$37,030,980 |
| YJP SURVEYORS PTE LTD | 3-Year Term Contract for Engineering Surveys | 2022-03-15 | S$2 |
| CAK & FG SURVEY PTE. LTD. | 3-Year Term Contract for Engineering Surveys | 2022-03-15 | S$1 |
| SIEMENS PTE. LTD. | NSC for Building Management System at Integrated Business Park Development on CC1, CC2 and CC3 at PDD | 2022-03-10 | S$4,131,109 |
| C&W SERVICES (S) PTE. LTD. | Appointment of Facilities Management Company for Facilities Maintenance of Central Department 1 Properties for a Period of 3 Years | 2022-02-09 | S$62,505,135.22 |
| ENSIGN INFOSECURITY (SMARTTECH) PTE. LTD. | Engagement of services for the provision of vulnerability and compliance management solution for JTC for 3 years | 2022-01-28 | S$477,880 |
| ABL CONSULTANTS PTE. LTD. | Provision of Single Disciplinary Consultancy Services (Civil & Structural Engineering) for Land Preparation and Infrastructure Works at Woodlands Wafer Fabrication Park (WFP) | 2022-01-28 | S$3.6 |
| AECOM SINGAPORE PTE. LTD. | Provision of Professional Engineering Services to conduct Landfill Gas Study And Sampling Study at Lorong Halus | 2022-01-26 | S$335,000 |
| FUJITSU ASIA PTE LTD | ENGAGEMENT OF SERVICES FOR THE SUPPLY, MIGRATION, IMPLEMENTATION AND APPLICATION MANAGEMENT SERVICES OF DOCUMENT MANAGEMENT SYSTEM 2.0 (DMS 2.0) FOR JTC | 2022-01-25 | S$4,794,669 |
| AQUAFORCE PRIVATE LIMITED | 18 MONTHS TERM CONTRACT FOR MAINTENANCE OF WATER PUMPING SYSTEM, POTABLE WATER SERVICE INSTALLATION AND WATER TANK CLEANING AT VARIOUS JTC INDUSTRIAL ESTATES | 2022-01-14 | S$243,252.5 |
| MOTT MACDONALD SINGAPORE PTE LIMITED | PROVISION OF ENVIRONMENTAL SUSTAINABLE DESIGN (ESD) CONSULTANCY SERVICES FOR WIND DRIVEN RAIN (WDR) SIMULATION AND FACADE TYPOLOGIES STUDIES FOR JTC DEVELOPMENTS | 2022-01-10 | S$298,000 |
| CPG CONSULTANTS PTE LTD | JTC's TERM CONTRACT TENDER FOR RENDERING OF TRAFFIC AND TRANSPORT CONSULTANCY SERVICES FOR A PERIOD OF 2 YEARS | 2022-01-06 | S$3 |
| IZENO PRIVATE LIMITED | Provision of Software License Maintenance for JTC Datahub | 2021-12-30 | S$347,173.02 |
| FONG CONSULT PTE. LTD. | PERIODIC STRUCTURAL INSPECTION AT VARIOUS JTC PROPERTIES | 2021-12-21 | S$239,400 |
| STERLING ENGINEERS PTE. LTD. | PERIODIC STRUCTURAL INSPECTION AT VARIOUS JTC PROPERTIES | 2021-12-21 | S$39,100 |
| NCS PTE. LTD. | SUPPLY, DELIVERY AND MAINTENANCE OF WEBPAGE DEFACEMENT DETECTION AND AUTO-REPLACEMENT SOLUTION ON GCC | 2021-12-17 | S$223,753 |
| CBRE GWS PTE. LTD. | APPOINTMENT OF FACILITY MANAGEMENT COMPANY FOR FACILITIES MAINTENANCE OF CENTRAL DEPARTMENT 3 PROPERTIES FOR A PERIOD OF 3 YEARS | 2021-12-03 | S$31,333,826.81 |
| O'CONNOR'S SINGAPORE PTE LTD | Nominated Sub-Contract for Integrated Security Management System at Integrated Business Park Development on CC1, CC2 and CC3 at Punggol Digital District | 2021-11-17 | S$2,736,663 |
| KJS CONSTRUCTION PTE LTD | TERM CONTRACTS FOR FACTORY UNIT REINSTATEMENT WORKS AT VARIOUS JTC INDUSTRIAL PROPERTIES UNDER CENTRAL & EAST ZONES FOR ONE YEAR | 2021-11-09 | S$1 |
| ESPIRIT BUILDING & ENGINEERING PTE. LTD. | TERM CONTRACTS FOR FACTORY UNIT REINSTATEMENT WORKS AT VARIOUS JTC INDUSTRIAL PROPERTIES UNDER CENTRAL & EAST ZONES FOR ONE YEAR | 2021-11-09 | S$1 |
| TOKIO MARINE INSURANCE SINGAPORE LTD. | Insurance Contracts for JTC's Work Injury Compensation, Group Personal Accident and Group Term Life Insurance Programme for a Period of 2 years | 2021-10-28 | S$1 |
| SINGAPORE LIFE LTD. | Insurance Contracts for JTC's Work Injury Compensation, Group Personal Accident and Group Term Life Insurance Programme for a Period of 2 years | 2021-10-28 | S$1 |
| ZURICH INSURANCE COMPANY LTD (SINGAPORE BRANCH) | Insurance Contracts for JTC's Work Injury Compensation, Group Personal Accident and Group Term Life Insurance Programme for a Period of 2 years | 2021-10-28 | S$1 |
| WSH EXPERTS PTE. LTD. | PROVISION OF MANPOWER FOR VEGETATION CLEARING SERVICES TO FACILITATE LAND SURVEYING WORKS FOR JTC CORPORATION | 2021-10-28 | S$169,200 |
| CONCORDE SECURITY PTE. LTD. | Provision of Security Manpower Services for JTC Properties at Eastern Part of Singapore | 2021-10-27 | S$547,650 |
| 800 SUPER WASTE MANAGEMENT PTE LTD | 2-YEAR TERM CONTRACT FOR CLEANING AND CONSERVANCY SERVICES AT VARIOUS JTC INDUSTRIAL ESTATES INCLUDING VACANT LANDS AND ROADS | 2021-10-11 | S$6,202,302 |
| LS 2 SERVICES PTE LTD | 2-YEAR TERM CONTRACT FOR CLEANING AND CONSERVANCY SERVICES AT VARIOUS JTC INDUSTRIAL ESTATES INCLUDING VACANT LANDS AND ROADS | 2021-10-11 | S$11,388,000 |
| KPMG SERVICES PTE. LTD. | Provision of Internal Audit Services for 3 Years | 2021-10-01 | S$505,500 |
| GEONAMICS (S) PTE LTD | Soil Investigation and Survey works at Lorong Halus (along Serangoon Harbour) | 2021-09-28 | S$1,939,677.5 |
| DHI WATER & ENVIRONMENT (S) PTE. LTD. | MARINE ENVIRONMENTAL IMPACT ASSESSMENT AND SHIP HANDLING STUDY AT LORONG HALUS | 2021-09-28 | S$1,998,888 |
| KPMG SERVICES PTE. LTD. | JTC Innovation Challenge - Phase 1: Automation and Productivity | 2021-09-27 | S$245,780 |
| SMM PTE. LTD. | Reinstatement Works to Factory Converted Dormitories | 2021-09-13 | S$266,500 |
| ACEPROJECT CONSTRUCTION PTE. LTD. | Reinstatement Works to Factory Converted Dormitories | 2021-09-13 | S$258,861 |
| HD CONTRACTOR PTE. LTD. | PROPOSED REPAIRS AND REFURBISHMENT WORKS TO TERRACE WORKSHOPS AT TOA PAYOH INDUSTRIAL PARK BLOCK 11, INCLUDING BACKYARD RECONSTRUCTION | 2021-09-09 | S$1,912,827 |
| NATIONAL UNIVERSITY OF SINGAPORE | JTC innovation Challenge - Phase 3: Sustainability And Resilience | 2021-08-31 | S$229,358.4 |
| SINGAPORE INSTITUTE OF TECHNOLOGY | JTC innovation Challenge - Phase 3: Sustainability And Resilience | 2021-08-31 | S$245,160 |
| AEQON TJ PTE. LTD. | 2-YEAR TERM CONTRACT FOR COMPREHENSIVE MAINTENANCE OF NON-PROPRIETARY SECURITY SYSTEMS AT JURONG ISLAND CHECKPOINT AND PULAU DAMAR LAUT CHECKPOINT | 2021-08-26 | S$539,400 |
| KPMG SERVICES PTE. LTD. | Engagement of Consultancy Services for Finance Data Analytics | 2021-08-06 | S$100,000 |
| QXY RESOURCES PTE. LTD. | PROPOSED REPAIR & REDECORATION WORKS AT BEDOK INDUSTRIAL ESTATE | 2021-07-28 | S$27,517,400 |
| CBRE GWS PTE. LTD. | Appointment of FMC to provide Start-up Operations and Maintenance Services for new developments for a period of 3 years | 2021-07-23 | S$9,282,781.65 |
| NCS PTE. LTD. | Provision of Maintenance Contract for IT Equipment | 2021-07-21 | S$2,911,632 |
| INTEGRATED HEALTH PLANS PTE LTD | PROVISION OF MANAGED MEDICAL HEALTHCARE SERVICE TO JTC CORPORATION | 2021-07-15 | S$1 |
| NCS PTE. LTD. | Provision of VMWARE Licenses renewal and support services | 2021-07-14 | S$726,665 |
| WIPRO NETWORKS PTE. LIMITED | APPLICATION MANAGEMENT SERVICES FOR DOCUMENT MANAGEMENT SYSTEM (DMS) FOR JTC | 2021-07-13 | S$910,000 |
| CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED SINGAPORE BRANCH | PROPOSED CONSTRUCTION OF (A) DLN RAMP AND ASSOCIATED FACILITY BUILDINGS AND (B) ROAD TUNNEL LINKING BAHAR TO BULIM (PART 1) | 2021-07-09 | S$135,000,000 |
| EQUATION TECHNOLOGY & CABLING PTE LTD | NOMINATED SUB-CONTRACT FOR STRUCTURED CABLING SYSTEM AT INTEGRATED BUSINESS PARK DEVELOPMENT ON CC1, CC2 AND CC3 AT PUNGGOL DIGITAL DISTRICT | 2021-07-02 | S$2,305,748.04 |
| MANPOWER STAFFING SERVICES (SINGAPORE) PTE LTD | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | 2021-06-09 | S$1 |
| RMA CONSULTANTS PTE LTD | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | 2021-06-09 | S$1 |
| EPS CONSULTANTS PTE LTD | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | 2021-06-09 | S$1 |
| GOOD JOB CREATIONS (SINGAPORE) PTE. LTD. | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | 2021-06-09 | S$1 |
| RGF TALENT SOLUTIONS SINGAPORE PTE. LTD. | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | 2021-06-09 | S$1 |
| DIGI ENGINEERING PTE. LTD. | TWO (2) YEARS TERM CONTRACT FOR MAINTENANCE OF FIRE PROTECTION SYSTEMS AT JTC PROPERTIES | 2021-05-25 | S$373,773 |
| OES TECHNOLOGY PTE. LTD. | Provision of Facial Recognition Access Control with 2 Years Maintenance at JTC Summit | 2021-05-21 | S$179,400 |
| AEDGE HOLDINGS PTE. LTD. | 2-YEAR TERM CONTRACT FOR THE PROVISION OF SHUTTLE BUS SERVICE AT SELETAR AEROSPACE PARK AND CLEANTECH PARK | 2021-05-19 | S$591,888 |
| RHYTHME TECHNOLOGY PTE LTD | TWO (2) YEARS TERM CONTRACT FOR MAINTENANCE OF FIRE PROTECTION SYSTEMS AT AMK AUTOPOINT, AMK TECH 2, AMK TECHLINK, YS-ONE AND SIN MING AUTOCARE | 2021-05-18 | S$487,680 |
| BAN CHON CORPORATION & TRADING PTE LTD | Construction of Roads, Drains, Sewers and Ancillary Works at Tuas link 4 / Tuas Link Drive | 2021-05-18 | S$4,798,000 |
| RYOBI GEOTECHNIQUE INTERNATIONAL PTE. LTD. | PROPOSED INSTRUMENTATION AND MONITORING WORKS FOR (A) DLN RAMP AND ASSOCIATED FACILITY BUILDINGS AND (B) ROAD TUNNEL LINKING BAHAR TO BULIM (PART 1) | 2021-04-27 | S$557,000 |
| MAXI MORRIE ENGINEERING PTE. LTD. | PROVISION OF AUTOMATED BARRIER SYSTEM AT JURONG ISLAND CHECKPOINT | 2021-04-26 | S$431,836 |
| ST ENGINEERING CLOUD AND DATA CENTRE SOLUTIONS PTE. LTD. | Design, Development And Fit Out Proposed Data Centre With 5 + 5 Years Maintenance At No. 81 Jurong Island Highway | 2021-04-13 | S$6,552,775 |
| EASE SOLUTIONS PTE. LTD. Not yet published | PROVISION OF JIRA SERVICE MANAGEMENT (DATA CENTER) AND PLUGINS SUBSCRIPTION WITH MAINTENANCE FOR JTC | 2026-02-11 | S$197,271 |
| EASE SOLUTIONS PTE. LTD. Not yet published | PROVISION OF JIRA SERVICE MANAGEMENT (DATA CENTER) AND PLUGINS SUBSCRIPTION WITH MAINTENANCE FOR JTC | 2025-03-05 | S$166,658.84 |
| CSN CONSULTANTS PTE. LTD. Not yet published | 2+1 YEAR TERM QUANTITY SURVEYING CONSULTANCY SERVICES FOR PROPOSED DEMOLITION OF EXISTING JTC FACTORY BUILDINGS AND ANCILLARY STRUCTURES | 2024-08-20 | S$3 |
| HARVEST CONSULTING ENGINEERS LLP Not yet published | JTC's Independent Civil and Structural Consultancy Panel on Infrastructure Projects for a period of 2+1+1 years | 2024-07-30 | S$2 |
| QS CONSULTANTS PTE. LTD. Not yet published | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | 2024-04-18 | S$2 |
| CSN CONSULTANTS PTE. LTD. Not yet published | JTC's Independent Quantity Surveying Consultancy Panel for a Period of 2 + 1 + 1 Years | 2024-04-18 | S$1 |
| EASE SOLUTIONS PTE. LTD. Not yet published | Provision of JIRA Service Management (Data Center) and Plugins Subscription with Maintenance for JTC | 2024-02-29 | S$148,750.75 |
| RAJAH & TANN SINGAPORE LLP Not yet published | Appointment of Law Firm(s) as Strategic Legal Partner for Advisory and Dispute Resolution Services for a period of two (2) years | 2023-10-25 | S$1 |
| EASE SOLUTIONS PTE. LTD. Not yet published | Provision of Software Licenses Maintenance for JIRA Service Management and Plugins for JTC Corporation | 2023-04-14 | S$102,987.35 |
| EASE SOLUTIONS PTE. LTD. Not yet published | Provision of Software Licenses Maintenance for JIRA Service Management and Plugins for JTC Corporation | 2022-04-29 | S$110,534.12 |
| JMJ ASSOCIATES ASIA PACIFIC (PTE.) LTD. Not yet published | PROVISION OF CONSULTANCY SERVICE TO BUILD WORKPLACE SAFETY AND HEALTH CULTURE FOR JTC CONSTRUCTION PROJECTS | 2021-06-23 | S$435,000 |
| GLOBAL SEARCH PARTNERS PTE. LTD. Not yet published | Appointment of a Panel of Recruitment Agencies to provide Contingent Search Services to fill JTC Employee Positions for a Period of 2 Years | 2021-06-09 | S$1 |
| CUSHMAN & WAKEFIELD VHS PTE. LTD. Not yet published | ENGAGEMENT OF CONSULTANCY SERVICES FOR INTERNATIONAL INDUSTRIAL LAND BENCHMARKING STUDY | 2021-04-27 | S$1 |
Contains information from ACRA Information on Corporate Entities accessed on 2026-11-04 from data.gov.sg which is made available under the terms of the Singapore Open Data Licence version 1.0 (https://data.gov.sg/open-data-licence).
Contains information from Government Procurement via GeBIZ accessed on 2026-11-04 from data.gov.sg which is made available under the terms of the Singapore Open Data Licence version 1.0 (https://data.gov.sg/open-data-licence).
Company data as of 2026-10-14. Sole proprietorships, partnerships and entities whose registered particulars would identify a natural person are not listed — see data sources & methodology.
UEN Lookup is an independent website, not a service of ACRA or any other government agency. It is not an official business register: for official records use bizfile.gov.sg.
Spotted an error, or want a company removed? Use the contact form — no justification required for removal.